Loading...
Attachment 24GEOTECHNICAL ENVIRONMENTAL WATER RESOURCES CONSTRUCTION SERVICES 6399 San Ignacio Avenue, Suite 150  San Jose, CA 95119  (408) 574-4900  Fax (888) 279-2698 www.engeo.com Project No. 12175.000.000 March 28, 2018 Revised March 29, 2018 Mr. Mike Weisz Town of Los Gatos 41 Miles Avenue Los Gatos, CA 95030 Subject: 401-409 Alberto Way Los Gatos, California CONSTRUCTION SETTLEMENT & DEWATERING MONITORING RESPONSE Dear Mr. Weisz: At your request, we prepared this letter for your project at 401-409 Alberto Way in Los Gatos, California. Specifically, we are responding to comments that dewatering at the subject project during construction of the below grade parking structure may cause settlement and foundation distress to neighboring properties. We previously prepared a letter (Reference 10, attached) to address these concerns. As described in the attached letter, it is our opinion that dewatering during construction will have a negligible effect to offsite properties for the following reasons: Distance between the proposed basement and offsite properties. Appropriate management of construction dewatering operations. Although excavation and shoring methods for construction are unknown at this time, the details of such operations will be reviewed prior to construction to ensure appropriate methods and practices are employed. Low risk of settlement of site soils (medium dense to very dense clayey gravels). We also presented potential monitoring options that could be implemented during construction to assess the potential for dewatering-related distress to offsite properties. Key aspects of a monitoring program described in the attached letter include: A preconstruction survey to establish baseline surface elevations prior to construction. Periodic surveying of baseline surface points during construction. A preconstruction photo and video survey to document existing conditions at neighboring properties. Installation and monitoring of groundwater wells during construction. Based on site conditions and the employment of typical monitoring procedures used in dewatering projects in the San Francisco Bay Area, we do not anticipate that settlement and distress of offsite ATTACHMENT 24 Town of Los Gatos 12175.000.000 401-409 Alberto Way, Los Gatos March 28, 2018, Revised March 29, 2018 CONSTRUCTION SETTLEMENT & DEWATERING MONITORING RESPONSE Page 2 foundations will pose a significant risk during construction of the subject project. Furthermore, Items 79 through 81 of the proposed Conditions of Approval for the project (Reference 3, attached) address the before mentioned construction related settlement and dewatering concerns and have been agreed to by the Applicant. If you have any questions regarding the contents of this letter, please do not hesitate to contact us. Sincerely ENGEO Incorporated Robert H. Boeche, CEG Greg Cubbon, CEG, PE Uri Eliahu, GE rhb/gc/ue/dt Attachments: Selected References ENGEO, December Supplemental Response Letter (December 12, 2017) Attachment 17, Draft Resolution from the March 20, 2018 Staff Report (Select Page) 12175.000.000 March 28, 2018 Revised March 29, 2018 SELECTED REFERENCES 1. AMEC; Peer Review – Geotechnical Exploration Report; 401 Alberto Way, Los Gatos, California; November 4, 2015. AMEC Project No. 0084491960. 2. AMEC Foster Wheeler; Geotechnical Peer Review; 401-409 Alberto Way, Los Gatos, California; May 8, 2017. AMEC Project No. 084491960. 3. Attachment 17, Draft Resolution from the March 20, 2018 Staff Report. 4. ENGEO; Geotechnical Exploration; 401 Alberto Way, Los Gatos, California; July 17, 2015 (Revised August 13, 2015). ENGEO Project No. 12175.000.000. 5. ENGEO; Response to AMEC Foster Wheeler Peer Review Comments; 401 Alberto Way, Los Gatos, California; January 11, 2016. ENGEO Project No. 12175.000.000. 6. ENGEO; Supplemental Response to Public Comments; 401-409 Alberto Way, Los Gatos, California; April 19, 2017. ENGEO Project No. 12175.000.000. 7. ENGEO; Second Supplemental Response to Public Comments; 401-409 Alberto Way, Los Gatos, California; December 11, 2017. ENGEO Project No. 12175.000.000. 8. ENGEO; November Supplemental Response; 401-409 Alberto Way, Los Gatos, California; November 2, 2017. ENGEO Project No. 12175.000.000. 9. ENGEO; November 6th Supplemental Response; 401-409 Alberto Way, Los Gatos, California; November 6, 2017. ENGEO Project No. 12175.000.000. 10. ENGEO; December Supplemental Response; 401-409 Alberto Way, Los Gatos, California; December 12, 2017. ENGEO Project No. 12175.000.000. 