Loading...
Staff Report PREPARED BY: MATT MORLEY Director of Parks and Public Works Reviewed by: Town Manager, Town Attorney, and Finance Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 12/06/2016 ITEM NO: 7 DATE: NOVEMBER 22, 2016 TO: MAYOR AND TOWN COUNCIL FROM: LAUREL PREVETTI, TOWN MANAGER SUBJECT: CUT THROUGH TRAFFIC PROJECT 813-0229 A. PROVIDE DIRECTION ON NEXT STEPS TO ADDRESS SUMMER CUT THROUGH TRAFFIC, INCLUDING DIRECTION FOR THE SUMMER OF 2017 AND POTENTIAL FUTURE CAPITAL PROJECTS. B. APPROVE A BUDGET ADJUSTMENT AND THE APPROPRIATION OF $9,908 FROM THE TRAFFIC IMPACT MITIGATION FUND TO THE CUT THROUGH TRAFFIC PROJECT 813-0229. C. AUTHORIZE THE TOWN MANAGER TO EXECUTE AN AGREEMENT WITH W-TRANS FOR ENGINEERING CONSULTING SERVICES IN AN AMOUNT NOT TO EXCEED $66,000. RECOMMENDATION: 1. Provide direction on next steps to address summer cut through traffic , including direction for the summer of 2017 and potential future capital projects. 2. Approve a budget adjustment and the appropriation of $9,908 from the Traffic Impact Mitigation Fund to the Cut Through Traffic Project 813 -0229. 3. Authorize the Town Manager to execute an Agreement with W-Trans for engineering consulting services in an amount not to exceed $66,000. BACKGROUND: On June 7, 2016, the Council approved the temporary closure of South Santa Cruz Avenue a t Wood Road from June 25 through July 10, 2016. On August 2, 2016 the Town Council directed staff to continue the closure through the Labor Day holiday and to continue traffic -related data collection. In addition, staff was directed to begin looking at long term options for mitigating summer cut through traffic. PAGE 2 OF 6 SUBJECT: SUMMER CUT THROUGH TRAFFIC NOVEMBER 22, 2016 S:\COUNCIL REPORTS\2016\12-06-16\07 Pilot Closure Results\07 Staff Report FINAL.docx 12/1/2016 6:48 PM SLL DISCUSSION: Traffic for the duration of the summer proved similar to the early weekends of the closure, with significant relief to the residential neighborhoods south of Highway 9 and a significant decrease in traffic in the downtown business area. Traffic on other local streets demonstrated varied impacts. Streets such as Los Gatos Boulevard, Highway 9, and University and Santa Cruz Avenues continue d to experience very impactful cut through traffic. On the worst of days, traffic impacts spilled over onto smaller residential streets, such as Magneson Loop off of Los Gatos Boulevard or Rose and Andrews Avenues off of Highway 9. These impacts result ed largely from mapping applications, which directed traffic to smaller residential streets to achieve incremental reductions in travel times. This is a phenomenon that many jurisdictions throughout the Bay Area experience in conjunction with commute traffic. Staff anticipates these traffic patterns to continue. Resolving these challenges completely may not be feasible. Some minor relief may be possible through capital improvement projects, such as traffic signal upgrades that move the traffic more efficiently. The pilot closures allowed staff to study and collect data on impacts in relation to the closure. A report from the Town’s consultant, Traffic Patterns, and summarized data are included as Attachments 1 and 2. Staff has ensured that Caltrans has been well informed through this pilot program as they must provide approval for any ongoing closure and Caltrans’ continued support of the Town’s interim activities is necessary1. Some of the observations and hypotheses from the data collected through the summer include the following:  Overall, there was a significant increase in traffic entering Los Gatos on Winchester and Los Gatos Boulevard at Lark Avenue in comparison with 2015 base data.  On southbound Winchester Boulevard at Lark Avenue, a greater number of vehicles followed the signage towards Highway 17, demonstrating that information may be working.  On southbound Los Gatos Boulevard at Lark Avenue, traffic continued the trend of going straight through and not heeding signage directing vehicles back to Highway 17. This materialized in measured and observed queues along Los Gatos Boulevard, especially south of Blossom Hill Road.  Left turn movements on southbound Santa Cruz and University Avenues onto Highway 9 have experienced continued heavy traffic as vehicles use those routes to Highway 17. 1 The Town has an agreement with the Santa Clara County Traffic Authority (the predecessor to the V alley Transportation Authority), that requires the Traffic Authority to provide an agreement with Caltrans to allow for the management of the South Santa Cruz onramp due to traffic conditions. There is no evidence that such an agreement with Caltrans was ever executed. PAGE 3 OF 6 SUBJECT: SUMMER CUT THROUGH TRAFFIC NOVEMBER 22, 2016 S:\COUNCIL REPORTS\2016\12-06-16\07 Pilot Closure Results\07 Staff Report FINAL.docx 12/1/2016 6:48 PM SLL DISCUSSION (cont’d):  Compared with July data, there were some increases in traffic entering the downtown from Highway 9, which may demonstrate increased access to the downtown in August through Labor Day.  Traffic at Main Street and Santa Cruz Avenue showed vehicles headed towards parking areas. Combined with decreased numbers leaving the downtown at Highway 9, these data may point to visitors staying downtown. The closure at Wood Road directly impacted the Caltrans onramp to Highway 17 and as a result, any permanent infrastructure or ongoing closure will require permits from Caltrans. Town staff has met with Caltrans to begin discussions on how to advance a future project. These steps outline that process: 1. The Town needs to develop a concept project to include conceptual plans and a feasibility study for the proposed work, including options for control of the Wood Road intersection. These would be submitted to Caltrans as preliminary documents for a permit. 2. Caltrans provides their reaction or input to the permit submittals. This is the first opportunity for the Town to get documented feedback on whether a project would be permitted by Caltrans. 3. Assuming a positive review, the Town would develop full plans and specifications for the project. Caltrans would continue to review the project and refine its input to the permit request. 4. Once the project scope is fully identified, staff can revise the project cost estimate and identify funding. 5. The project requires environmental review, including a traffic analysis prior to construction. 