Loading...
Attachment 25March 30, 2018 Project No. 0084491960 Mr. Mike Weisz, PE Associate Engineer Town of Los Gatos 41 Miles Avenue Los Gatos, CA 95030 Subject: Geotechnical Peer Review 401-409 Alberto Way Los Gatos, California Reference : amec foster wheeler 1. Letter titled "401-409 Alberto Way, CONSTRUCTION SETTLEMENT & DEWATERING MONITORING RESPONSE", by Engeo, dated March 28 , 2018. Dear Mr. Weisz: At your request, Amee Foster Wheeler Environment and Infrastructure Inc. (Amee Foster Wheeler) has reviewed the reference above pertaining to the proposed construction of a new office development at 401-409 Alberto Way, Los Gatos, California. Our review pertains to the geotechnical/geologic components of the proposed project. Amee Foster Wheeler is familiar with the project because we previously performed a geologic/geotechnical peer review of the following documents submitted for this project, including : 1. Engeo; Geotechnical Exploration , 401 Alberto Way, Los Gatos, California , dated July 17, 2015. 2 . Letter titled "405 Alberto Way , Arch itecture and Site Application S-15-056, Condition Use Permit Application U-15-009, APN 529-23-018", by LP Acquisitions Real Estate Development, dated November 17, 2017; 3. Letter titled "Alberto Way Citizens Petition Request for Changes to Lamb Partner's November 17, 405 Alberto Way Design ", attachment to email from Bob Burke, dated December 6 , 2017; and 4. Letter titled "401-409 Alberto Way, December Supplemental Response", by Engeo, dated December 12, 2017. Our comments related to the July 17, 2015 document were summarized in a letter to you dated December 4 , 2015 . Our comments related to remaining references were summarized to you in a letter dated December 12, 2017. We also provided a supplemental review letter in response to comments from the publ ic in advance of the May 10, 2017 Planning Commission Meeting . In Amee Foster Wheeler En vironment & Infrastructure, Inc. 180 Gra nd Avenue, Suite 1100 Oakl a nd , Califo rni a 94612-3066 USA T el (510) 663-4100 Fax (5 10) 663-41 4 1 a mecfw.com ATTACHMENT 25 Mr. Mike Weisz, PE Associate Engineer Town of Los Gatos March 30, 2018 Page 2 addition to the references, we have reviewed other pertinent reports and maps. Representatives of Amee Foster Wheeler attended Planning Commission meetings on May 10, 2017, September 19, 2017, and December 13, 2017, as well as the October 4, 2017 Town Council meeting. At your request, we reviewed video footage from the February 14, 2018 Planning Commission meeting and the March 20, 2018 Town Council meeting, pertaining to the 401-409 Alberto Way project. It is our opinion that the risk of distress to adjacent properties during construction of the 401-409 Alberto Way project can be mitigated through design and monitoring measures like those discussed in Engeo's March 28, 2018 letter. If the project is approved, we understand the Town expects to review specific details pertaining to shoring and dewatering prior to issuance of a grading permit. The type of information expected to be reviewed by the Town is discussed in our December 12, 2017 letter. Please feel free to contact us should you have questions or require additional information. Sincerely, Amee Foster Wheeler Environment & Infrastructure, Inc. Q,te.A. II. u/~ Robert H. Wright, Ph .D., iG. CEG Principal Engineering Geologist Direct Tel.: (510) 663-4187 E-mail: bob.wright@amecfw.com rhw/cjc/ldu ~~C=:t::._ Christoph~r N outu, ~E. GE Principal Engineer Direct Tel.: (510) 663-4156 E-mail: chris.coutu@amecfw.com x:\BOOOs\8449 .000\8449. 196 _ alberto way\03-30-2018 _peer review\8449.196 peer review ltr _ 033018.docx Amee Foster Wheeler