Resolution 2018- April 17, 2018
ATTACHMENT 1
RESOLUTION 2018-
RESOLUTION OF THE TOWN COUNCIL
OF THE TOWN OF LOS GATOS ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR
2018/19 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our Town are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the Town must adopt a list of all projects proposed to receive funding from
the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution,
which must include a description and the location of each proposed project, a proposed
schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the Town, will receive an estimated $556,000 in RMRA funding in Fiscal Year
2018/19 from SB 1; and
WHEREAS, this is the second year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the communities’ priorities for transportation investment; and
WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment
found that the Town’s streets and roads are in a fair condition and this revenue will help us
2 of 3
Resolution 2018- April 17, 2018
ATTACHMENT 1
increase the overall quality of our road system and over the next decade will bring our streets
and roads into a good condition; and
NOW, THEREFORE, BE IT RESOLVED: The fiscal year 2018-19 list of projects planned to
be funded with Road Maintenance and Rehabilitation Account revenues include:
Location Description Scheduled
Completion
Estimated
Useful Life
National from Samaritan to Los
Gatos-Almaden Road
Placement of rubber cape seal or overlay
to maintain pavement surface. This is an
collector road and is critical for transit
needs in the Town.
Fall 2019 10 - 25 years
Knowles from Dardanelli to Dell Placement of rubber cape seal or overlay
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
Fall 2020 10 - 25 years
Union Avenue from Blossom Hill
Road to Los Gatos-Almaden Road
Placement of rubber cape seal or overlay
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
Fall 2021 10 - 25 years
Quito Road from Bicknell to
Woodbank
Placement of rubber cape seal or overlay
to maintain pavement surface. This is a
collector road and is critical for transit
needs in the Town.
Fall 2022 10 - 25 years
3 of 3
Resolution 2018- April 17, 2018
ATTACHMENT 1
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los
Gatos, California, held on the 17th day of April of 2018 by the following vote:
COUNCIL MEMBERS:
AYES:
NAYS:
ABSENT:
ABSTAIN:
SIGNED:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: __________________
ATTEST:
CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: __________________