Loading...
Copy of Study Session Traffic Prioritization MatrixProject Assessment Matrix 1 2 3 4 5 6 7 8 9 10 11 12 13 14 * The impact rating for each project is the estimation of staff. A blank column is left for notes or personal tracking. ** Timeframe: Short 1-3 years; Some 3-7 years; Long 7-15 years; Very Long > 15 years Topic Roundabout @ Wood Road Hwy 9 Corridor Study Downtown One Way Streets Hwy 9 Ramps to Hwy 17 Hwy 17 Widening Freeway Changeable Message Reclassify Town Streets Ramp Metering Intersection Marking Work with Mapping Co. Weekend Events Traffic Signal Upgrade School Busing Auto Trip Reduction Initiative Impact On* Cut Through Traffic A Lot Little Some Little A Lot Some Some A Lot Little A Lot Little Some None Some Impact On* Congestion Little A Lot Little A Lot A Lot Little Little Some Little Little Little A Lot A Lot A Lot Impact On* Safety Little A Lot Little A Lot A Lot Little Some Little A Lot Little Little Some A Lot A Lot Timeframe** Short Short Long Long Very Long Short Short Some Short Short Short Short Short Short Sayoc Rennie Leonardis Jensen Spector