Loading...
Attachment 17North 40 Traffic Scenarios EIR Project A 685 1,526 Project B 470 1,488 Specific Plan Up to 435,000 sf for total new non-residential Up to 250,000 sf for hotel & office combined Up to 400,000 sf for commercial Up to 270 residential units Phase I Size Commercial 68,000 70 312 Pass-by 25%-18 -78 Subtotal 52 234 Residential 237 108 127 Mixed Use Trip Reduction 30%-32 -38 Phase I Total 128 323 Phase 2 non-residential Size Size Size Commercial 332,000 318 1,321 207,000 255 931 117,000 210 610 Pass-by 25%-80 -330 25%-64 -233 25%-53 -153 Subtotal 238 991 191 698 157 457 200-room Hotel (160ksf)200 95 124 200 95 124 General Office 90,000 111 103 Residential 33 17 22 33 17 22 33 17 22 Mixed Use Trip Reduction 30%-5 -7 30%-5 -7 30%-5 -7 Phase 2 Total 332,000 250 1,006 367,000 298 837 367,000 375 699 Phases 1+2 400,000 378 1,329 435,000 426 1,160 435,000 503 1,022 EIR Project A 269 ksf Shopping Center 150-room Hotel (120 ksf) 62.5 ksf Medical Office 62.5 ksf General Office 364 Residential units 364 Residential units Option 3 AM PH PM PH AM PH PM PH AM PH PM PH Option 2 EIR Project B 400 ksf Shopping Center 150-room Hotel (120 ksf) AM PH PM PH AM PH PM PH Option 1 ATTACHMENT 17 This Page Intentionally Left Blank