Loading...
Attachment 2KPROPOSED PARKS AND TRAILS PROGRAM D-1 PARK PROJECT DIRECTORY 3406 Blossom Hill Park Restroom Rehabilitation D – 6 4004 Oak Meadow Park Upgrades D – 8 4605 Parks Playground Fibar Project D – 10 4203 Plaza Park Improvements D – 12 3104 Park Rehabilitation – Bachman Park D – 14 4301 Worcester Park Upgrades D – 16 3407 Blossom Hill Park – Little League Backstop D – 18 4608 Tennis Courts Resurfacing – Various Town Parks D – 20 TRAIL PROJECT DIRECTORY 4504 Open Space Trail Upgrades D – 26 4506 Los Gatos Creek Trail Improvements at Charter Oaks D – 28 PROPOSED PARKS AND TRAILS PROGRAM Park Improvement Projects D-2 PROPOSED PARKS AND TRAILS PROGRAM Park Improvement Projects D-3 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES B "C" IS A TOWN-WIDE PROJECT A, G, H, E RD BE L G A T O S D F H PROJECT LOCATIONS A Blossom Hill Park Restroom Rehabilitation B Oak Meadow Park Upgrades C Parks Playground Fibar Project D Plaza Park Improvements E Park Rehabilitation – Bachman Park F Worcester Park Upgrades G Blossom Hill Park Little League Backstop H Tennis Courts Resurfacing – Various Town Parks PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-4 PROGRAM SECTION DIRECTORY PAGE 3406 Blossom Hill Park Restroom Rehabilitation D – 6 4004 Oak Meadow Park Upgrades D – 8 4605 Parks Playground Fibar Project D – 10 4203 Plaza Park Improvements D – 12 3104 Park Rehabilitation – Bachman Park D – 14 4301 Worcester Park Upgrades D – 16 3407 Blossom Hill Park – Little League Backstop D – 18 4608 Tennis Courts Resurfacing – Various Town Parks D – 20 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-5 The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and basketball or tennis court resurfacing; and park equipment or facility upgrades. The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. The exception to this is the Parks Fibar replacement project. Because of many years not completing this work, this program will require an ongoing five years of catchup to bring all playgrounds back up to standard, after which a biennial program should suffice. One-time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available. PARK IMPROVEMENT PROJECTS SUMMARY PARKS Carryforward Projects 3406 Blossom Hill Park Restroom Building Upgrades -$ 40,000$ - $ - $ - $ - $ 40,000$ 4004 Oak Meadow Park Upgrades - - - - - - - 4605 Parks Playground Fibar Project 42,500 32,501 25,000 - 25,000 - 125,000 4203 Plaza Park Improvements 3,663 33,338 - - - - 37,000 3104 Park Rehabilitation - Bachman Park - 325,000 - - - - 325,000 3407 Blossom Hill Park Little League Backstop - 110,000 - - - - 110,000 4301 Worcester Park - - - - - - - New Projects 4608 Tennis Courts Resurfacing - Various Town Parks - 140,000 - - - - 140,000 Total Park Improvement Projects 46,162$ 680,838$ 25,000$ - $ 25,000$ - $ 777,000$ Total Budgeted 2019/20 Budget Expended Through 2015/16 2020/21 Budget 2016/17 Budget & Carryfwd* 2017/18 Budget 2018/19 Budget * Total FY 2015/16 Carryforward $480,838 Unfunded Projects • Civic Center Irrigation System Replacement & Upgrade • Turf Renovations, various parks • Oak Meadow Park Fencing Upgrades • Oak Meadow Park Turf Upgrades • Oak Meadow Park Restroom Expansion • Park Rehabilitation – La Rinconada Park • Park Rehabilitation –Live Oak Manor Park • Park Rehabilitation – Blossom Hill Park PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-6 Project Name Blossom Hill Park Restroom Rehabilitation Project Number 831-3406 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will restore exterior structural elements to the restroom building and dugouts. Location The project is located at Blossom Hill Park, which is at 16300 Blossom Hill Road. Project Background Blossom Hill Park is one of the most heavily used parks in the Town. With its lighted tennis courts and baseball field, the park is well used by local neighbors, as well as sports and community groups. In FY 2013/14, the Town completed restroom partition upgrades and accessibility modifications at Blossom Hill Park, Belgatos Park, Oak Meadow Park, and Balzer Field. During these improvements, some structural weaknesses came to light. The restroom rehabilitation project at Blossom Hill Park will address the deteriorating state of the exterior support columns, replace the failed program storage entrance, replace the dugout roofs, and paint as needed. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project is included in the department’s FY 2016/17 Operating Budget. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-7 Project Components & Estimated Timeline Fall 2016 Design Project development Spring 2017 Bid process Project bidding & contract award Spring 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ 40,000 $ -$ 40,000$ - $ - $ - $ - $ 40,000 $ TOTAL SOURCE OF FUNDS - $ - $ 40,000 $ -$ 40,000$ - $ - $ - $ - $ 40,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 40,000 - 40,000 - - - - 40,000 TOTAL GFAR - $ - $ 40,000 $ -$ 40,000$ - $ - $ - $ - $ 40,000 $ TOTAL USE OF FUNDS - $ - $ 40,000 $ -$ 40,000$ - $ - $ - $ - $ 40,000 $ BLOSSOM HILL PARK RESTROOM REHABILITATION Project 831-3406 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-8 LO S G A T O S B L V D HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Oak Meadow Park BLOSSOM H I L L R D Project Name Oak Meadow Park Upgrades* Project Number 831-4004 Department Parks & Public Works Project Manager Superintendent: Steve Regan *This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. The funds ($330,000) for this project were put on hold pending resolution of funding needs for the Almond Grove Street Reconstruction project. Description This project will repair and replace the irrigation system, install new sod, and install a new section of concrete pathway at Oak Meadow Park. Location The project is located at Oak Meadow Park, which is at 233 Blossom Hill Road. Project Background Oak Meadow Park is the most highly utilized park in Los Gatos. Due to its location, size, and wide range of recreational opportunities, it is enjoyed by many individuals and organized groups. There have been numerous improvement projects at Oak Meadow Park over the past several years in an effort to enhance the park’s aesthetics and improve its usability. The improvements have included construction of an asphalt pathway around the turf area, sidewalk, parking lot repairs, and renovations of picnic areas #1 and #2. Due to the heavy usage, the aging infrastructure of this park needs to be evaluated and improved. Continuing with the improvements, this project will replace an aging turf irrigation system to include the replacement of the existing turf area and add landscape in the parking lot median islands. Other project components could include construction of a nonporous surface for events at the park’s gazebo, updates to the picnic areas, additional landscape related improvements, and a new entrance ticket booth. An overall design for these improvements will take place in Fall 2016. Based on the results of this design and costs associated with them, a phased approach for improvements will be recommended and considered. The budget for this project is a preliminary estimate only. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2016/17 Operating Budget. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-9 Project Components & Estimated Timeline Fall 2016 Design Project design through community outreach process Winter 2016 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipm - - - - - - - - - - Site Acquisition & Prepar - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Exp - - - - - - - - - - TOTAL GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL USE OF FUNDS - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ OAK MEADOW PARK UPGRADES Project 831-4004 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-10 Project Name Parks Playground Fibar Project Project Number 831-4605 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace fibar material at all Town playgrounds. Location This project will be completed at various parks in Los Gatos. Project Background A number of Town parks have playground structures that are heavily used by children and their families. Playground safety codes require that the fibar material be spread under and around playground structures to prevent injury to children. Fibar replacement is required when the material is below a specific depth near the playground structure. Fibar is a wood product that degrades over time based on foot traffic and weather conditions. This material should be replaced on a regular, as needed basis. This is an ongoing CIP project to improve the safety of the Town’s playgrounds. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2016/17 Operating Budget. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-11 Project Components & Estimated Timeline Summer 2016 Design Project development Summer 2016 Bid Process Project bidding & contract award Summer 2016 Construction Project construction Summer 2016 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR 26,413 $ 16,086 $ 32,501 $ -$ 32,501$ 25,000 $ - $ 25,000 $ - $ 125,000 $ TOTAL SOURCE OF FUNDS 26,413 $ 16,086 $ 32,501 $ -$ 32,501$ 25,000 $ - $ 25,000 $ - $ 125,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 26,413 16,086 32,501 - 32,501 25,000 - 25,000 - 125,000 TOTAL GFAR 26,413 $ 16,086 $ 32,501 $ -$ 32,501$ 25,000 $ - $ 25,000 $ - $ 125,000 $ TOTAL USE OF FUNDS 26,413 $ 16,086 $ 32,501 $ -$ 32,501$ 25,000 $ - $ 25,000 $ - $ 125,000 $ PARKS PLAYGROUND FIBAR PROJECT Project 831-4605 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-12 E MAIN ST HWY 1 7 N S A N T A C R U Z UN I V E R S I T Y A V AV Project Name Plaza Park Improvements Project Number 831-4203 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will renovate the turf at Plaza Park. Location The project is located at Town Plaza Park, at the corner of West Main Street and Santa Cruz