Loading...
1992-139-Continuing Fees, Rates And Charges For Community Services, General Administration Services Library, Parks, Forestry And Maintenance, Planning, Police And Amending Certain Fees For Building And Engineering Services Encroachment PermitRESOLUTION 1992 -139 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS CONTINUING FEES, RATES AND CHARGES FOR COMMUNITY SERVICES, GENERAL ADMINISTRATION SERVICES LIBRARY, PARKS, FORESTRY AND MAINTENANCE, PLANNING, POLICE AND AMENDING CERTAIN FEES FOR BUILDING AND ENGINEERING SERVICES ENCROACHMENT PERMIT RESOLVED, that the imposed fees for Building, Community Services, Engineering, General Administration Services, Library, Parks, Forestry and Maintenance, Planning and Police Departments be continued. RESOLVED, that the revised fees charged by Building and Engineering Services for encroachment permits will be effective 60 days from date of adoption of this resolution. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 20th day of July 1992, by the following vote: COUNCIL MEMBERS: AYES: Randy Attaway, Joanne Benjamin, Steven Blanton, Eric D. Carlson, and Brent N. Ventura NAYS: None ABSENT: None ABSTAIN: None i SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK OF THE TOWN OF LOS aTOS LOS GATOS, CALIFORNIA l28 \resos \e n crch. pmt ENGINEERING DEPARTMENT FEES 1. ENGINEERING PLAN CHECK AND INSPECTION FEES (Based on the estimated cost of street, drainage, and other public improvements) A. PLAN CHECK FEE 1) First $30,000 of value or any fraction thereof .. ............................... 4 %+ 2) Next $50,000 of value or any fraction thereof . ............................... 3 %+ 3) That value exceeding $80,000 2 %+ ............ ............................... 4) For each additional plan check after three 2% -not to exceed at the discretion of the Town Engineer $1,000 per additional with appeal to the Town Manager plan check 5) Developer's option of using an .... ............................... Consultant cost outside plan check consultant plus 10% for as designated by the Town Town administrative for projects over $30,000 services B. INSPECTION FEE 1) First $30,000 of value or any fraction thereof . ............................... 10 %+ 2) Next $50,000 of value or any fraction thereof . ......... 5 %+ ...................... 3) That value exceeding $80,000 . . . . .. . . . . 4% ... ............................... 2. SUBDIVISION MAP CHECKING A. 1 -4 Lots .............................. ............................... $1,100 B. 5 or more Lots $1,100 + 220 /Lot over 4 C. 4 units with air space condos .............. ............................... $3,300 D. 5 or more Lots with air space condos $3,300 + 220 /Unit over 4 3. REVERSION TO ACREAGE .................. ............................... $550 4. LOT MERGER A. Certificate ............................. ............................... $450 B. Map checking .......................... ............................... $550 5. LOT LINE ADJUSTMENTS A. Certificate ............................. ............................... $450 MGR035 A: \FEES \ENGRI.FEE -1- B. Map checking .......................... ............................... $750 6. CERTIFICATE OF COMPLIANCE ............. ............................... $450 7. STORM DRAINAGE FEES A. DEVELOPMENT PROJECTS 1) Single family lots - hillside area ....... ............................... $2,000 /ac. 2) Single family lots - not hillside area ..... ............................... $2,400 /ac. 3) Multiple family dwelling units ......... ............................... $2,400 /ac. plus $90 for ea. unit in excess of two not to exceed $3,000 /ac. 4) Commercial, industrial, hospitals, churches, ............................. $3,000 /ac. schools and others B. BUILDING PERMITS (Buildings, Structures or Improvements) 1) New impervious area .............. ............................... $.33 /sq. ft. 8. CONSTRUCTION ENCROACHMENT PERMIT FEE A. Per cent of the cost of construction ........... ............................... 3% B. Minimum ............................ ............................... $981,06 9. OVERWEIGHT VEHICLE PERMIT (House Moving) FEE A. Per House, plus ......................... ............................... $130 B. Deposit for Facilities Damage .............. ............................... $1,000 10. REVOCABLE ENCROACHMENT PERMIT A. Application Fee ..... ............................... I ................... $600 B. Processing Fee ......................... ............................... $400 11. ABANDON EXCESS PUBLIC RIGHT -OF -WAY A. Application Fee ........................ ............................... $650+ B. Processing Fee ...................... ............................... $1,100+ C. Appraisal Costs and Fair Market Value 12. ABANDON EXCESS EASEMENT A. Application Fee ......................... ............................... $650 MGR035 A: \FEES \ENGRI.FEE -2- 13. ASSESSMENT DISTRICT RE-SPREAD . . . .... ........... ...... Consultant Cost + 10% Administration Fee 14. ASSESSMENT DISTRICT FORMATION . .............. Charged to Assessment District 15. STREET TREE .................... ................. .. ...... .... $165/Tree MGR035 A:\FEES\ENGR1.FEE -3-