Loading...
1998-163-Authorizing The Execution Of An Agreement For The Construction Of Project #9930RESOLUTION 1998 -163 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH FOR THE CONSTRUCTION OF PROJECT #9930 PLAZA PARK LIGHTING WHEREAS, bids were sought in conformance with State and Town law, and Giacalone Electrical Services, Inc. is the lowest bidder for Project #9930 - Plaza Park Lighting. THEREFORE, BE IT RESOLVED: by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that the Town Manager is authorized to enter into an agreement with Giacalone Electrical Services, Inc. in the amount of $52,092.00 for the construction of Project #9930 - Plaza Park Lighting, (attached) as Exhibit A. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 5th day of October, 1998, by the following vote. COUNCIL MEMBERS: AYES: Randy Attaway, Joanne Benjamin, Steven Blanton, Jan Hutchins, Mayor Linda Lubeck NAYS: None ABSENT: None ABSTAIN: None �. SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA nOFRT� c���� t , F�2 f,& 1 01 Section 7 ORD RJrc AGREEMENT �/�V r 's t._ • THIS IS AN AGREEMENT between the Town of Los Gatos (hereinafter referred to as "Owner") and (hereinafter referred to as "Contractor"). Owner and Contractor, for the consideration hereinafter named, agree as follows: Contractor shall furnish all materials and perform all of the work for the construction of PROJECT #9930 - PLAZA PARK LIGHTING in accordance with the Contract Documents. As full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay dollars ($ ` A,N,QW ),which shall supersede any other amount specified in the contract documents. All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The Contract Documents are defined in section 8 -01(a) of these Specifications and are incorporated herein by reference the same as though set out in full. Following the execution of this agreement and the approval of bonds and insurance policies and certificates, Owner shall issue a notice to proceed with the work. Commencing work or the entrance of equipment or materials on the site of the work by Contractor before receipt of the notice to proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. 5 - TIME OF COMPLETION The work called for herein shall be fully completed within the time limit set forth in the Special Conditions. Revised: September 21, 1998 (ATY) SECTION 7 - AGREEMENT 2 Contractor shall remedy any defects due to faulty materials and/or workmanship and pay for any t S o other work and/or existing facilities resulting therefrom which shall appear within a period of from the date of recording of the Notice of Completion. The undersigned has reviewed and is thoroughly familiar with the appropriate sections of the Contract and Section 8 -06(c) of these Specifications pertaining to liquidated damages. IN-WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day of i ®, I vs APPROVED AS TO F RM: \�'- V-�> ORR P.KORB Town Attorney ATTEST: MARIAN COSGROVE Town Clerk, Town of Los Gatos Revised: September 21, 1998 (ATY) TOWN OF LOS GATOS M- Town Manager CONTRACTOR By \�Sld tL C tAcp'(tw Title Business Address Z O Contractor's License Number