Avenue. Project Background Plaza Park, located in the heart of downtown Los Gatos, is a popular park and hosts a variety of community events, such as Jazz on the Plazz and the Farmers Market. Because of the amount of high foot traffic at this location, the turf is heavily impacted. This project will remove the existing sod and soil. New soil will be added to the area to enhance root growth and to re-grade the ground to mitigate standing water issues. Additionally, along with the installation of new turf grass, minor changes to the irrigation system will be completed to maximize water coverage. The last time the turf was replaced was approximately seven years ago. This project may be delayed further dependent on drought conditions and restrictions implemented by the State of California. The project will be completed during a period when there is the least impact on scheduled downtown events. Operating Budget Impacts This project will use staff time for the construction inspection and management. The staff time for this project will be included in the department’s FY 2016/17 Operating Budget. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-13 Project Components & Estimated Timeline Fall 2016 Bid process Project bidding & contract award Spring 2017 Construction Project construction Spring 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ 3,663 $ 33,338 $ -$ 33,338$ - $ - $ - $ - $ 37,000 $ TOTAL SOURCE OF FUNDS - $ 3,663 $ 33,338 $ -$ 33,338$ - $ - $ - $ - $ 37,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 3,663 33,338 - 33,338 - - - - 37,000 TOTAL GFAR - $ 3,663 $ 33,338 $ -$ 33,338$ - $ - $ - $ - $ 37,000 $ TOTAL USE OF FUNDS - $ 3,663 $ 33,338 $ -$ 33,338$ - $ - $ - $ - $ 37,000 $ PARK PLAZA IMPROVEMENTS Project 831-4203 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-14 H W Y 9 W M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Park Rehabilitation - Bachman Park Project Number 831-3104 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will make improvements to the park pathway and lighting system. Location The project is located at Bachman Park, bordered by Bachman, Belmont, and Nicholson Avenues. Project Background Bachman Park is a small 3.6-acre neighborhood park close to downtown Los Gatos. The park features a basketball court on the southwest side of the park, playground equipment, as well as a large lawn area for recreational use. Over the last several years, the basketball court was resurfaced, the playground equipment was retrofitted to be in compliance with consumer quality guidelines, and the turf irrigation system was replaced. Other major park infrastructure improvements have not been made to this park in many years due to limited funding. This project will make improvements to the asphalt pathway as well as the park’s pathway lighting. The lighting in this particular park is outdated and will be replaced with more energy efficient lighting fixtures. The improvements will be scheduled in phases to minimize the impact on park users. Operating Budget Impacts This project will use staff time for the construction inspection and management. The staff time for this project is included in the department’s FY 2016/17 Operating Budget. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-15 Project Components & Estimated Timeline Fall 2016 Design Project design through community outreach process Winter 2016 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ 325,000 $ -$ 325,000$ - $ - $ - $ - $ 325,000 $ TOTAL SOURCE OF FUNDS - $ - $ 325,000 $ -$ 325,000$ - $ - $ - $ - $ 325,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 325,000 - 325,000 - - - - 325,000 TOTAL GFAR - $ - $ 325,000 $ -$ 325,000$ - $ - $ - $ - $ 325,000 $ TOTAL USE OF FUNDS - $ - $ 325,000 $ -$ 325,000$ - $ - $ - $ - $ 325,000 $ PARK REHABILITATION - BACHMAN PARK Project 831-3104 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-16 LO S G A T O S B L V D E M A I N S T HW Y 1 7 KENNE D Y R D SHANNO N R D UN I V E R S I T Y A V HWY 9 Project Name Worcester Park* Project Number 831-4301 Department Parks & Public Works Project Manager Superintendent: Steve Regan *This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. The funds ($28,150) for this project were put on hold pending resolution of funding needs for the Almond Grove Street Reconstruction project. Description This project will make various safety and maintenance improvements to Worcester Park. Location This project is located at Worcester Park, which is on Worcester Loop. Project Background Worcester Park has received minimal capital maintenance repairs due to limited funding for park projects. Sections of the existing pathway through the park are in need of repair as they present a hazard and safety concern. Additionally, fences and some park equipment, such as benches and trash receptacles need to be replaced. Operating Budget Impacts There will be no operating budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $3,150 