6. After the completion of environmental review and project approval, construction can begin. The entire timeline for this process is two to three years. In order to assess the first task, staff engaged one of the Town’s on call engineering consultants, W-Trans. On call engineering consultants are selected through a Request for Proposal (RFP) process to provide specialized services on an as needed basis. W-Trans specializes in roundabouts and has extensive local experience working with Caltrans, making them well qualified for this work. W-Trans estimates that the cost of steps one and two above is $66,000. If the Council wishes to pursue this project through steps one and two, funding could be allocated from the remaining Cut Through Traffic Mitigation Capital Improvement Project (Project Number 813-0229) and through a supplement of $9,908 from the Traffic Impact Mitigation Fund. PAGE 4 OF 6 SUBJECT: SUMMER CUT THROUGH TRAFFIC NOVEMBER 22, 2016 S:\COUNCIL REPORTS\2016\12-06-16\07 Pilot Closure Results\07 Staff Report FINAL.docx 12/1/2016 6:48 PM SLL DISCUSSION (cont’d): Previous Town efforts identified a roundabout in proximity to the current location as a gateway project for the Town. That plan, completed in 2003, estimated a project construction cost of $500,000. With Consumer Price Index adjustments, that anticipated cost today would increase to $650,000. Additional costs for project design and project delivery could add $250,000 to the project cost. The overall project scope will significantly influence these costs. The Town will need to identify funding for this project if the Council decides to move forward with it. Funding sources may include Traffic Impact Mitigation funds, Town Capital Improvement Program (CIP) funds, and potential Transportation Initiative funding resulting from the November 2016 Measure B. Given the projected timeline for this project, the Town may wish to consider other measures for implementation during upcoming summers: Street Closure Events. An event similar to the Spring into Green event held last year, may provide one option. This event required expenditures of approximately $10,000. Partnerships with downtown businesses may provide an opportunity to lower these costs. A relocation to a section of Santa Cruz Avenue would help this type of event serve dual purposes. Similar events that provide “open streets” or convert parts of the street to pedestrian zones may also be effective. Staff suggests that closing North Santa Cruz Avenue from Main Street to Elm Street may be a worthwhile trial, pending coordination with local businesses. A trial closure of Santa Cruz Avenue to support an event would identif y any unanticipated impacts, including how traffic reroutes in reaction. Advanced planning would need to occur to avoid increased cut through in residential neighborhoods. If interest lies in this type of solution, staff would appreciate Council input on advancing this type of event alone or in conjunction with a closure at Wood Road. Ongoing Closure at Wood Road The Town may wish to consider ongoing summer closures similar to that from last summer, which will allow for continued data collection and analysis that may be necessary for the project. The temporary closure, data collection, and study costs over last summer totaled approximately $160,000. This option is viable in support of a continued effort to install a permanent roundabout at Wood Road to facilitate ongoing closures, but not as a solution by itself. If the Council would like to continue this option, staff will need advance funding for the period from the Memorial Day weekend through June 30 (11 closure days) and additional funding allocations PAGE 5 OF 6 SUBJECT: SUMMER CUT THROUGH TRAFFIC NOVEMBER 22, 2016 S:\COUNCIL REPORTS\2016\12-06-16\07 Pilot Closure Results\07 Staff Report FINAL.docx 12/1/2016 6:48 PM SLL DISCUSSION (cont’d): for next fiscal year beginning July 1 through Labor Day (21 closure days). Using expenditures from last year, the average daily cost is approximately $9,000, which leads to a total estimated 2017 cost of $288,000 ($99,000 in FY 2016/17). Based on Council input, staff could present the request for these funds as a FY 2016/17 midyear budget adjustment and through the FY 2017/18 Capital Budget program. Capital Projects Town staff previously identified capital projects, including signal modifications, lane changes, and signage to help alleviate traffic beyond the downtown. Staff will provide recommendations for these projects for Council consideration through scheduled Council Priority Setting Study Session in January and through the FY 2017-18 Capital Budget Program. Attachment 1 provides near term and long term options for capital improvements. Council input on the projects could guide staff in preparation for further review. CONCLUSION: The closure of South Santa Cruz Avenue has had a significant impact on traffic in the downtown. On the positive side, traffic flows have been normalized and congestion within the downtown is minimized. The solution continues to create a barrier to the downtown at and approaching Highway 9, making it difficult to enter the downtown area. Additionally, the solution does not provide relief to the areas of Town north of Highway 9. It is requested that the Town Council: 1. Provide direction on next steps to address summer cut through traffic, including direction for the summer of 2017 and potential future capital projects. 2. Approve a budget adjustment and the appropriation of $9,908 from the Traffic Impact Mitigation Fund to the Cut Through Traffic Project 813 -0229. 3. Authorize the Town Manager to execute an Agreement with W-Trans for engineering consulting services in an amount not to exceed $66,000. COORDINATION: This report has been coordinated with the Finance Department and the Town Attorney. PAGE 6 OF 6 SUBJECT: SUMMER CUT THROUGH TRAFFIC NOVEMBER 22, 2016 S:\COUNCIL REPORTS\2016\12-06-16\07 Pilot Closure Results\07 Staff Report FINAL.docx 12/1/2016 6:48 PM SLL FISCAL IMPACT: In addition, through the priority setting in early 2017, the Town Council may identify projects or studies that require additional funding to continue efforts associated with this item. ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and no further action is required. Attachments: 1. Highway 17 On-Ramp Extended Closure Observations 2. Traffic Volume Data Comparison Original Expended/Recommended Total Proposed Budget Encumbered Available Budget Recommended Project Fiscal Impact Funding To Date Balance Adjustment Budget Cost Cut-Through Traffic Mitigation Project 471-813-0229 215,000$ 158,908$ 56,092$ 9,908$ 66,000$ 66,000$ TOTALS 215,000$ 158,908$ 56,092$ 9,908$ 66,000$ 66,000$ TOTAL EXPENDITURES BY CATEGORY: Consultation Services 86,008$ Supplies & Equipment 72,900$ TOTALS 158,908$ CUT-THROUGH TRAFFIC MITIGATION Project 813-0229 Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 November 1, 2016 Matt Morley Town of Los Gatos 41 Miles Avenue Los Gatos, CA 95032 Subject: Downtown Los Gatos – Santa Cruz Avenue Highway 17 On-Ramp Extended Closure Observations Introduction The Town of Los Gatos closed the Santa Cruz Avenue on-ramp to Highway 17 Southbound through the Summer to collect data regarding traffic pattern changes from June 25th to July 17th. At the July 26th Town Council directed for an Extended Closure through the remainder of Summer to the weekend of September 3rd. This Tech Memo documents additional field and traffic data observations and findings through the Extended Closure. Background The Town of Los Gatos initiated an extensive traffic data collection process in the Summer of 2015 aimed at establishing baselines for the development of alternatives to help reduce Highway Cut Through traffic from Highway 17 through the Town. Traffic Patterns participated in the initial 2015 study and developed a series of improvement options, see Exhibit A for List of 2015 Improvement Options. The improvement options ranged from simple roadway marking and signage improvements to changeable message sign improvements both on the highway system and on local streets. Those improvements already completed are highlighted in Exhibit A. This past Summer 2016 the Town closed the Santa Cruz Avenue on-ramp to Highway 17 southbound to allow for additional data collection and comparison to the 2015 baseline conditions. The Summer 2016 closure included an initial Test Closure between during June 25th to July 17th and an