Loading...
PPW Job No. 13-30 Town Park Lighting Project 411-831-4607tiawx gas s�� s COUNCIL AGENDA REPORT DATE: AUGUST 4, 2014 MEETING DATE: 8/19/14 ITEM NO: r] TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER SUBJECT: PPW JOB NO. 13 -30 —TOWN PARK LIGHTING PROJECT 411 - 831 -4607 A. AMEND THE EXISTING AGREEMENT AND AUTHORIZE A BUDGET TRANSFER IN THE AMOUNT OF $5,000 FROM THE RETAINING WALL REPAIRS PROJECT 411- 815 -9930 TO THE TOWN PARK LIGHTING PROJECT 411 - 831 -4607. B. AUTHORIZE THE TOWN MANAGER TO EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION ACCEPTING THE WORK OF HUA TONG ENGINEERING GROUP, INC. AND AUTHORIZE RECORDING BY THE CLERK ADMINISTRATOR. RECOMMENDATION: 1. Amend the existing contract agreement and authorize a budget transfer in the amount of $5,000 from the Retaining Wall Repairs Project 411- 815 -9930 to the Town Park Lighting Project 411 - 831 -4607. 2. Authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Hua Tong Engineering Group, Inc. and authorize recording by the Clerk Administrator. BACKGROUND: The Town's adopted five year Capital Improvement Program (CIP) Budget designates funding for infrastructure repair and replacement projects in the Town's Parks. The Town Park Lighting project is consistent with the Town's goals to improve public safety and to improve the quality of Town parks. The existing lighting systems at Blossom Hill Park, Howe's Play Lot, and Live Oak Manor Park were replaced as part of this project. PREPARED BY: IvfATT p LEY� Director of Parks and Public Works Reviewed by: Town Manager Attorney Finance \ \1wna\data\PPW\COUNCIL \COUNCIL REPORTS\2014 Reports \081914 \13 -30 Town Park Lighting Pmjmt.dmx PAGE AUGUST 4, 2014 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 13 -30 — TOWN PARK LIGHTING PROJECT 411- 831 -4607 DISCUSSION On January 9, 2014, the Town Council awarded the contract to Hua Tong Engineering Group, Inc., in the amount of $159,758. Additional project funds are needed due to an unanticipated increase in contract quantities for underground electrical conduit and wiring at Live Oak Manor and Blossom Hill Parks. The original design was to install underground conduits parallel to the existing pathways to limit damage to the turf areas. Prior to the start of construction, the contractor was required to locate existing underground utilities. Conflicts with the turf irrigation system were discovered after the start of the project. Location of irrigation main lines was inconsistent with construction drawings, necessitating the contractor to relocate conduit and to modify spacing between light poles. Staff concluded that the associated cost to relocate the underground electrical was less expensive than modifications to the irrigation systems in both locations. The contractor has satisfactorily completed the project and PPW recommends acceptance. Five percent of the faithful performance bond will remain in effect for a period of two years as guarantee for any needed repair and/or replacement caused by defective materials and workmanship. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town's acceptance of the project. CONCLUSION: Staff recommends that the Town Council amend the existing agreement and authorize a budget transfer in the amount of $5,000 from the Retaining Wall Repairs Project 411- 815 -9930 to the Town Park Lighting Project 411 - 831 -4607. In addition, staff recommends that the Town Council authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Hua tong Engineering Group, Inc. and authorize recording by the Clerk Administrator. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. FISCAL IMPACT: If the proposed budget transfer is approved, there will be funds to accept this project as demonstrated in the table on the following page. PAGE AUGUST 4, 2014 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 13 -30 —TOWN PARK LIGHTING PROJECT 411- 831 -4607 FISCAL IMPACT (cont'd): Available Expended/ Proposed Budget Encumbered Budget V14 Fiscal Lnpact Fundine To Date Transfer Consultation Services 1,000 TOTALS $ 505,987 THIS PAGE INTENTIONALLY LEFT BLANK