APPROVE THE PROJECT LIST FOR SUBMISSION TO THE
METROPOLITAN TRANSPORTATION COMMISSION AND THE VALLEY
TRANSPORTATION AUTHORITY FOR THE PLAN BAY AREA AND
VALLEY TRANSPORTATION PLAN 2040 PROGRAMS
RECOMMENDATION:
Staff recommends that the Town Council approve a project list for submission to the
Metropolitan Transportation Commission (MTC) and the Valley Transportation Authority
(VTA) for the Plan Bay Area and Valley Transportation Plan 2040 programs.
BACKGROUND:
The Metropolitan Transportation Commission leads the program called Plan Bay Area and
describes the program as follows:
Plan Bay Area 2040 is a roadmap to help Bay Area cities and counties plan
for transportation needs and preserve the character of our diverse
communities while adapting to the challenges of future population growth.
Plan Bay Area 2040 is a state - mandated, integrated long -range
transportation, land -use and housing plan that will support a growing
economy, provide more housing and transportation choices and reduce
transportation- related pollution in the nine - county San Francisco Bay Area. It
builds on earlier efforts to develop an efficient transportation network and
grow in a financially and environmentally responsible way. It is a work in
progress that will be updated every four years to reflect new priorities.
Projects /programs seeking future regional, state or federal funding through
the planning horizon for Plan Bay Area 2040 must be submitted for
consideration in the adopted Plan.
PREPARED BY:
Reviewed by:
MATT MORLEY ��r,�
Director of Parks and Public Works --
Town Manager
Attorney
PAGE 2
MAYOR AND TOWN COUNCIL
SUBJECT: PLAN BAY AREA PROJECT LIST
JUNE 8, 2015
BACKGROUND (cont'd):
The Town works with its local Congestion Management Agency (CMA) which is the VTA. The
VTA recently issued a call for projects for consideration in its Valley Transportation Plan 2040
(also referred to as Envision Silicon Valley). This is an opportunity to update projects already in
the plan or to add additional projects intended for completion within the plan horizon.
The previous VTP 2040 is available at the following link and contains two projects specific to
Los Gatos:
http:/ /www.vta.oirojects- and_uroarams planning/ valley- transUOrtation -plan- 2040-vtu -2040
Los Gatos Creek Trail Connector to State Route 9: Construct two trail connections from
Highway 9 to Los Gatos Creek Trail. The first link will start at the sidewalk near the Wraight
Avenue/Highway 9 intersection and run parallel to the Highway 9 overpass in the easterly
direction. A bicycle /pedestrian bridge will be constructed to reach the Los Gatos Creek Trail.
The second link will start at the Highway 9 /Highway 17 South merger and arc northwards to the
Los Gatos Creek Trail. The total estimated length of extension is 450 ft.
Los Gatos Boulevard Widening: Widen Los Gatos Blvd. from Camino Del Sol to Samaritan
Drive to relieve traffic congestion in the area.
DISCUSSION
The VTA call for projects deadline is July 10, 2015. The Town Manager has sent a letter to the
VTA requesting an extension to that date, reflecting the amount of work involved in compiling a
list of projects and the supporting documentation. VTA requirements for projects include that
the projects:
• Result from a planning study and public review process.
• Be sufficiently defined to have project descriptions and reasonable cost estimates.
• Be sponsored by a jurisdiction or public agency (such as a city, the County, Caltrans or
Caltrain).
• Reflect the design guidelines and policies developed by VTA and MTC. These include
VTA's Community Design and Transportation (CDT) Manual of Best Practices for
Integrating Transportation and Land Use, Pedestrian Technical Guidelines and Bicycle
Technical Guidelines, and MTC's Routine Accommodations Policy.
Each project submitted must include:
• Project description (e.g., project limits, alignment, number of lanes, etc.).
• Estimated capital cost.
• Estimated operating and maintenance cost.
• Identified or prospective fund sources (Local, State or Federal).
• Project timeline, including start and completion or plaiming and /or construction phases.
PAGE
MAYOR AND TOWN COUNCIL
SUBJECT: PLAN BAY AREA PROJECT LIST
JUNE 8, 2015
DISCUSSION (cont'd):
To meet these requirements, the Town could draw on the list of transportation projects identified
through the General Plan. These projects are provided as Attachment 1 for Council review. Use
of the General Plan identified projects meets the first requirement that projects result from a
planning study and public review process. This is a very high level concept list and many of the
projects listed in the General Plan have limited defined scope. For the purpose of this list, the
limited scope should be sufficient. Ultimately a more refined scope will be required. The VTP
2040 updates occur every four years when new projects can be added and unwanted projects
dropped. This provides the Town with future opportunities to adjust the list as priorities change.