Extended Closure from August 6th through September 4th. Findings from the Test Closure were presented to the Los Gatos Town Council on July 26th and included an extensive data comparison between 2015 and 2016. This report focuses on field observations and data comparisons during the Extended Closure period. Data from the Test Closure helped advise the decision to continue with the Extended Closure for additional data comparison. To: Matt Morley Subject: Downtown Los Gatos – Santa Cruz Avenue, Highway 17 On-Ramp Extended Closure Date: November 1, 2016 Page: 2 of 7 Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 Analysis Data Collection Traffic data collection through the Extended Closure period focused on Turning Movement Count data between the hours of 9:00 AM to 3:00 PM for each weekend day. Image sensors were used to store buffered video that were later processed off-site to help count the number of vehicles turning left, proceeding straight, or turning right at each approach of every intersection. Pedestrian and bicycle count data for each count period were also collected. The analysis within this section focuses on vehicle data findings only. The pedestrian and bicycle count data can be used for future data comparison and other projects such as the active Bicycle & Pedestrian Transportation Plan. The following data comparison focuses on how advanced warning signage influenced motorist behavior at key decision areas that impact traffic patterns within the Town such as along Lark Avenue, Blossom Hill Road, Highway 9, and in the Downtown Business Distinct. The data comparison also focuses on the 2-hour period between 11:00 AM and 1:00 PM when traffic volumes on Highway 17 are at their peak. North Los Gatos Advanced warning signage advising motorists about the Santa Cruz Av Downtown Ramp closure was installed north of Lark Avenue on Winchester Boulevard and Los Gatos Boulevard. The signage advised encouraged the use of Lark Avenue to access Highway 17 Southbound. On Winchester Boulevard one of the two southbound through lanes was also closed to visually discourage cut-through traffic from proceeding towards Downtown. 0 200 400 600 800 1000 1200 1400 2015 2016 Trial Closure (Avg)2016 Extended Closure (Avg) 730 1223 1161 Winchester Blvd & Lark Avenue 2-Hour Southbound Through Volumes (11AM - 1PM) +68% +59% To: Matt Morley Subject: Downtown Los Gatos – Santa Cruz Avenue, Highway 17 On-Ramp Extended Closure Date: November 1, 2016 Page: 3 of 7 Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 Vehicle volumes proceeding towards Downtown on Winchester Boulevard from Los Gatos Boulevard was higher in 2016 compared to the 2015 baseline data. The significantly higher volumes tend to indicate an increase in regional traffic volumes but the 2015 baseline data represents only one weekend in mid-June while the Trial and Extended Closure volumes represent July and August volumes over multiple weekends. Through the Extended Closure period volumes showed a continued downward trend possibly indicating that the advanced warning signage messages and public messaging regarding the closure was starting to change motorist behavior. The southbound left turn volumes at Winchester Boulevard & Lark Avenue during the Extended Closure showed an average 60% increase compared to 2015 baseline data. The increase also indicates that the advanced warning signage was having a positive effect and further strengthens the need for better dynamic signage to advice motorists regarding traffic conditions to more quickly direct traffic towards Highway 17 as north as possible in the Town. 0 500 1000 1500 2000 2500 2015 2016 Trial Closure (Avg)2016 Extended Closure (Avg) 1149 2053 1905 Los Gatos Blvd & Lark Avenue 2-Hour Southbound Through Volumes (11AM - 1PM) +79% +66% To: Matt Morley Subject: Downtown Los Gatos – Santa Cruz Avenue, Highway 17 On-Ramp Extended Closure Date: November 1, 2016 Page: 4 of 7 Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 Blossom Hill Road Traffic data collection along Blossom Hill Road through the Extended Closure period focused on field observations, no turning movement data in along Blossom Hill Road intersections was collected. The following bulleted list summarizes observations noted by Traffic Patterns during the Trial Closure and first week of the Extended Closure Period: Blossom Hill Road & Santa Cruz Avenue  Queues from Highway 9 extend to and North of Blossom Hill Road resulting in reduced travel times along the Santa Cruz Avenue Corridor Blossom Hill Road & University Avenue  Westbound left turn queues can extend to the Vasona Park Main Entry  Queues from Highway 9 during the noon hour peak period extended north of Blossom Hill Road  Queues at Blossom Hill & University Avenue resulted in more traffic along Roberts Road, a traffic pattern not noted in 2015, this may be a result of mobile app traffic diversion Blossom Hill Road & Los Gatos Boulevard  Queues on Los Gatos Boulevard from Nino Avenue extended to Blossom Hill Road  Visual increases in southbound right turn increases from Los Gatos Boulevard onto Blossom Hill Road were noted and consistent with queue increases at Blossom Hill Road & University and along Roberts Road Highway 9 Along Highway 9 traffic data collection was focused at the Santa Cruz Avenue, University Avenue, and Los Gatos Boulevard intersections. At Santa Cruz Avenue, an average 58% increase in southbound left turns was noted with increases highest in the later weekends of the Extended Closure. This increase is a positive trend noting that motorists were aware of the on-ramp closure in Downtown and were using Highway 9 as a last effort to get towards Highway 17 Southbound. Continuing straight on Santa Cruz Avenue towards Downtown, traffic volumes were only 6% lower compared to the 2015 baseline data noting only a minor decrease in likely Downtown destination traffic; this can be viewed as a positive measure to Downtown business. At University Avenue, the Highway 9 Eastbound traffic volumes show a 20% increase in the later weekends of the Extended Closure noting the increase in traffic towards the Highway 17 ramps. Although the increases in traffic volumes towards Highway 9 at both Santa Cruz Avenue and University are a positive trend in diverting traffic towards the Highway 9/Highway 17 ramps, the lower volumes note the need for infrastructure improvements to better facilitate traffic movements and reduce queue lengths north of Highway 9. Past project recommendations by Traffic Patterns continue to remain strong considerations including a Double Southbound Left Turn at Santa Cruz Avenue, improved traffic signal coordination along Highway 9, and on-ramp widening improvements at the Highway 9 & Highway 17 Southbound On-Ramp. To: Matt Morley Subject: Downtown Los Gatos – Santa Cruz Avenue, Highway 17 On-Ramp Extended Closure Date: November 1, 2016 Page: 5 of 7 Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 At Highway 9 & Los Gatos Boulevard southbound through volumes towards Downtown were down an average 21% through the Extended Closure while the southbound right turn volumes towards the Highway 9 & Highway 17 ramps showed an increase of 14%. The southbound right turn movement is lower than anticipated but is also consistent with lower volumes trends in the later months; the first weekend of the Extended Closure the percent increase in southbound right turn movements was 27% while in the last