Loading...
Attachment 73DRAFT Backbone Infrastructure Improvements by Phase (conceptual and subject to change) 04.30.2015 Note: It is assumed that the Southern Plan Area Phase will proceed ahead of the Northern Plan Area Phase ATTACEWNT 7 3 SOUTHERN PLAN AREA PHASE NORTHERN PLAN AREA PHASE (Includes Lark District and southern portion of (Includes northern portion of Transition District Improvement Transition District) and Northern District) Backbone • 'A' St. (Lark Ave. to Neighborhood St.) • 'A' St. & Burton Rd. (Phase Limit to Los Gatos Roadways • 'A' St. (Neighborhood St. to Phase Limit) Blvd.) ( Onsite) • Neighborhood St. (Los Gatos Blvd. to 'A' St.) • Noddin Ave (Los Gatos Blvd. to 'A' St.) • 'C2' St. (Neighborhood St. to Phase Limit) • 'C2' St. (Phase Limit to Burton Rd.) Backbone • Lark Ave. frontage improvements • Los Gatos Blvd. frontage improvements Roadways • Los Gatos Blvd. frontage improvements • EIR Mitigation: (Offsite) • EIR Mitigation: 1. Improvements and signalization to the 1. 10' ROW Dedication along south side of Burton /Samaritan /LGB intersection, property frontage along Lark Ave. including: 2. Addition of third turn lane from NB LGB • Conversion of the existing ES lane on to EB Lark Ave. Burton Rd. to a through /left turn and 3. Addition of dedicated right turn lane • Addition of a dedicated EB left turn towards NB 17 onramp lane and one EB right turn lane on 4. Addition of second onramp lane to NB 17 Burton Road and related improvements (crosswalk, 2. Related left and right turn lanes from Los signal improvements) Gatos Boulevard into project 5. Multi -Use Path on property frontage on Lark Ave. and bicycle lane on south side of Lark Ave. 6. Left turn lane from WB Lark Ave. into 'A' St. entrance 7. Related left and right turn lanes from Los Gatos Blvd. into project Traffic Signals • Los Gatos Blvd. /Neighborhood Street • Los Gatos Blvd. /Burton Rd. (modify existing) Stormwater • Pipes within roadways • Pipes within roadways (onsite) • Pipe from 'A' St. to hydromod. vault • Pipe from 'A' St. to hydromod. vault • Pipe from hydromod. vault to existing onsite • Pipe from hydromod. vault to existing onsite stub pipe at SR 17 stub pipe at SR 17 • Stormwater Quality improvements for • Stormwater Quality improvements for roadways roadways • Hydromodification vault • Hydromodification vault Stormwater • Pipe connection to Los Gatos Blvd. • Pipe connection to Los Gatos Blvd. (O fill • pipe connection from Oka Rd. to stub at existing outfall • Remove plug in outfall headwall and install flap gate Water • Pipes within roadways • Pipes within roadways ( Onsite) Relocation of SJWC 24" transmission pipe (onsite portion) • Fire /Domestic pressure regulator Water • Pipe extension to SJWC "7 -Mile" Station • Pipe connection in Los Gatos Blvd. (Offsite) • Pipe connection in Los Gatos Blvd. • Relocation of SJWC 24" transmission pipe (offsite portion) Wastewater • Pipes within roadways • Pipes within roadways ( Onsite) • Pipe from 'A' St. to onsite stub at SR 17 • Pipe from 'A' St. to onsite stub at SR 17 Wastewater • Pipe connection at Oka Rd. (Offsite) • Downstream improvements (if required per final flow study determination) Dry Utilities • Electric, gas, phone and cable within PUE's Electric, gas, phone and cable within PUE's along along roadways roadways Soundwall • Wall along SR 17 frontage I Wall along SR 17 frontage Note: It is assumed that the Southern Plan Area Phase will proceed ahead of the Northern Plan Area Phase ATTACEWNT 7 3