Loading...
Attachment 2E COMPLETED CIP PROJECTS FY 2015/16 A-13 L O S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V UN I V E R S I T Y A V WEDGEWOO D POLLARD R D A IS A TOWN-WIDE PROJECT D KNOWLE S B C E A Town Digital Aerial Photography/Topographic Map B Frank Avenue Storm Drain Improvements C Adult Recreation Center Cable & Control System Repairs D Blossom Hill Park Upgrades E Los Gatos Boulevard/Lark Avenue Intersection Improvements COMPLETED CIP PROJECTS FY 2015/16 A-14 A Town Digital Aerial Photograph/Topographic Map Town Digital Aerial Photograph/Topographic Map This project resulted in a new digital aerial photography and topographic map for the Town, which allows Town Departments such as Community Development, Police, and Parks and Public Works to use these more accurate resources. The total project cost was approximately $55,000. C Adult Recreation Center Cable & Control System Repairs Adult Recreation Center Cable & Control System Repairs This project improved the configuration of the cable and control system inside the Adult Recreation Center. These components were old, outdated, and needed to be repaired. These updates were initially completed in 2014-2015, and additional updates to the Center’s audio and video system were made to improve the technology and increase functionality. The total project cost was approximately $17,000. B Frank Avenue Storm Drain Improvements Frank Avenue Storm Drain Improvements This project, located on Frank Avenue, installed a storm inlet at the low point and a storm drain pipe to connect the inlet to the storm drain system, which eliminates flooding during major storm events. The total project cost was approximately $94,000. COMPLETED CIP PROJECTS FY 2015/16 A-15 D Blossom Hill Park Upgrades Blossom Hill Park Upgrades This project was combined with the recently completed Blossom Hill Park Pathways project which was able to provide irrigation to previously un-irrigated areas while the old pathways were removed. The total project cost was approximately $10,000. COMPLETED CIP PROJECTS FY 2015/16 A-16