Study Session Attachment 3Plan Bay Area and VTP 2040Project List
Source
Description
General
Bike Lane Improvements- various throughout Town.
Plan
Guided by Bicycle and Pedestrian Master Plan,
General
Blossom Hill Road - Blossom Hill Park to Union Avenue:
Plan
Widening only to provide for left turn storage lanes, bicycles and pedestrians and safety improvements.
Blossom Hill Road Bridge Widening at Highway 17:
General
Reconstruct and widen bridge over Highway 17 to provide sidewalks and bike lanes on both sides, and evaluate the need for additional street
Plan
lighting and traffic lanes based on safety considerations for pedestrians and bicyclists.
Blossom Hill Road - North Side - Union Avenue to Westhill Drive:
General
Widening only as additional land becomes available through right-of-way dedications associated with development approvals, or as additional
Plan
funding sources become available to the Town for the purpose of acquiring additional land for right-of-way and infrastructure improvements.
General
Blossom Hill Road -South Side - Union Avenue to Regent Drive:
Plan
Widen to conform with the roadway width east of Regent Drive.
General
Hwy 17
Plan
Bus Service Improvements
General
Hwy 9- SR 17 to Los Gatos Boulevard
Plan
Complete Street Improvements
General
Hwy9
Plan
Construct Los Gatos Creek Trail Connector
General
Hwy 9 at N. Santa Cruz
Plan
Construct Gateway entrance to downtown
General
Knowles Ave - Knowles from Pollard to Winchester
Plan
Complete Street Improvements
Lark Ave - Highway 17 to Los Gatos Boulevard:
General
Widen the road to four to six lanes with a median and bike lanes, and provide two westbound right -tum storage lanes for the metered
Plan
northbound Highway 17 on-ramp.
General
Lark Ave - Winchester Boulevard to Highway 17:
Plan
Widen the road to four to six lanes with a median and bike lanes.
General
LGB - Camino del Sol to Blossom Hill Road:
Plan
Provide bike lanes.
General
Los Gatos —Saratoga Road (Highway 9) and North Santa Cruz Avenue
Plan
Intersection Improvements
General
Los Gatos Almaden Road lmprovmenents-
Plan
Sidewalk, bike lane, complete streets
General
Los Gatos Blvd - Lark Ave. to Samaritan Or
Plan
Widen Roadway
General
Los Gatos Boulevard and Lark Avenue:
Plan
Intersection Improvements
General
Los Gatos Boulevard and Samaritan Drive:
Plan
Intersection Improvements
General
Pollard Road - Knowles Drive from Pollard Avenue to Winchester Boulevard:
Plan
Widen the road to four lanes plus bike lanes.
General
Pollard Road - San Tomas Aquino Creek to Burrows Road/San Tomas Aquino Road:
Plan
Widen the road to four lanes plus a median and bike lanes.
General
Pollard Road - West Parr Avenue to Knowles Drive:
Plan
Widen the road to four lanes with no parking, plus bike lanes.
General
Plan
Town Traffic Signal System Upgrade
General
Union Ave- Blossom Hill Road to Los Gatos— Almaden Road:
Plan
Widen the road to four lanes plus sidewalks, parking, and bike lanes.
General
Vasona
Plan
Light Rail Station
General
Wedgewood Ave.
Plan
Traffic and Ped Safety - Phase II
General
Winchester- Blossom Hill to Lark
Plan
Complete Street Improvements
Other
Traffix Busing Model
Other
Pedestrian Bridge from Creek Trail to Sports Park or other similar Creek Trail Connection - added by Counci
Other
Transportation Study to identify long term solutions for West Valley - added by Cound
Attachment 3
..ON
Plan Bay Area and VTP 2040 Project List
I.., (Projects Affecting Los Gatos and Added by Other Agencies)
Source
Description
Other
SR 17/SR 9 Interchange Improvements
Other
SR 17 Widening (Lark Ave to South of SR 9)
Other
SR 85 Noise Abatement Pilot Projects
Other
SR 85 Noise Abatement Project (from SR 87 to 1-280)
Other
SR 85/ Winchester Blvd Interchange Study
Other
I Santa Cruz Toll Corridor Tunneled Highway with Light Rail
VTA
I Extend Light Rail Transit from Winchester Station to Route 85 (Vasona Junction)
SC County
I Los Gatos Creek Trail: Lark Ave to Blossom Hill
7