or approximately 11% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-17 Project Components & Estimated Timeline Summer 2016 Design Project design & development Summer 2016 Bid process Project bidding & contract award Fall 2016 Construction Project construction Fall 2016 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL SOURCE OF FUNDS - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL USE OF FUNDS - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ WORCHESTER PARK Project 831-4301 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-18 Project Name Blossom Hill Park – Little League Backstop Project Number 831-3407 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace the outdated backstop at the Blossom Hill Park baseball field. Location This project is located at Blossom Hill Park, 16300 Blossom Hill Road. Project Background The existing backstop at Blossom Hill Park was installed several decades ago, and does not meet the current safety standards for use. This park is used heavily during the spring and summer months by the Los Gatos Little League for baseball practice, games, and tournaments. The Los Gatos Little League has offered to supplement the Town funds to replace the backstop, up to $25,000. The additional funding was approved by the Los Gatos Little League Board in March 2015. Operating Budget Impacts There will be no operating budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $6,000 or 12% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-19 Project Components & Estimated Timeline Summer 2016 Design Project design and development Fall 2016 Bid process Project bidding & contract award Winter 2016 Construction Project construction Winter 2016 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ 25,000 $ 60,000$ 85,000$ - $ - $ - $ - $ 85,000 $ Leattle League Contribution - - 25,000 - 25,000 - - - - 25,000 TOTAL SOURCE OF FUNDS - $ - $ 50,000 $ 60,000$ 110,000$ - $ - $ - $ - $ 110,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 50,000 60,000 110,000 - - - - 110,000 TOTAL GFAR - $ - $ 50,000 $ 60,000$ 110,000$ - $ - $ - $ - $ 110,000 $ TOTAL USE OF FUNDS - $ - $ 50,000 $ 60,000$ 110,000$ - $ - $ - $ - $ 110,000 $ BLOSSOM HILL PARK - LITTLE LEAGUE BACKSTOP Project 831-3407 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-20 Project Name Tennis Courts Resurfacing –.Various Town Parks Project Number 831-4608 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will perform necessary repairs, resurfacing, and application of a color finish and line painting atop of the existing tennis court surfaces. Location This project is located at the tennis courts at both Blossom Hill and La Rinconada Parks. Project Background The seven tennis courts are used on a daily basis by members of the community and are also used as part of the annual programming for adult groups through the Los Gatos – Saratoga Recreation Department. Major failure to the court system will impact the overall use for members of the community along with a number of outside organizations that use the facility for major tennis tournaments. The seven tennis courts have not been resealed since FY 2010-2011 and are in need of repairs to eliminate cracking and chipping of the color coating play surfaces. Surface cracks allow for water intrusion, which causes more damage to the court support structure and play surface. Preventative maintenance is necessary to reduce the need for major reconstruction of the surfaces, and would reduce the downtime of the courts. Operating Budget Impacts There will be no operating budget impact as a result of this project. This project will use staff time for construction inspection and management. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $14,000 or 10% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-21 Project Components & Estimated Timeline Fall 2016 Design Project design & development Fall 2016 Bid Process Project bidding & contract award Winter 2016 Construction Project construction Spring 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ - $ 140,000$ 140,000$ - $ - $ - $ - $ 140,000 $ TOTAL SOURCE OF FUNDS - $ - $ - $ 140,000$ 140,000$ - $ - $ - $ - $ 140,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits Services/Supplies/Equipment - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Site Acquisition & Preparation - - - - - - - - - - Project Construction Expenses - - - 140,000 140,000 - - - - 140,000 TOTAL GFAR - $ - $ - $ 140,000$ 140,000$ - $ - $ - $ - $ 140,000 $ TOTAL USE OF FUNDS - $ - $ - $ 140,000$ 140,000$ - $ - $ - $ - $ 140,000 $ TENNIS COURTS RESURFACING - VARIOUS TOWN PARKS Project 831-4608 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-22 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-23 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES "A" IS A TOWN-WIDE PROJECT B PROJECT LOCATIONS A Open Space Trail Upgrades B Los Gatos Creek Trail Improvements at Charter Oaks PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-24 