weekend of the closure it was only 5% lower. Downtown Los Gatos Business District Data collection and analysis in the Downtown Business District focused on the Main Street & Santa Cruz Avenue and Main Street & University Avenue intersections. Both locations show a significant reduction in traffic from the Los Gatos Boulevard direction, average westbound through volume reduction at University Avenue of 26% consistent with lower volumes from the Highway 9 & Los Gatos Boulevard intersections. Queues along both Santa Cruz Avenue and University Avenue were also noted as significantly reduced or gone all together. The removal of traffic queues gave the Downtown Core are between Main Street and Bean Avenue a more comfortable walking experience. On-street parking in this area was noted as always fully parked during the 2-hour peak period observations with on-street parking demand nearly fully occupied north towards Bachman Avenue. Once Downtown traffic past Highway 9, moving through and parking in the Downtown was noted as significantly easier. Findings & Recommendations The Extended Closure of the Santa Cruz Avenue On-Ramp to Highway 17 Southbound showed a continued trend in use of the Lark Avenue and Highway 9 ramps, a positive trend in reducing cut- through traffic in the Town. The ramp closure remains a labor-intensive process, Traffic Patterns recommends studying alternatives to reconfigure the Santa Cruz Avenue & Wood Road intersection into a traditional round-about configuration to simplify the on-ramp closure process if the Town chooses to pursue more recurring closure alternatives. Infrastructure improvements in conjunction with active traffic signal system upgrades planned around the Town such as dynamic changeable message signs will also help to reduce the on-going operations cost of the ramp closure. Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 EXHIBIT A 2015 Cut-Through Highway Traffic Study Recommendations No. Term Brief Description 1 Near-Term Use Southbound Hwy 85 Changeable Message Sign (CMS) at Pollard Rd to advise motorists to stay on Hwy 85 towards Hwy 17 2 Near-Term Install Freeway Travel Time equipment along both Highway 85 and Highway 17 to City of Santa Cruz to feed into CMS’s 3 Long-Term Install Cantilever CMS on Northbound Highway 85 between Bascom Avenue and Union Avenue exits 4 NOT CONSIDERED IN 2016 FOR COST Obtain Caltrans Encroachment Permit to install Portable CMS’s along freeways 5 COMPLETE Install static freeway guide signs along Winchester Blvd and Los Gatos Blvd at Lark Avenue to guide motorists towards freeway on-ramps at Lark Avenue and Highway 9 6 Immediate Supplement new static freeway guide signs along Winchester Blvd and Los Gatos Blvd with “Highway Pavement Markers” to better delineate freeway on-ramp routes 7 Immediate Initiate study for Lark Avenue improvements from Winchester Blvd to Hwy Southbound Ramps 8 Long-Term Install Blank-Out No Right Turn signs at Highway 9 & Massol Avenue and Highway 9 & Tait Avenue to restrict eastbound right turn movements into the Almond Grove neighborhood. 9 Long Study Study “Relinquishment” of Highway 9 from Caltrans to Town of Los Gatos and implement seasonal LEFT TURN ONLY restrictions for Southbound Santa Cruz Avenue traffic at Highway 9 10 Immediate Manage traffic signal timing along Los Gatos Blvd between Blossom Hill Road and Highway 9 11 COMPLETE Study Signage & Striping at Los Gatos Blvd & Highway 9 to better highlight Highway 17 on-ramps 12 Near-Term Modify traffic signals along Main Street between Santa Cruz Avenue and University Avenue to eliminate conflicting movements that impact roadway efficiency 13 Long-Term Initiate Complete Street Study to identify community-preferred improvements to promote connectivity while simultaneously deterring cut-through traffic Traffic Patterns  PO BOX 25  Danville, CA 94526  info@trafficpatterns.net  (408) 916-8141 EXHIBIT B 2016 Trial Closure Traffic Study Recommendations No. Term Brief Description 1 Near-Term Install Dynamic – Advanced Warning Message signs along Winchester Boulevard and Los Gatos Boulevard north of Lark Avenue 2 Near-Term Coordinate with Caltrans to implement Traffic Signal Timing Improvements along Highway 9 3 Long-Term Widen the Highway 17 Southbound On-Ramp at Highway 9 to help reduce Highway 9 queues 4 Long-Term Study the Winchester Boulevard & Lark Avenue intersection for Round-about Improvements 5 Near-Term Extend two Southbound Los Gatos Boulevard lanes south of Nino Avenue for capacity improvements 6 Near-Term Install Bluetooth Travel Time traffic data collection equipment as part of traffic signal upgrades around the Town to help gather travel time information and reduce data collection costs. 7 Long-Term Work with Caltrans to study a Semi-Permanent closure of the Santa Cruz Avenue – Highway 17 Southbound On-Ramp during weekends all summer long. 8 Near-Term Develop permanent partnership and press release tools to notify mobile app developers such as Google and Apple regarding planned ramp closure in Town. 9 Long-Term Work with Caltrans to study alternative configurations of the Santa Cruz Avenue & Highway 9 intersection to allow for a southbound double left turn configuration during closure periods. 10 Near-Term Work with Caltrans to make Almost Grove Resident Access Presentation permanent during weekends including closure at Massol Avenue and Tait Avenue. 11 Near-Term Develop an Economic Development Plan to increase Downtown business activity during closure periods. Highway 9 Los Gatos Boulevard Traffic Volume Data Comparison 2015 vs 2016 Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -101 179 78 70 -79 -22 --- 11:15 AM -77 158 78 60 -58 -15 --- 11:30 AM -103 172 65 65 -78 -24 --- 11:45 AM -110 138 78 52 -55 -16 --- 12:00 PM -110 168 83 66 -73 -20 --- 12:15 PM -94 166 89 58 -61 -27 --- 12:30 PM -104 166 98 69 -70 -25 --- 12:45 PM -114 148 59 71 -95 -34 --- Totals: -813 1295 628 511 -569 -183 --- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -73 203 90 63 -47 -24 --- 11:15 AM -81 202 77 58 -46 -10 --- 11:30 AM -84 193 94 78 -34 -23 --- 11:45 AM -59 159 92 71 -49 -15 --- 12:00 PM -110 152 85 51 -43 -15 --- 12:15 PM -91 133 106 79 -48 -19 --- 12:30 PM -85 202 111 75 -47 -10 --- 12:45 PM -67 178 98 69 -48 -9 --- Totals: -650 1422 753 544 -362 -125 --- % Change to 2015:--20%10%20%6%--36%--32%--- Saturday, August 08, 2015 2015 Traffic Data Los Gatos Boulevard (South)Los Gatos Boulevard (North) Los Gatos Boulevard (South)Los Gatos Boulevard (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 Highway 9 (East)Highway 9 (West) Highway 9 Los Gatos Boulevard Traffic Volume Data Comparison 2015 vs 2016 Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -88 183 65 56 -46 -23 --- 11:15 AM -79 196 54 42 -39 -12 --- 11:30 AM -47 220 53 54 -53 -26 --- 11:45 AM -78 206 51 49 -49 -18 --- 12:00 PM -90 200 55 57 -58 -10 --- 12:15 PM -80 208 63 44 -40 -18 --- 12:30 PM -67 226 56 59 -51 -13 --- 12:45 PM -90 193 59 62 -44 -12 --- Totals: -619 1632 456 423 -380 -132 --- % Change to 2015:--24%26%-27%-17%--33%--28%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -63 185 57 79 -54 -16 --- 11:15 AM -61 187 76 72 -67 -12 --- 11:30 AM -74 198 62 59 -45 -14 --- 11:45 AM -92 170 57 53 -47 -20 --- 12:00 PM -75 189 83 69 -41 -23 --- 12:15 PM -83 178 94 86 -59 -19 --- 12:30 PM -91 173 74 81 -34 -18 --- 12:45 PM -78 190 76 48 -39 -17 --- Totals: -617 1470 579 547 -386 -139 --- % Change to 