The projects have been grouped as those less than S2M, those between $2M and $I OM, and
those over $10M to provide a sense of magnitude. Upon approval of the list by the Council, staff
will prepare estimates for those projects for submittal by the deadline. Staff has also noted that
several projects within the General Plan are not recommended for submission by the Town at
this time, although other agencies may submit them.
As noted above, inclusion of projects within the plan is essential to obtaining outside funding for
these efforts. Examples of these funding sources include grants, future state and federal monies
and potential allocations from an anticipated 2016 sales tax ballot initiative. This does not
guarantee funding but rather creates eligibility, which is the first step towards applying for that
funding. Additional Town funding will likely be required for substantial portions of the
identified projects. Some of that funding has already been identified in the allocation of Traffic
Impact Fees as approved by Council last year (Attachment 2). Other funding could come from
other impact fees or the Town's Capital Budget.
CONCLUSION:
Staff recommends that the Town Council approve a project list for submission to the
Metropolitan Transportation Commission (MTC) and the Valley Transportation Authority
(VTA) for the Plan Bay Area and Valley Transportation Plan 2040 programs.
ALTERNATIVES
The following alternatives are provided for Council consideration:
Alternative 1: The Council could modify the list of projects by adding or removing projects and
directing staff to submit the modified list.
Alternative 2: The Council could choose to not submit a list of projects. Staff does not
recommend this option, as the Town may risk the ability to participate in regional funding
opportunities for the identified projects.
PAGE 4
MAYOR AND TOWN COUNCIL
SUBJECT: PLAN BAY AREA PROJECT LIST
JUNE 8, 2015
FISCAL IMPACT:
There is no fiscal impact from proposing these projects.
ENVIRONMENTAL ASSESSMENT:
This is not a project as defined under CEQA and no further action is required.
Attachments:
1. Proposed Project List
2. Traffic Impact Fees Project List
�-3
n
x
z
y
r
Plan Bay Area and VTP 2040 Draft Project List
Source
Description
Size
Recommend?
General
Bike Lane Improvements- various throughout Town.
Plan
Guided by Bicycle and Pedestrian Master Plan.
<$2M
Yes
General
Blossom Hill Road - Blossom Hill Park to Union Avenue:
Plan
Widening only to provide for left turn storage lanes, bicycles and pedestrians and safety improvements.
<$2M
Yes
General
Blossom Hill Road Bridge Widening at Highway 17:
Plan
Reconstruct and widen bridge over Highway 17 to provide sidewalks and bike lanes on both sides, and evaluate the need for additional street
lighting and traffic lanes based on safety considerations for pedestrians and bicyclists.
$2M to $10M
Yes
General
Plan
Blossom Hill Road - North Side - Union Avenue to Westhill Drive:
Widening only as additional land becomes available through right -of -way dedications associated with development approvals, or as additional
funding sources become available to the Town for the purpose of acquiring additional land for right -of -way and infrastructure improvements.
< $2M
Yes
General
Blossom Hill Road -South Side- Union Avenue to Regent Drive:
Plan
Widen to conform with the roadway width east of Regent Drive.
<$2M
Yes
General
Hwy 17
Plan
Bus Service Improvements
<$2M
Yes
General
Hwy 85
Plan
Hot Lanes from US 101 to Mt View
>$10M
No
General
Hwy 85 Northbound
Plan
Aux. Lanes from North of Winchester Blvd to Saratoga Ave
>$10M
No
General
Hwy 85 Southbound
Plan
Aux. Lanes from North of Winchester Blvd to Saratoga Ave
>$10M
No
General
Hwy 9 -SR 17 to Los Gatos Boulevard
Plan
Complete Street Improvements
<$2M
Yes
General
Hwy9
Plan
Construct Los Gatos Creek Trail Connector
< $2M
Yes
General
Hwy 9 at N. Santa Cruz
Plan
Construct Gateway entrance to downtown
$2M to $IOM
Yes
General
Knowles Ave - Knowles from Pollard to Winchester
Plan
Complete Street Improvements
$2M to $10M
Yes
General
Lark Ave - Highway 17 to Los Gatos Boulevard:
Plan
Widen the road to four to six lanes with a median and bike lanes, and provide two westbound right -turn storage lanes for the metered northbound
Highway 17 on -ramp.
$2M to $IOM
Yes
General
Lark Ave- Winchester Boulevard to Highway 17:
Plan
Widen the road to four to six lanes with a median and bike lanes.
<$2M
Yes
General
LGB - Camino del Sol to Blossom Hill Road:
Plan
Provide bike lanes.
