Loading...
Attachment 6 - ChronologyCHRONOLOGY OF EVENTS 130 Massol Avenue • February 2008: Request to relocate existing contributing Almond Grove residence and add a second story was reviewed by HPC as other business. • July 2008: Applicant submitted Minor Residential Development Application. • July 2008: Application requires Architecture and Site application to exceed the maximum floor area; upgraded to an A &S application. • July 2008: HPC recommended approval of relocation and second story addition with conditions. • May 2009: DRC approved relocation and second story with conditions. • August 2009: Applied for building permit. • May 2010: Issued building permit. • July 2010: Town staff alerted to possible demolition; building inspector went out to the site. • July 2010: Issued Stop Work Notice because possible demolition; later determined to be demolition. • July 2010: Applicant submitted required A &S application to the Town for the unlawful demolition of a contributing historic residence. • August 2010: Entered into agreement to pay fines in installments. ATTACHMENT 6