12175.000.000 March 28, 2018 Revised March 29, 2018 ENGEO, December Supplemental Response Letter, 401-409 Alberto Way, Los Gatos, California, December 12, 2017 GEOTECHNICAL ENVIRONMENTAL WATER RESOURCES CONSTRUCTION SERVICES SUBJECT TO ATTORNEY DIRECTION – ATTORNEY WORK PRODUCT 6399 San Ignacio Avenue, Suite 150  San Jose, CA 95119  (408) 574-4900  Fax (888) 279-2698 www.engeo.com Project No. 12175.000.000 December 12, 2017 Ms. Alicia Guerra Buchalter Nemer 55 Second Street, Suite 1700 San Francisco, CA 94105 Subject: 401-409 Alberto Way Los Gatos, California DECEMBER SUPPLEMENTAL RESPONSE Dear Ms. Guerra: At your request, we prepared this supplemental response letter for your project at 401-409 Alberto Way in Los Gatos, California. Specifically, we are responding to comments that the subject project should incorporate construction dewatering guidelines that have recently been implemented for the City of Palo Alto. The City of Palo Alto recently adopted revised Guidelines for Dewatering During Basement or Below Ground Garage Construction as outlined in a memorandum of the same name in May 2017. Pertinent geotechnical items outlined in the document include the following:  Prior to construction, perform pump testing to verify pump rates and determine anticipated drawdown levels of groundwater and radius of influence of dewatering wells.  During construction, observe groundwater levels in monitoring wells and compare groundwater drawdown to that from pump testing. Given the distance of the proposed basement level to neighboring properties and the minimal amount of dewatering required to construct the basement, we anticipate that the radius of influence of dewatering wells will have negligible impact on offsite groundwater levels. Furthermore, as discussed in References 3, 4 and 5, site soils generally consist of medium dense to very dense clayey gravels. The risk of settlement in these soil deposits as a result of temporary dewatering is low. Soils of concern for dewatering are generally soft compressible clays, which are not present at the site. Based on our experience with dewatering projects in the San Francisco Bay Area, a preconstruction survey to establish baseline surface elevations prior to the start of dewatering, periodic surveying of the baseline surface points during construction, and installation and monitoring of groundwater wells during construction are typical measures employed to assess the potential for dewatering-related distress to offsite properties. Due to site conditions and our experience on similar projects, performing pump tests prior to construction is not necessary. Buchalter Nemer 12175.000.000 401-409 Alberto Way, Los Gatos December 12, 2017 DECEMBER SUPPLEMENTAL RESPONSE Page 2 SUBJECT TO ATTORNEY DIRECTION – ATTORNEY WORK PRODUCT If you have any questions regarding the contents of this letter, please do not hesitate to contact us. Sincerely ENGEO Incorporated Robert Boeche, CEG Greg Cubbon, CEG, PE Uri Eliahu, GE Attachment: Selected References SUBJECT TO ATTORNEY DIRECTION – ATTORNEY WORK PRODUCT 12175.000.000 December 12, 2017 SELECTED REFERENCES 1. AMEC; Peer Review – Geotechnical Exploration Report; 401 Alberto Way, Los Gatos, California; November 4, 2015. AMEC Project No. 0084491960. 2. AMEC Foster Wheeler; Geotechnical Peer Review; 401-409 Alberto Way, Los Gatos, California; May 8, 2017. AMEC Project No. 084491960. 3. ENGEO; Geotechnical Exploration; 401 Alberto Way, Los Gatos, California; July 17, 2015 (Revised August 13, 2015). ENGEO Project No. 12175.000.000. 4. ENGEO; Response to AMEC Foster Wheeler Peer Review Comments; 401 Alberto Way, Los Gatos, California; January 11, 2016. ENGEO Project No. 12175.000.000. 5. ENGEO; Supplemental Response to Public Comments; 401-409 Alberto Way, Los Gatos, California; April 19, 2017. ENGEO Project No. 12175.000.000. 6. ENGEO; Second Supplemental Response to Public Comments; 401-409 Alberto Way, Los Gatos, California; December 11, 2017. ENGEO Project No. 12175.000.000. 7. ENGEO; November Supplemental Response; 401-409 Alberto Way, Los Gatos, California; November 2, 2017. ENGEO Project No. 12175.000.000. 8. ENGEO; November 6th Supplemental Response; 401-409 Alberto Way, Los Gatos, California; November 6, 2017. ENGEO Project No. 12175.000.000. 12175.000.000 March 28, 2018 Revised March 29, 2018 Attachment 17, Draft Resolution from the March 20, 2018 Staff Report (Select Page) This Page Intentionally Left Blank