PROGRAM SECTION DIRECTORY PAGE 4504 Open Space Trail Upgrades D – 26 4506 Los Gatos Creek Trail Improvements at Charter Oaks D – 28 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-25 The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct, repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction or resurfacing. TRAIL IMPROVEMENT PROJECTS SUMMARY Carryforward Projects 4504 Open Space Trail Upgrades -$ 250,000$ - $ - $ - $ - $ 250,000$ 4506 Los Gatos Creek Trail Improvements at Charter Oaks - - - - - - - New Projects -$ -$ - $ - $ - $ - $ - $ Total Trail Improvement Projects -$ 250,000$ - $ - $ - $ - $ 250,000$ 2020/21 Budget 2017/18 Budget 2016/17 Budget & Carryfwd* Total Budgeted 2018/19 Budget Expended Through 2015/16 2019/20 Budget * Total FY 2015/16 Carryforward $250,000 Unfunded Projects • Los Gatos Creek Trail Resurfacing • Los Gatos Creek Trail at Charter Oaks Construction ` PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-26 Project Name Open Space Trail Upgrades Project Number 832-4504 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair and replace old damaged retaining walls, fences, and embankments along the trails in the Town’s open spaces. Location This project is located at Santa Rosa Open Space, Heinz Open Space, and Belgatos Park. Project Background The Town has a number of open space preserves that are under its jurisdiction. There are several public trail networks that traverse the open space preserves in the hillsides. The aging process has deteriorated a number of retaining walls and embankments along some trail sections. Without proper repair and replacement, the possibility of failure of the trails will increase greatly. This project will repair and replace several retaining walls that are supporting the trails and their embankments. In addition, this project will improve the drainage system around the retaining walls to prevent further erosion of the trails. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2016/17 Operating Budget. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-27 Project Components & Estimated Timeline Summer 2016 Design Project design & development Fall 2016 Bid Process Project bidding & contract award Winter 2016 Construction Project construction Spring 2017 Completion Project completion Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR Open Space Reserve Fund - $ - $ 250,000 $ -$ 250,000$ - $ - $ - $ - $ 250,000 $ TOTAL SOURCE OF FUNDS - $ - $ 250,000 $ -$ 250,000$ - $ - $ - $ - $ 250,000 $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 250,000 - 250,000 - - - - 250,000 TOTAL GFAR - $ - $ 250,000 $ -$ 250,000$ - $ - $ - $ - $ 250,000 $ TOTAL USE OF FUNDS - $ - $ 250,000 $ -$ 250,000$ - $ - $ - $ - $ 250,000 $ PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-28 HW Y 1 7 WIN C H E S T E R B L V D LO S G A T O S B L V D HW Y 8 5 LA R K A V KNOWLE S Project Name Los Gatos Creek Trail Park Improvements at Charter Oaks* Project Number 832-4506 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen *This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. The funds ($30,000) for this project were put on hold pending resolution of funding needs for the Almond Grove Street Reconstruction project. Description This project will provide the initial design for raising the trail height on the Los Gatos Creek Trail near Charter Oaks Drive. Location This project is located on the Los Gatos Creek Trail adjacent to Charter Oaks Drive. Project Background The existing trail at this location is lower than grade and floods during rainy seasons, causing safety issues for residents and trail users. When heavy rains hit, this portion of the trail is often closed. The design will allow for the development of a plan to make future construction improvements to this section of the trail. Furthermore, a completed design plan for this stretch of trail will make it a more viable shovel ready project for grant opportunities in the future. Operating Budget Impacts There will be no operating budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $3,500 or approximately 12% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-29 Project Components & Estimated Timeline Spring 2016 Design Project design & development Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project SOURCE OF FUNDS to 2016/17 (with Carryfwd) GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL SOURCE OF FUNDS - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Prior Yrs Actuals 2015/16 Estimated Estimated Carryfwd 2016/17 New Funding 2016/17 Budget 2017/18 Proposed 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed Total Project USE OF FUNDS to 2016/17 (with Carryfwd) GFAR Salaries and Benefits - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ TOTAL USE OF FUNDS - $ - $ - $ -$ -$ - $ - $ - $ - $ - $ LOS GATOS CREEK TRAIL IMPROVEMENT AT CHARTER OAKS Project 832-4506 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-30