Copy of Study Session Traffic Prioritization MatrixProject Assessment Matrix
1
2
3
4
5
6
7
8
9
10
11
12
13
14
* The impact rating for each project is the estimation of staff. A blank column is left for notes or personal tracking.
** Timeframe: Short 1-3 years; Some 3-7 years; Long 7-15 years; Very Long > 15 years
Topic
Roundabout @ Wood Road
Hwy 9 Corridor Study
Downtown One Way Streets
Hwy 9 Ramps to Hwy 17
Hwy 17 Widening
Freeway Changeable Message
Reclassify Town Streets
Ramp Metering
Intersection Marking
Work with Mapping Co.
Weekend Events
Traffic Signal Upgrade
School Busing
Auto Trip Reduction Initiative
Impact On*
Cut Through Traffic
A Lot
Little
Some
Little
A Lot
Some
Some
A Lot
Little
A Lot
Little
Some
None
Some
Impact On*
Congestion
Little
A Lot
Little
A Lot
A Lot
Little
Little
Some
Little
Little
Little
A Lot
A Lot
A Lot
Impact On*
Safety
Little
A Lot
Little
A Lot
A Lot
Little
Some
Little
A Lot
Little
Little
Some
A Lot
A Lot
Timeframe**
Short
Short
Long
Long
Very Long
Short
Short
Some
Short
Short
Short
Short
Short
Short
Sayoc
Rennie
Leonardis
Jensen
Spector