Loading...
Presentation 2016/17 Annual Street Repair and Resurfacing/Pavement Rehabilitation – Crack Seal Project March 21, 2017  Important to Complete Annual Street Projects 2016/17 Project Separated into 2 Projects: Arterial Asphalt Overlay Project Slurry Seal Project Saves the Town Projects Non -Related Prevents Costly Subcontractor Mark -ups ANNUAL STREET MAINTENACE PROJECT: Blossom Hill Road Los Gatos Boulevard to Cherry Blossom Lane Belgatos Road to Harwood Road (South Side) Albright Development Fees ($414,000) Lark Avenue from Winchester to Arroyo Grande ARTERIAL STREET ASPHALT OVERLAY PROJECT A N N U A L S T R E E T M A I N T E N A N C E Best Practice – Keep Good Streets Good Cost Increases Over Slurry Seal: Rubber Cape Seal 3 X Asphalt Overlay 18 X Slurry Project – Los Gatos Boulevard - HWY 9 to Lark Ave. Crack Fill Only BHR - West Hill Dr. to Belgatos Rd. Add. Alternates – 8 Groups of Residential Streets SLURRY SEAL PROJECT A N N U A L S T R E E T M A I N T E N A N C E    Sections of Striped Buffered Bike Lanes LGB @ BHR Green Bike Lanes High Visibility Crosswalks LGB - Interim Class II Bike Lane Green Back Bike Symbols BICYCLE/PEDESTRIAN IMPROVEMENTS A N N U A L S T R E E T M A I N T E N A N C E Buffered Bike Lane A N N U A L S T R E E T M A I N T E N A N C E HIGH VISIBILITY CROSSWALKS A N N U A L S T R E E T M A I N T E N A N C E GREEN BACK BIKE SYMBOLS A N N U A L S T R E E T M A I N T E N A N C E RECOMMENDATION Authorize Budget Adjustment of $414,000 from Albright Development Fees Approve Plans and Specs and Authorize Bid Authorize Town Manager to Award B oth Projects up to $2,733,877 (w/ contingency & Add Alts)