<$2M
Yes
General
LGB - Gateway:
Plan
Locate a gateway feature at Samaritan Drive.
<$2M
Yes
General
LGB - Van Meter School Driveway to Spencer Avenue:
Plan
Construct landscaped median.
<$2M
Yes
General
LGB - Shannon Road to Nino Avenue:
Plan
Construct landscaped medians.
<$2M I
Yes
Page 1 of 2
6/10/2015
Source
Description
Size
Recommend?
General
Los Gatos — Saratoga Road (Highway 9) and North Santa Cruz Avenue:
Plan
Intersection Improvements
<$2M
Yes
General
Los Gatos Almaden Road Improvmenents -
Plan
Sidewalk, bike lane, complete streets
$2M to $IOM
Yes
General
Los Gatos Blvd - Lark Ave. to Samaritan Or
Plan
Widen Roadway
$2M to $IOM
Yes
General
Los Gatos Boulevard and Lark Avenue:
Plan
Intersection Improvements
<$2M
Yes
General
Los Gatos Boulevard and Samaritan Drive:
Plan
Intersection Improvements
<$2M
Yes
General
Pollard Road - Knowles Drive from Pollard Avenue to Winchester Boulevard:
Plan
Widen the road to four lanes plus bike lanes.
<$2M
Yes
General
Pollard Road - San Tomas Aquino Creek to Burrows Road /San Tomas Aquino Road:
Plan
Widen the road to four lanes plus a median and bike lanes.
<$2M
Yes
General
Pollard Road - West Parr Avenue to Knowles Drive:
Plan
Widen the road to four lanes with no parking, plus bike lanes.
<$2M
Yes
General
Town Traffic Signal System Upgrade
Plan
<$2M
Yes
General
Union Ave - Blossom Hill Road to Los Gatos — Almaden Road:
Plan
Widen the road to four lanes plus sidewalks, parking, and bike lanes.
<$2M
Yes
General
Vasona
Plan
Light Rail Station
>$10M
Yes
General
Wedgewood Ave.
Plan
Traffic and Ped Safety - Phase 11
< $2M
Yes
General
Winchester- Blossom Hill to Lark
Plan
Complete Street Improvements
<$2M
Yes
General
Wood Road
Plan
Gateway on Santa Cruz Ave
< $2M
Yes
Other
Traffix Busing Model
$2M to $IOM
Yes
Page 2 of 2 6/10/2015
Los Gatos, California
Traffic Impact Mitigation Fee Update
Methodology Report
A
M
GP/VTP 2035 Lus Gatos Blwi Wi7cniog- 5amarrtan Dr to Cnmioo Del Sol - Road widening,
new 4rc -aav and bike la ne, 2 0X). 1
s 1,2A,w)1
07
50w%
I.00,OOO
>0 _Wk
f
O
:q,61%
0
6 1,O.SQ(A10
GP
GP
950.000
9011 1L
GP
Lark/Los Gatati Intersection 6npmven5ems -Add Third Left Turn Lanes for
Eo,lb Lund tmd Northbomtl A caches
S 1,2WAN)
>0 _Wk
$ 1.08QI7tYJ
GP
Campk-te $tree) Lulxorrcmem5 -Lark from Cixrden.Hill to Los Gates Blvd
S 2,]WAX)
5000%
6 1,O.SQ(A10
GP
GP
Co *15 Sweet Im rovervems- SR 9 Gum linneridv io Los Gatos Blvd
Complete Sircelhnprovements- Bktsc�om Hll Road from Old Blossom Hill
Road to Reeent Drive
S 950,IX70
S '— tV)jXX)
SYtW+
SoAN'l
$ 325,fM7o
$ 15W.ow
GP
GP
GP
conk kte Street Im lrovemenp' - Krwwlec from Poltnrd to Winchester
Cons lets Street Hn �nven rts - Winchcs'ter 6rnn Bbssom Hill m I_iuk
Bbssom Hill Road wilenine over Hihway 17.
s A(xq.(1(11
S t s(xfpp
s 1IXE11MA
50 00%
So.IX7R:
%0 fry,
5 I,fNXI,(MID
5 TU,t)(Xl
e
VIP = Lrnlfer Tranaportao(,n Plm:, 2075 by Santn Cl,,, Volley Dansp,wafi Aurhwirn-
7bwa CIP = Pbwn of Los G.0,.. Caprral 111TIOre+++en! Progre. and Pending cnnsme;t&nv project list.
S,,,11, c: Tmvn o,f b s Gnwx.
9
ATTACHMENT2
This Page
Intentionally
Left Blank