Loading...
Attachment 1 1 of 3 Resolution 2018- April 17, 2018 ATTACHMENT 1 RESOLUTION 2018- RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2018/19 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our Town are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the Town must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the Town, will receive an estimated $556,000 in RMRA funding in Fiscal Year 2018/19 from SB 1; and WHEREAS, this is the second year in which the Town is receiving SB 1 funding and will enable the Town to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the Town used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities’ priorities for transportation investment; and WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment found that the Town’s streets and roads are in a fair condition and this revenue will help us 2 of 3 Resolution 2018- April 17, 2018 ATTACHMENT 1 increase the overall quality of our road system and over the next decade will bring our streets and roads into a good condition; and NOW, THEREFORE, BE IT RESOLVED: The fiscal year 2018-19 list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues include: Location Description Scheduled Completion Estimated Useful Life National from Samaritan to Los Gatos-Almaden Road Placement of rubber cape seal or overlay to maintain pavement surface. This is an collector road and is critical for transit needs in the Town. Fall 2019 10 - 25 years Knowles from Dardanelli to Dell Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Fall 2020 10 - 25 years Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Fall 2021 10 - 25 years Quito Road from Bicknell to Woodbank Placement of rubber cape seal or overlay to maintain pavement surface. This is a collector road and is critical for transit needs in the Town. Fall 2022 10 - 25 years 3 of 3 Resolution 2018- April 17, 2018 ATTACHMENT 1 PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 17th day of April of 2018 by the following vote: COUNCIL MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA DATE: __________________ ATTEST: CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA DATE: __________________