Loading...
AddendumDATE: OCTOBER 16, 2015 MEETING DATE: 10/20/15 ITEM NO: 9 ADDENDUM TO: MAYOR AND TOWN COUNCIL FROM: LAUREL PREVETTI, TOWN MANAGER 1)b � ` SUBJECT: PPW Job No. 13 -31 — Almond Grove Street Rehabilitation %Prot"ect Staff recommends that the Town Council proceed with the Almond Grove Project by: A. Complying with ADA with respect to sidewalks B. Phasing the project with Broadway and Bachman first C. Approving Plans and specifications and bidding Broadway and Bachman for asphalt and concrete reconstruction with the curb line in the existing location and no additional allocation of design fees D. Issuing a request for proposals for designing the remaining eight project streets (Continued from 9115115) REMARKS: After the initial staff report was distributed on October 15, 2015, staff received a request from Council for the Adopted FY 2015/16 - 2019/20 Capital Improvement Program (CIP) Budget. The Adopted FY 2015/16 — 2019/20 CIP Budget is in the final stages of production, being professionally printed and bound for distribution. Therefore, in response to this request, staff has printed copies of the Adopted CIP Budget which is incorporated as Attachment 5 for Council review. At the June 16, 2015 Town Council meeting, the Council gave direction to minimize discretionary capital projects pending resolution of funding needs for the Almond Grove Street Repair and Resurfacing project. Per Council direction, a hold was placed on new projects proposed in the 2015/16 Capital Budget and projects with significant funding additions in the 2015/16 budget, with some specific exceptions. Exceptions include projects that provide for preservation of Town infrastructure, enhanced life safety, or the creation of ongoing financial savings. To reflect Council's direction within the Adopted CIP Budget, specific language has been added to each project page indicating that funding for this project is being held pending resolution of funding needs for the Almond Grove Street Reconstruction project. An example of this can be found on pages C -6 and PREPARED BY: MATT MORLEY 74�4-- Director of Parks and Public Works A nl Reviewed by: 4 /Assistant Town Manager Attorney PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: ALMOND GROVE STREET REHABILITATION PROJECT OCTOBER 16, 2015 REMARKS (cont'd): C -7 of Attachment 1. This language is repeated for each project that is currently on hold. A summary list of projects on hold is provided below, including a page reference to the Adopted CIP Budget. 2015 -2016 Capital Projects on Hold Pending Almond Grove Funding Project on Hold Budget Adopted CIP Budget Page Reference Street Repair — 2014-15 (half of project) $900,000 C -6/C -7 Downtown Parking Sign Enhancements $50,000 C- 42/C -43 Parking Lot #4 $400,000 C- 60/C -61 Montebello Way Island Removal $19,550 C- 72/C -73 Oak Meadow Park $330,000 D- 10/D -11 Worcester Park Improvements $28,150 D- 18/D -19 Blossom Hill Park Little League Backstop* $25,000 D- 20/D -21 Los Gatos Creek Trail Improvements at Charter Oaks $30,000 D- 28/D -2 9 lBuilding Replacement at Corp Yard* $200,000 E- 12/13, 13 Civic Center I rovements $150,000 E- 22/E -23 Total $2,132,700 *General Fund Appropriated Reserve (GFAR) portion only Attachments 1 -4 (Previously received with Staff Report on October 15, 2015): 1. Q &A 2. Project Cost Breakdown 3. Funding Plan 4. Public Comments received through 1:00 p.m. Thursday, October 15, 2015 Attachments received with this Addendum: 5. Adopted FY 2015/16 — 2019/20 Capital Improvement Program Budget 6. Public Comment received from 1:01 p.m. Thursday, October 15, 2015 through 11:00 a.m. Friday October 16, 2015.