Attachment 2E COMPLETED CIP PROJECTS
FY 2015/16
A-13
L
O
S
G
A
T
O
S
-
S
A
R
A
T
O
G
A
R
D
LO
S
G
A
T
O
S
B
L
V
D
E M
A
I
N
S
T
HW
Y
1
7
HW
Y
1
7
N S
A
N
T
A
C
R
U
Z
A
V
WIN
C
H
E
S
T
E
R
B
L
V
D
BLOSSOM HILL RD
LO
S
G
A
T
O
S
B
L
V
D
HW
Y
8
5
KENNE
D
Y
R
D
SHA
N
N
O
N
R
D
LA
R
K
A
V
UN
I
V
E
R
S
I
T
Y
A
V
WEDGEWOO
D
POLLARD R
D
A IS A TOWN-WIDE PROJECT
D
KNOWLE
S
B
C
E
A Town Digital Aerial Photography/Topographic Map
B Frank Avenue Storm Drain Improvements
C Adult Recreation Center Cable & Control System
Repairs
D Blossom Hill Park Upgrades
E Los Gatos Boulevard/Lark Avenue Intersection
Improvements
COMPLETED CIP PROJECTS
FY 2015/16
A-14
A Town Digital Aerial Photograph/Topographic Map
Town Digital Aerial Photograph/Topographic Map
This project resulted in a new digital aerial photography and
topographic map for the Town, which allows Town
Departments such as Community Development, Police, and
Parks and Public Works to use these more accurate
resources.
The total project cost was approximately $55,000.
C Adult Recreation Center Cable & Control System Repairs
Adult Recreation Center Cable & Control System
Repairs
This project improved the configuration of the cable and
control system inside the Adult Recreation Center. These
components were old, outdated, and needed to be repaired.
These updates were initially completed in 2014-2015, and
additional updates to the Center’s audio and video system
were made to improve the technology and increase
functionality.
The total project cost was approximately $17,000.
B Frank Avenue Storm Drain Improvements
Frank Avenue Storm Drain Improvements
This project, located on Frank Avenue, installed a storm
inlet at the low point and a storm drain pipe to connect the
inlet to the storm drain system, which eliminates flooding
during major storm events.
The total project cost was approximately $94,000.
COMPLETED CIP PROJECTS
FY 2015/16
A-15
D Blossom Hill Park Upgrades
Blossom Hill Park Upgrades
This project was combined with the recently completed
Blossom Hill Park Pathways project which was able to
provide irrigation to previously un-irrigated areas while the
old pathways were removed.
The total project cost was approximately $10,000.
COMPLETED CIP PROJECTS
FY 2015/16
A-16