2015:--24%14%-8%7%--32%--24%--- 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Los Gatos Boulevard (South)Los Gatos Boulevard (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 Highway 9 (East)Highway 9 (West)Los Gatos Boulevard (South)Los Gatos Boulevard (North) Highway 9 Los Gatos Boulevard Traffic Volume Data Comparison 2015 vs 2016 Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -73 168 84 55 -56 -37 --- 11:15 AM -107 164 70 59 -42 -21 --- 11:30 AM -106 173 55 69 -54 -20 --- 11:45 AM -84 189 88 83 -50 -14 --- 12:00 PM -63 240 69 69 -40 -20 --- 12:15 PM -68 191 59 74 -63 -22 --- 12:30 PM -56 177 79 86 -60 -23 --- 12:45 PM -102 158 99 92 -44 -19 --- Totals: -659 1460 603 587 -409 -176 --- % Change to 2015:--19%13%-4%15%--28%--4%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -64 175 94 73 -54 -18 --- 11:15 AM -78 181 60 63 -64 -15 --- 11:30 AM -103 166 64 58 -66 -29 --- 11:45 AM -63 192 67 55 -67 -15 --- 12:00 PM -92 173 56 65 -83 -24 --- 12:15 PM -87 168 68 57 -51 -24 --- 12:30 PM -94 164 73 92 -61 -32 --- 12:45 PM -100 135 89 77 -59 -30 --- Totals: -681 1354 571 540 -505 -187 --- % Change to 2015:--16%5%-9%6%--11%-2%--- Los Gatos Boulevard (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Los Gatos Boulevard (South)Los Gatos Boulevard (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 Los Gatos Boulevard (South) Highway 9 Los Gatos Boulevard Traffic Volume Data Comparison 2015 vs 2016 Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -98 142 97 66 -69 -32 --- 11:15 AM -94 135 83 69 -65 -28 --- 11:30 AM -91 154 90 59 -52 -24 --- 11:45 AM -103 159 78 81 -73 -24 --- 12:00 PM -86 166 103 85 -43 -21 --- 12:15 PM -74 182 109 75 -63 -24 --- 12:30 PM -96 170 76 55 -61 -50 --- 12:45 PM -79 192 67 68 -68 -22 --- Totals: -721 1300 703 558 -494 -225 --- % Change to 2015:--11%0%12%9%--13%-23%--- Data Observations: Los Gatos Boulevard (South)Los Gatos Boulevard (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 - Consistent lower volumes compared to 2015 Base Line data so less motorists cutting through to Downtown, advance warning signage is working - Southbound right turn volumes higher in first two weeks noting increase in cut through traffic still but consistent drop in through volumes towards downtown Main Street Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 23 46 14 4 43 21 10 10 6 42 20 22 11:15 AM 16 38 9 8 26 43 9 17 11 35 15 22 11:30 AM 24 42 15 8 35 27 6 16 8 45 22 17 11:45 AM 21 38 11 9 34 26 7 12 9 41 17 27 12:00 PM 13 40 16 4 28 16 18 24 7 34 13 29 12:15 PM 19 44 17 3 37 15 13 14 8 35 27 22 12:30 PM 24 41 12 8 35 24 9 13 6 32 13 22 12:45 PM 18 34 9 7 34 25 15 21 7 37 20 30 Totals: 158 323 103 51 272 197 87 127 62 301 147 191 Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 11 25 4 4 56 79 11 5 20 35 16 21 11:15 AM 14 38 11 5 61 91 10 20 31 28 10 20 11:30 AM 13 15 6 8 46 91 24 22 17 40 10 15 11:45 AM 5 15 2 11 69 93 10 9 24 29 11 10 12:00 PM 8 13 3 6 70 89 10 19 25 30 6 12 12:15 PM 7 13 5 7 58 79 3 13 33 26 8 8 12:30 PM 16 14 1 14 36 92 9 21 11 20 13 9 12:45 PM 18 22 5 18 44 112 14 20 15 28 25 16 Totals: 92 155 37 73 440 726 91 129 176 236 99 111 % Change to Pre-Closure:-42%-52%-64%43%62%269%5%2%184%-22%-33%-42% Main Street (East)Main Street (West) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 Main Street (East)Main Street (West) Sunday, June 19, 2016 Pre-Closure Santa Cruz Avenue (South)Santa Cruz Avenue (North) Santa Cruz Avenue (South)Santa Cruz Avenue (North) Main Street Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 31 17 11 4 49 33 10 15 5 14 9 25 11:15 AM 31 10 13 7 50 48 17 8 11 22 7 23 11:30 AM 32 20 15 6 60 35 17 12 6 8 9 28 11:45 AM 30 23 10 4 40 37 11 21 6 13 12 25 12:00 PM 22 15 7 5 37 46 13 21 5 20 14 24 12:15 PM 35 20 9 9 35 47 17 21 9 12 15 26 12:30 PM 28 18 16 2 31 42 14 28 7 18 18 28 12:45 PM 36 17 15 9 35 43 16 24 3 10 11 32 Totals: 245 140 96 46 337 331 115 150 52 117 95 211 % Change to Pre-Closure:55%-57%-7%-10%24%68%32%18%-16%-61%-35%10% Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 40 34 13 7 53 72 10 11 2 25 12 30 11:15 AM 36 40 17 5 54 66 16 12 2 15 13 22 11:30 AM 31 42 6 4 50 69 17 14 6 21 15 29 11:45 AM 32 37 8 2 41 71 12 19 13 24 11 30 12:00 PM 29 28 11 9 39 79 14 10 17 27 23 30 12:15 PM 25 22 8 9 50 80 14 22 33 14 22 21 12:30 PM 28 20 14 10 36 64 19 31 27 22 12 35 12:45 PM 35 29 15 9 39 74 16 28 15 22 13 20 Totals: 256 252 92 55 362 575 118 147 115 170 121 217 % Change to Pre-Closure:62%-22%-11%8%33%192%36%16%85%-44%-18%14% 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Santa Cruz Avenue (South)Santa Cruz Avenue (North)Main Street (East)Main Street (West) 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 Main Street (East)Main Street (West)Santa Cruz Avenue (South)Santa Cruz Avenue (North) Main Street Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 32 28 10 3 32 38 12 10 2 12 8 27 11:15 AM 22 18 14 7 45 45 12 33 4 10 13 35 11:30 AM 32 22 14 10 41 44 11 22 1 9 9 25 11:45 AM 32 17 10 3 35 62 18 13 2 6 19 25 12:00 PM 30 19 9 6 38 45 15 35 9 11 14 26 12:15 PM 34 28 7 10 27 44 13 31 5 11 19 21 12:30 PM 44 16 7 4 44 52 12 18 10 14 21 42 12:45 PM 30 13 9 6 44 36 14 21 2 12 15 14 Totals: 256 161 80 49 306 366 107 183 35 85 118 215 % Change to Pre-Closure:62%-50%-22%-4%13%86%23%44%-44%-72%-20%13% Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 26 22 12 9 34 40 9 14 0 15 5 38 11:15 AM 34 14 8 3 43 38 15 19 3 15 10 24 11:30 AM 32 12 12 9 43 40 16 19 8 15 13 33 11:45 AM 38 18 14 14 43 62 18 24 7 13 13 28 12:00 PM 43 20 13 8 35 33 13 19 4 15 14 33 12:15 PM 34 17 8 6 49 43 13 24 3 11 21 27 12:30 PM 37 18 12 3 44 58 6 16 3 18 23 26 12:45 PM 31 11 22 9 48 43 6 24 8 15 14 32 Totals: 275 132 101 61 339 357 96 159 36 117 113 241 % Change to Pre-Closure:74%-59%-2%20%25%81%10%25%-42%-61%-23%26% Santa Cruz Avenue (North)Main Street (East)Main Street (West) 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Santa Cruz Avenue (South)Santa Cruz Avenue (North)Main Street (East)Main Street (West) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 Santa Cruz Avenue (South) Main Street Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 30 23 15 8 46 48 10 11 3 10 13 25 11:15 AM 21 12 17 4 50 55 19 11 4 10 14 29 11:30 AM 34 22 22 7 41 46 8 12 5 17 13 37 11:45 AM 20 17 18 11 46 45 14 15 4 16 15 27 12:00 PM 30 28 16 1 45 46 20 19 2 9 13 44 12:15 PM 27 13 13 7 43 36 23 24 5 16 16 34 12:30 PM 31 22 26 9 44 65 12 27 5 10 13 22 12:45 PM 29 27 17 11 40 63 15 27 4 15 5 23 Totals: 222 164 144 58 355 404 121 146 32 103 102 241 % Change to Pre-Closure:41%-49%40%14%31%105%39%15%-48%-66%-31%26% Data Observations: Santa Cruz Avenue (South)Santa Cruz Avenue (North)Main Street (East)Main Street (West) 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 - High increases in southbond left turns from Santa Cruz Av to Main St towards University Av due likely to closure. Same with southbound right turns. - Big decrease in westbound left turns from Main St towards closure area also. Highway 9 Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 39 103 49 45 50 16 45 90 33 40 34 25 11:15 AM 51 119 67 38 57 23 35 79 39 25 25 35 11:30 AM 52 116 51 30 54 16 47 91 51 24 37 29 11:45 AM 52 142 42 33 62 24 41 81 40 24 41 37 12:00 PM 44 139 35 26 72 18 49 82 33 38 33 26 12:15 PM 71 137 42 27 68 11 55 93 54 23 47 34 12:30 PM 51 108 35 32 67 13 49 68 21 34 30 31 12:45 PM 47 106 41 33 77 15 38 68 39 22 53 43 Totals: 407 970 362 264 507 136 359 652 310 230 300 260 Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 47 124 26 32 62 35 60 80 23 25 38 35 11:15 AM 48 73 20 34 67 16 57 56 29 33 46 30 11:30 AM 61 76 23 40 56 16 49 52 16 24 32 20 11:45 AM 53 70 22 34 40 13 61 85 14 17 36 30 12:00 PM 34 105 39 28 53 17 52 73 29 27 34 27 12:15 PM 45 81 31 23 42 12 38 51 22 16 14 22 12:30 PM 75 84 15 28 64 16 45 55 12 11 22 30 12:45 PM 52 80 16 32 52 16 48 70 25 13 27 31 Totals: 415 693 192 251 436 141 410 522 170 166 249 225 % Change to Pre-Closure:2%-29%-47%-5%-14%4%14%-20%-45%-28%-17%-13% Sunday, June 19, 2016 Pre-Closure Highway 9 (East)Highway 9 (West) Highway 9 (East)Highway 9 (West)Santa Cruz Av (South)Santa Cruz Av (North) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 Santa Cruz Av (South)Santa Cruz Av (North) Highway 9 Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 44 158 37 30 51 13 81 65 18 24 46 46 11:15 AM 46 131 30 37 47 24 72 59 20 31 36 48 11:30 AM 54 190 32 22 56 22 79 75 27 30 34 52 11:45 AM 51 136 39 27 36 14 79 74 19 20 48 43 12:00 PM 68 133 23 43 75 17 69 52 26 30 33 28 12:15 PM 54 119 36 40 47 14 67 56 20 22 49 34 12:30 PM 46 151 36 21 29 19 66 78 34 21 32 38 12:45 PM 43 155 42 36 59 21 74 62 20 25 43 31 Totals: 406 1173 275 256 400 144 587 521 184 203 321 320 % Change to Pre-Closure:0%21%-24%-3%-21%6%64%-20%-41%-12%7%23% Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 52 155 72 28 56 7 72 85 29 38 40 28 11:15 AM 50 168 78 39 57 18 58 76 23 30 31 35 11:30 AM 65 127 71 30 72 15 68 72 25 30 51 38 11:45 AM 63 141 63 48 54 23 68 93 31 26 44 50 12:00 PM 52 110 38 49 47 16 72 67 16 30 38 40 12:15 PM 61 94 39 23 54 21 63 67 18 19 50 33 12:30 PM 39 127 31 39 51 15 65 80 45 38 47 45 12:45 PM 61 130 66 33 63 11 67 78 29 32 51 34 Totals: 443 1052 458 289 454 126 533 618 216 243 352 303 % Change to Pre-Closure:9%8%27%9%-10%-7%48%-5%-30%6%17%17% 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 Santa Cruz Av (South)Santa Cruz Av (North)Highway 9 (East)Highway 9 (West) 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Highway 9 (East)Highway 9 (West)Santa Cruz Av (South)Santa Cruz Av (North) Highway 9 Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 50 154 46 33 43 17 80 68 24 25 40 38 11:15 AM 51 177 21 30 57 13 77 74 34 41 36 40 11:30 AM 35 111 9 34 47 18 74 86 20 29 44 36 11:45 AM 34 85 13 40 52 17 51 69 30 19 58 32 12:00 PM 48 116 40 43 65 17 68 79 22 23 40 22 12:15 PM 64 150 67 46 58 23 57 75 23 22 35 50 12:30 PM 63 152 49 34 54 7 69 73 20 27 42 37 12:45 PM 43 72 20 33 50 14 59 54 9 27 38 32 Totals: 388 1017 265 293 426 126 535 578 182 213 333 287 % Change to Pre-Closure:-5%5%-27%11%-16%-7%49%-11%-41%-7%11%10% Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 53 119 36 26 41 29 95 75 40 25 41 51 11:15 AM 46 173 47 33 51 14 76 77 28 34 51 43 11:30 AM 55 158 45 42 52 23 73 65 24 26 49 43 11:45 AM 47 178 57 37 52 25 71 85 41 24 52 42 12:00 PM 67 173 60 38 46 26 62 81 40 31 45 51 12:15 PM 65 167 42 36 70 23 74 70 37 31 37 54 12:30 PM 61 141 45 35 64 19 69 79 35 27 41 50 12:45 PM 64 144 40 22 73 22 88 84 52 26 38 36 Totals: 458 1253 372 269 449 181 608 616 297 224 354 370 % Change to Pre-Closure:13%29%3%2%-11%33%69%-6%-4%-3%18%42% Highway 9 (East)Highway 9 (West)Santa Cruz Av (South)Santa Cruz Av (North) Highway 9 (West)Santa Cruz Av (South)Santa Cruz Av (North) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Highway 9 (East) Highway 9 Santa Cruz Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 63 142 36 27 65 18 62 86 34 24 50 40 11:15 AM 64 178 49 40 66 26 69 63 36 29 43 47 11:30 AM 53 166 49 23 55 22 77 96 36 38 41 45 11:45 AM 64 170 36 36 50 23 75 74 30 23 44 38 12:00 PM 54 169 30 33 73 21 70 79 42 39 48 50 12:15 PM 39 128 24 33 55 20 73 89 32 29 49 55 12:30 PM 57 159 44 30 52 17 78 80 26 31 44 50 12:45 PM 42 153 70 31 49 17 88 72 18 33 42 40 Totals: 436 1265 338 253 465 164 592 639 254 246 361 365 % Change to Pre-Closure:7%30%-7%-4%-8%21%65%-2%-18%7%20%40% Data Observations: Saturday, August 20, 2016 Highway 9 (East)Highway 9 (West)Santa Cruz Av (South)Santa Cruz Av (North) 2016 Traffic Data - Extended Weekend Closure 4 - Southbound left turns from Santa Cruz Av to Highway 9 towards Hwy 17 steadily increased compared to Preclosure weekend. - With closure in place the Santa Cruz Av "thru" movement towards Downtown initially decreased and then remained almost consistent to Preclosure weekend data possibly indicating Downtown Business traffic with closure known to motorists. Main Street University Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -65 30 26 31 -16 -28 --- 11:15 AM -56 36 20 45 -32 -24 --- 11:30 AM -58 35 21 44 -26 -29 --- 11:45 AM -57 36 15 45 -34 -34 --- 12:00 PM -58 38 11 36 -25 -15 --- 12:15 PM -72 40 15 39 -32 -25 --- 12:30 PM -55 40 13 39 -16 -14 --- 12:45 PM -69 34 21 51 -25 -20 --- Totals: -490 289 142 330 -206 -189 --- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -55 37 50 48 -28 -21 --- 11:15 AM -48 43 40 74 -35 -22 --- 11:30 AM -52 22 55 65 -30 -27 --- 11:45 AM -50 26 45 57 -35 -20 --- 12:00 PM -33 19 38 74 -35 -18 --- 12:15 PM -26 20 32 64 -47 -25 --- 12:30 PM -31 26 43 71 -37 -18 --- 12:45 PM -57 41 64 75 -44 -15 --- Totals: -352 234 367 528 -291 -166 --- % Change to Pre-Closure:--28%-19%158%60%-41%--12%--- Sunday, June 19, 2016 Pre-Closure Main Street (West)Main Street (East) Main Street (West)Main Street (East)University Avenue (South)University Avenue (North) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 University Avenue (South)University Avenue (North) Main Street University Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -41 36 32 39 -22 -15 --- 11:15 AM -33 36 41 33 -27 -21 --- 11:30 AM -40 28 27 39 -32 -14 --- 11:45 AM -45 29 28 46 -27 -23 --- 12:00 PM -51 36 43 50 -28 -16 --- 12:15 PM -46 24 40 48 -26 -16 --- 12:30 PM -54 37 46 58 -33 -18 --- 12:45 PM -48 39 39 60 -24 -14 --- Totals: -358 265 296 373 -219 -137 --- % Change to Pre-Closure:--27%-8%108%13%-6%--28%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -54 35 66 46 -35 -14 --- 11:15 AM -45 35 48 50 -60 -18 --- 11:30 AM -42 51 59 41 -43 -34 --- 11:45 AM -48 45 60 57 -15 -37 --- 12:00 PM -48 37 61 48 -44 -28 --- 12:15 PM -52 46 55 60 -29 -20 --- 12:30 PM -55 41 57 69 -39 -19 --- 12:45 PM -41 38 67 59 -58 -21 --- Totals: -385 328 473 430 -323 -191 --- % Change to Pre-Closure:--21%13%233%30%-57%-1%--- 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Main Street (West)Main Street (East)University Avenue (South)University Avenue (North) 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 University Avenue (South)University Avenue (North)Main Street (West)Main Street (East) Main Street University Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -37 48 36 45 -37 -21 --- 11:15 AM -34 41 41 56 -36 -18 --- 11:30 AM -46 46 33 53 -34 -20 --- 11:45 AM -45 38 37 56 -31 -10 --- 12:00 PM -36 55 37 68 -34 -21 --- 12:15 PM -45 46 40 56 -39 -18 --- 12:30 PM -46 57 46 60 -24 -23 --- 12:45 PM -42 40 30 46 -33 -10 --- Totals: -331 371 300 440 -268 -141 --- % Change to Pre-Closure:--32%28%111%33%-30%--25%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -43 29 25 50 -31 -17 --- 11:15 AM -45 30 42 45 -29 -18 --- 11:30 AM -47 42 23 48 -39 -19 --- 11:45 AM -45 37 44 62 -38 -12 --- 12:00 PM -49 28 41 48 -28 -19 --- 12:15 PM -50 33 38 48 -26 -13 --- 12:30 PM -53 34 42 56 -37 -27 --- 12:45 PM -48 47 36 57 -36 -19 --- Totals: -380 280 291 414 -264 -144 --- % Change to Pre-Closure:--22%-3%105%25%-28%--24%--- Main Street (East)University Avenue (South)University Avenue (North) 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Main Street (West)Main Street (East)University Avenue (South)University Avenue (North) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 Main Street (West) Main Street University Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM -42 39 23 51 -49 -18 --- 11:15 AM -45 42 37 31 -27 -22 --- 11:30 AM -61 45 33 44 -31 -21 --- 11:45 AM -52 39 36 45 -35 -15 --- 12:00 PM -48 40 39 54 -39 -22 --- 12:15 PM -67 67 31 45 -32 -12 --- 12:30 PM -44 33 44 57 -25 -12 --- 12:45 PM -44 36 42 63 -54 -19 --- Totals: -403 341 285 390 -292 -141 --- % Change to Pre-Closure:--18%18%101%18%-42%--25%--- Data Observations: Main Street (West)Main Street (East)University Avenue (South)University Avenue (North) 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 - The Main Street (West) movement towards Santa Cruz Avenue dropped almost 30% and stayed that way through the first two weekends of the closure - The Main Street (East) left turn movement onto University Avenue towards Highway 9 was significantly higher (more than 2X) on the closure weekends Highway 9 University Avenue Traffic Volume Data Comparison 2015 vs 2016 Closure HW 9 WB HW 9 EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 25 93 10 10 210 16 16 24 60 94 52 14 11:15 AM 27 89 19 13 223 14 11 33 53 109 69 8 11:30 AM 31 81 9 14 228 22 12 22 40 71 65 20 11:45 AM 31 83 16 8 239 24 9 18 41 54 91 9 12:00 PM 16 92 10 12 203 30 16 24 54 73 79 13 12:15 PM 28 91 18 17 227 27 8 35 56 64 74 22 12:30 PM 26 82 8 12 243 25 13 17 50 81 85 13 12:45 PM 31 73 17 12 216 16 12 15 42 68 69 10 Totals: 215 684 107 98 1789 174 97 188 396 614 584 109 HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 22 84 8 8 219 8 20 25 97 93 62 13 11:15 AM 34 66 10 11 169 8 24 35 73 104 33 5 11:30 AM 29 61 8 13 157 6 7 24 74 73 34 4 11:45 AM 24 51 11 4 157 6 14 30 72 92 43 2 12:00 PM 20 57 18 9 201 10 8 21 79 65 60 8 12:15 PM 24 66 8 14 146 5 6 14 66 81 37 1 12:30 PM 34 70 16 10 173 2 13 17 88 72 42 4 12:45 PM 21 60 18 9 160 6 13 33 99 89 44 6 Totals: 208 515 97 78 1382 51 105 199 648 669 355 43 % Change to 2015:-3%-25%-9%-20%-23%-71%8%6%64%9%-39%-61% Saturday, August 08, 2015 2015 Traffic Data University NB University SB 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 University NB University SB Highway 9 University Avenue Traffic Volume Data Comparison 2015 vs 2016 Closure HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 31 58 13 0 282 9 10 22 89 94 51 12 11:15 AM 28 75 10 4 238 12 16 25 77 90 57 6 11:30 AM 23 68 7 9 301 15 13 22 63 89 44 15 11:45 AM 19 48 8 10 251 7 9 31 67 92 64 6 12:00 PM 37 88 12 7 243 12 18 16 79 88 31 8 12:15 PM 27 59 12 7 225 6 9 25 67 88 40 7 12:30 PM 20 36 5 6 227 9 13 20 76 85 69 12 12:45 PM 30 73 10 6 269 9 16 22 86 78 28 8 Totals: 215 505 77 49 2036 79 104 183 604 704 384 74 % Change to 2015:0%-26%-28%-50%14%-55%7%-3%53%15%-34%-32% HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 28 68 4 5 277 18 9 22 92 70 70 14 11:15 AM 33 64 11 8 243 17 19 32 99 83 68 14 11:30 AM 37 69 10 6 228 11 20 29 106 61 81 12 11:45 AM 27 71 21 14 264 26 12 23 90 70 63 11 12:00 PM 29 59 10 7 197 14 10 23 102 83 80 6 12:15 PM 23 49 24 6 212 8 24 27 107 85 49 12 12:30 PM 23 67 15 10 216 12 9 26 87 83 44 7 12:45 PM 18 60 15 5 242 25 9 31 118 66 76 15 Totals: 218 507 110 61 1879 131 112 213 801 601 531 91 % Change to 2015:1%-26%3%-38%5%-25%15%13%102%-2%-9%-17% 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 University NB University SB 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 University NB University SB Highway 9 University Avenue Traffic Volume Data Comparison 2015 vs 2016 Closure HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 26 60 15 8 267 16 17 25 83 94 62 13 11:15 AM 19 62 13 10 268 13 21 27 75 87 55 12 11:30 AM 25 60 7 7 217 12 13 28 86 105 58 6 11:45 AM 28 63 11 8 172 4 7 34 88 88 38 6 12:00 PM 25 63 10 10 222 6 19 20 86 93 54 11 12:15 PM 26 60 8 11 252 20 13 33 104 72 59 12 12:30 PM 18 55 10 9 234 15 15 27 95 86 41 7 12:45 PM 30 46 13 5 185 2 15 26 78 92 33 6 Totals: 197 469 87 68 1817 88 120 220 695 717 400 73 % Change to 2015:-8%-31%-19%-31%2%-49%24%17%76%17%-32%-33% HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 22 46 11 11 274 18 9 19 68 89 59 4 11:15 AM 22 57 15 10 297 15 11 20 55 102 34 7 11:30 AM 41 69 21 8 256 18 22 26 81 70 75 11 11:45 AM 28 76 15 8 276 17 17 27 80 75 58 18 12:00 PM 36 60 14 9 279 18 20 25 88 83 57 11 12:15 PM 33 86 17 10 285 14 14 20 80 88 56 11 12:30 PM 25 79 13 8 254 15 11 30 84 92 63 10 12:45 PM 30 67 17 8 265 13 20 21 73 84 57 12 Totals: 237 540 123 72 2186 128 124 188 609 683 459 84 % Change to 2015:10%-21%15%-27%22%-26%28%0%54%11%-21%-23% 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 University NB University SB 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 University NB University SB Highway 9 University Avenue Traffic Volume Data Comparison 2015 vs 2016 Closure HW 9 WB HW EB Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 39 86 26 9 218 30 12 20 82 67 53 11 11:15 AM 21 93 15 10 266 25 15 20 90 54 39 12 11:30 AM 26 67 12 16 244 25 15 16 73 94 49 11 11:45 AM 34 67 16 9 279 10 13 22 76 91 61 15 12:00 PM 26 80 16 9 287 15 18 24 89 70 60 21 12:15 PM 36 60 8 10 255 6 12 39 84 105 41 5 12:30 PM 23 58 18 6 273 10 15 25 86 97 39 6 12:45 PM 29 50 13 13 263 19 18 26 89 81 77 12 Totals: 234 561 124 82 2085 140 118 192 669 659 419 93 % Change to 2015:9%-18%16%-16%17%-20%22%2%69%7%-28%-15% Data Observations: - Steady increase in southbound left turns from University onto Highway 9 towards Highway 17 - Also steady increase in southbound thru traffic continuing on University Avenue towards Downtown possibly indicating increased downtown traffic given closure is known. 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 University NB University SB Winchester Blvd Lark Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 120 98 --56 49 79 -88 --- 11:15 AM 110 88 --54 38 55 -91 --- 11:30 AM 102 107 --41 39 59 -91 --- 11:45 AM 93 92 --47 34 71 -101 --- 12:00 PM 105 105 --52 53 81 -111 --- 12:15 PM 101 86 --66 53 77 -103 --- 12:30 PM 124 83 --52 36 44 -110 --- 12:45 PM 101 71 --53 32 70 -131 --- Totals: 856 730 --421 334 536 -826 --- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 190 203 --78 75 72 -123 --- 11:15 AM 232 165 --73 115 58 -122 --- 11:30 AM 194 157 --101 109 44 -119 --- 11:45 AM 169 122 --75 127 58 -119 --- 12:00 PM 212 143 --87 80 40 -109 --- 12:15 PM 214 154 --82 75 68 -130 --- 12:30 PM 202 153 --89 77 63 -130 --- 12:45 PM 189 166 --88 82 53 -134 --- Totals: 1602 1263 --673 740 456 -986 --- % Change to Pre-Closure:87%73%--60%122%-15%-19%--- Sunday, June 19, 2016 Pre-Closure Winchester Blvd (South)Winchester Blvd (North) Winchester Blvd (South)Winchester Blvd (North)Lark Avenue (West)Lark Avenue (East) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 Lark Avenue (West)Lark Avenue (East) Winchester Blvd Lark Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 177 172 --55 31 47 -96 --- 11:15 AM 156 126 --59 52 48 -93 --- 11:30 AM 198 147 --62 62 61 -93 --- 11:45 AM 190 186 --74 49 49 -115 --- 12:00 PM 184 174 --58 59 53 -120 --- 12:15 PM 131 120 --80 55 51 -113 --- 12:30 PM 173 108 --81 58 57 -102 --- 12:45 PM 173 150 --61 55 91 -107 --- Totals: 1382 1183 --530 421 457 -839 --- % Change to Pre-Closure:61%62%--26%26%-15%-2%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 153 139 --69 52 65 -121 --- 11:15 AM 133 171 --60 43 74 -112 --- 11:30 AM 170 163 --81 55 67 -121 --- 11:45 AM 198 146 --71 66 67 -122 --- 12:00 PM 162 162 --84 46 70 -115 --- 12:15 PM 212 103 --79 71 61 -116 --- 12:30 PM 167 138 --75 56 64 -123 --- 12:45 PM 198 139 --60 61 65 -101 --- Totals: 1393 1161 --579 450 533 -931 --- % Change to Pre-Closure:63%59%--38%35%-1%-13%--- 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Winchester Blvd (South)Winchester Blvd (North)Lark Avenue (West)Lark Avenue (East) 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 Lark Avenue (West)Lark Avenue (East)Winchester Blvd (South)Winchester Blvd (North) Winchester Blvd Lark Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 175 158 --75 37 76 -130 --- 11:15 AM 167 149 --66 54 69 -135 --- 11:30 AM 148 184 --84 85 73 -124 --- 11:45 AM 173 146 --82 86 56 -98 --- 12:00 PM 192 135 --74 77 53 -123 --- 12:15 PM 157 103 --77 59 58 -130 --- 12:30 PM 189 134 --68 52 87 -128 --- 12:45 PM 185 133 --82 53 60 -111 --- Totals: 1386 1142 --608 503 532 -979 --- % Change to Pre-Closure:62%56%--44%51%-1%-19%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 182 151 --95 56 65 -127 --- 11:15 AM 170 152 --77 46 61 -141 --- 11:30 AM 162 103 --75 56 72 -107 --- 11:45 AM 157 132 --85 51 66 -129 --- 12:00 PM 174 162 --82 48 89 -144 --- 12:15 PM 196 138 --80 42 78 -140 --- 12:30 PM 152 131 --73 52 78 -103 --- 12:45 PM 155 155 --75 52 62 -113 --- Totals: 1348 1124 --642 403 571 -1004 --- % Change to Pre-Closure:57%54%--52%21%7%-22%--- Winchester Blvd (North)Lark Avenue (West)Lark Avenue (East) 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Winchester Blvd (South)Winchester Blvd (North)Lark Avenue (West)Lark Avenue (East) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 Winchester Blvd (South) Winchester Blvd Lark Avenue Traffic Volume Data Comparison Preclosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 166 152 --60 29 63 -115 --- 11:15 AM 152 137 --77 45 55 -111 --- 11:30 AM 153 167 --66 33 93 -106 --- 11:45 AM 170 140 --79 37 61 -128 --- 12:00 PM 149 156 --73 61 61 -123 --- 12:15 PM 205 132 --73 65 56 -135 --- 12:30 PM 165 182 --89 55 61 -114 --- 12:45 PM 177 149 --84 67 58 -132 --- Totals: 1337 1215 --601 392 508 -964 --- % Change to Pre-Closure:56%66%--43%17%-5%-17%--- Data Observations: Winchester Blvd (South)Winchester Blvd (North)Lark Avenue (West)Lark Avenue (East) 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 - Winchester Blvd higher in general compared to 2015 in both direction (north-south). Significantly higher southbound left turn volumes to Lark Av towards Highway 17 indicating positive response to advance warning signage. Lark Avenue Los Gatos Boulevard Traffic Volume Data Comparison PreClosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 5 148 46 119 105 0 54 7 174 --- 11:15 AM 5 134 36 113 106 5 68 5 154 --- 11:30 AM 4 146 43 141 126 3 59 3 160 --- 11:45 AM 3 144 35 153 147 5 67 5 202 --- 12:00 PM 2 107 47 129 148 2 66 5 173 --- 12:15 PM 6 158 49 140 135 2 69 7 170 --- 12:30 PM 6 143 42 149 142 3 63 3 161 --- 12:45 PM 5 169 48 146 119 6 78 2 151 --- Totals: 36 1149 346 1090 1028 26 524 37 1345 --- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 6 294 73 158 132 3 53 5 147 --- 11:15 AM 10 283 79 149 133 6 68 8 210 --- 11:30 AM 6 234 75 157 125 4 81 9 227 --- 11:45 AM 13 290 121 179 152 8 62 6 175 --- 12:00 PM 3 203 70 180 194 6 94 4 142 --- 12:15 PM 9 260 64 194 154 5 86 9 178 --- 12:30 PM 10 249 79 172 189 3 93 8 227 --- 12:45 PM 8 284 65 163 172 4 94 8 223 --- Totals: 65 2097 626 1352 1251 39 631 57 1529 --- % Change to Pre-Closure:81%83%81%24%22%50%20%54%14%--- Lark Avenue (East)Lark Avenue (West) 2016 Traffic Data - Weekend Closure 1 Saturday, June 25, 2016 Lark Avenue (East)Lark Avenue (West) Sunday, June 19, 2016 Pre-Closure Los Gatos Blvd (South)Los Gatos Blvd (North) Los Gatos Blvd (South)Los Gatos Blvd (North) Lark Avenue Los Gatos Boulevard Traffic Volume Data Comparison PreClosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 5 250 82 134 125 5 64 4 130 --- 11:15 AM 5 252 71 136 134 5 72 8 178 --- 11:30 AM 9 259 89 142 131 2 63 5 143 --- 11:45 AM 8 248 72 135 104 1 66 13 138 --- 12:00 PM 3 252 82 149 155 3 60 6 157 --- 12:15 PM 9 229 62 148 128 7 67 4 190 --- 12:30 PM 6 295 77 147 152 3 64 4 147 --- 12:45 PM 6 224 75 158 118 5 57 5 151 --- Totals: 51 2009 610 1149 1047 31 513 49 1234 --- % Change to Pre-Closure:42%75%76%5%2%19%-2%32%-8%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 5 261 78 178 140 4 82 13 169 5 9 1 11:15 AM 6 295 74 150 136 5 63 6 182 5 11 4 11:30 AM 4 264 68 144 158 4 63 5 172 14 7 1 11:45 AM 5 227 80 144 135 3 67 13 212 4 9 5 12:00 PM 6 185 72 164 192 4 79 7 179 17 9 8 12:15 PM 14 206 59 151 162 6 85 7 200 14 12 5 12:30 PM 10 239 80 155 157 5 68 6 194 11 4 6 12:45 PM 8 266 63 118 131 1 82 10 197 18 6 8 Totals: 58 1943 574 1204 1211 32 589 67 1505 --- % Change to Pre-Closure:61%69%66%10%18%23%12%81%12%--- 2016 Traffic Data - Extended Weekend Closure 1 Saturday, August 06, 2016 Los Gatos Blvd (South)Los Gatos Blvd (North)Lark Avenue (East)Driveway (West) 2016 Traffic Data - Weekend Closure 2 Saturday, July 02, 2016 Lark Avenue (East)Lark Avenue (West)Los Gatos Blvd (South)Los Gatos Blvd (North) Lark Avenue Los Gatos Boulevard Traffic Volume Data Comparison PreClosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 10 210 88 162 140 2 70 13 178 10 17 13 11:15 AM 8 273 89 168 152 4 74 2 158 9 5 4 11:30 AM 6 263 100 154 124 4 91 5 161 6 7 7 11:45 AM 8 312 72 145 161 5 55 3 150 10 5 3 12:00 PM 7 254 71 173 172 4 76 8 165 5 12 4 12:15 PM 11 273 121 143 145 3 75 7 143 9 4 8 12:30 PM 9 264 100 168 137 1 73 7 133 8 7 1 12:45 PM 9 227 87 168 161 5 64 9 156 11 7 4 Totals: 68 2076 728 1281 1192 28 578 54 1244 --- % Change to Pre-Closure:89%81%110%18%16%8%10%46%-8%--- Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 10 191 65 183 160 5 61 13 186 14 6 5 11:15 AM 11 222 93 154 125 12 66 7 196 7 8 10 11:30 AM 6 226 98 136 133 7 77 9 177 13 16 8 11:45 AM 9 230 84 186 156 9 81 13 170 10 7 9 12:00 PM 13 217 71 173 165 7 62 7 187 15 13 6 12:15 PM 9 195 69 163 134 9 82 11 180 20 13 8 12:30 PM 7 239 82 139 150 10 63 9 196 12 9 10 12:45 PM 8 237 65 129 142 11 68 15 193 15 3 7 Totals: 73 1757 627 1263 1165 70 560 84 1485 --- % Change to Pre-Closure:103%53%81%16%13%169%7%127%10%--- Los Gatos Blvd (North)Lark Avenue (East)Lark Avenue (West) 2016 Traffic Data - Extended Weekend Closure 2 Saturday, August 13, 2016 Los Gatos Blvd (South)Los Gatos Blvd (North)Lark Avenue (East)Lark Avenue (West) 2016 Traffic Data - Extended Weekend Closure 3 Saturday, August 20, 2016 Los Gatos Blvd (South) Lark Avenue Los Gatos Boulevard Traffic Volume Data Comparison PreClosure vs Closure Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn Left Turn Thru Right Turn 11:00 AM 5 219 71 158 125 0 72 6 177 12 5 5 11:15 AM 7 246 68 157 117 0 87 8 179 9 12 4 11:30 AM 5 248 84 183 134 0 67 2 164 8 4 4 11:45 AM 8 252 71 140 132 2 80 4 180 14 7 8 12:00 PM 7 191 64 164 131 0 84 8 196 8 8 6 12:15 PM 4 215 76 146 125 3 96 11 204 6 8 4 12:30 PM 9 241 71 169 172 5 68 9 209 13 12 6 12:45 PM 9 232 71 160 156 4 72 3 229 3 8 6 Totals: 54 1844 576 1277 1092 14 626 51 1538 --- % Change to Pre-Closure:50%60%66%17%6%-46%19%38%14%--- Data Observations: Los Gatos Blvd (South)Los Gatos Blvd (North)Lark Avenue (East)Lark Avenue (West) 2016 Traffic Data - Extended Weekend Closure 4 Saturday, August 27, 2016 - Significant increase in southbound traffic entering Los Gatos from San Jose compared to 2016