PPW Job No 13-03 Project 831-3403tow x of DATE: TO: rmi"u MEETING DATE: 06/02/14 ITEM NO: I COUNCIL AGENDA REPORT MAY 21, 2014 MAYOR AND TOWN COUNCIL GREG LARSON, TOWN MANAGER SUBJECT: PPW JOB NO. 13 -03 — BLOSSOM HILL PARK PATHWAY IMPROVEMENT PROJECT 831 -3403 A. AUTHORIZE THE TOWN MANAGER TO EXECUTE A CONSTRUCTION CONTRACT WITH S. MILLER PAVING IN AN AMOUNT NOT TO EXCEED $257,174. B. AUTHORIZE STAFF TO EXECUTE FUTURE CHANGE ORDERS TO THE CONSTRUCTION CONTRACT AS NECESSARY IN AN AMOUNT NOT TO EXCEED $30,000. C. AUTHORIZE AN EXPENDITURE BUDGET ADJUSTMENT REDUCING THE TREE TRIMMING PROJECT 411- 831 -4603 AND INCREASING THE BUDGET IN THE BLOSSOM HILL PARK PATHWAY IMPROVEMENT PROJECT 831 -3403 IN THE AMOUNT OF $49,671. RECOMMENDATION: 1. Authorize the Town Manager to execute a construction contract with S. Miller Paving in an amount not to exceed $257,174. 2. Authorize staff to execute future change orders to the construction contract as necessary in an amount not to exceed $30,000. 3. Authorize an expenditure budget adjustment reducing the Tree Trimming Project 411 -831- 4603 and increasing the budget in the Blossom Hill Park Pathway Improvement Project 831- 3403 in the amount of $49,671. BACKGROUND: The Town's adopted FY 2013/14 - 2017/18 Capital Improvement Program (CIP) Budget designates funding for infrastructure construction projects. This is consistent with the Town's goals to improve public safety and improve the quality of Town parks, streets, and facilities. PREPARED BY: MATT MORLEY Director of Parks and Public Works Reviewed by: Assistant Town Manager own Attorney inance PAGE 2 MAY 21, 2014 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 13 -03 — BLOSSOM HILL PARK PATHWAY IMPROVEMENT PROJECT 831 -3403 BACKGROUND (cont'd This project will install new catch basins around the playground area to reduce the risk of flooding along the pathway, and expand the existing asphalt pathway from 4' to 8' wide starting at Shannon Road parking lot, including the playground area, tennis courts, baseball diamond and the pathway directly connecting to the park's restroom and concession facility. The proposed improvements will provide access for people with physical disabilities and provide a class I pedestrian and bicycle connection between Blossom Hill and Shannon Roads. Additionally, the project will include repairing and widening sections of the pathway from Hillbrook Drive to the restroom and concession facility. DISCUSSION: On April 21, 2014, the Town Council approved plans and specifications for this project and authorized staff to advertise the project for bids. On May 21, 2014, four (4) bids were received for this project (Attachment 1). Staff reviewed the bids received and has determined that S. Miller Paving is a responsible entity and that its bid is responsive to the Town's formal bid process. The bid package included a bid alternate for additional work. Staff structured this bid alternate to allow for flexibility in scope and budget. Because the pricing received on this project is competitive, staff has included the bid alternate in the award. Funding for this portion of the work will be transferred from a previous project for tree trimming. The tree trimming pricing was also very competitive, allowing for savings while still completing the planned scope. CONCLUSION: Staff recommends that the Town Council authorize the Town Manager to execute a construction contract in an amount not to exceed $257,174. Additionally, due to the variables associated with this particular type of construction and to address unforeseen circumstances during the course of construction, staff further recommends that the Town Council authorize staff to execute future change orders to the construction contract as necessary, in an amount not to exceed $30,000 for work beyond that which is identified in the base bid. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption has been filed. FISCAL IMPACT: If the proposed budget adjustment is approved, there will be funds for this project as demonstrated in the table on the following page. PAGE MAY 21, 2014 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 13 -03 — BLOSSOM HILL PARK PATHWAY IMPROVEMENT PROJECT 831 -3403 FISCAL IMPACT (confd): BIM S OM M L PARK PATH WAY M PRO V F1MM PROJECT 831-3403 _ Available_ Expended/ Proposed Pro jwsed Budget Encumbered Budget Contract Aoat Ole FY2013/14 Fiscal Impact - Funding To Date Adjustment Amount $ce 411 -831 -3403 $ 89,000 $ 817 $ 49,671 $ 137,854 421 - 831 -3403 167,370 18,050 - 149,320 411- 8314603 100,000 (49671) - 5%329 TOTALS $ 356,370 S 18,867 $ - S287,174 $ 50,329 TOTAL WflY CATROMM _ Construction $ 257,174 Contingency 30 000 TOTALS $ 287,174 Attachment: 1. Bid Summary THIS PAGE INTENTIONALLY LEFT BLANK M U U v i+ w e o � � C w « eti u w d C O 'y Q W N X d � O a r A � A A M"C2M Q VJ ^1 Q �RF h ti O � O � d H T�i H Cq U d S W a u (i R yO 0 a�0 � Do 3 A R� N G O ti A N r N T S 0 O O .p v d N o .S c � m o 'O y u W M V W � 3 0 A A� w o a ATTACHMENT - Iona °°n `°• NN(c; rI C Q U m � NO�NOOADO y� Y mN ON�� rtNO OODHN�N O C1 X10 N" N LL U to > E ayic000O00000 00 000 °0, °o, op oo op°0000p O000 O 7 �'. H 00 fV N fM l0 mp I� f00 N op IA N O 6 O 6 C i �.N N o 0 0 0 0 0 0 0 N N O O m 0 0 0 0 m u N 1� 0) (00 H 01 W N t00 N N M O 0 O O N M Ego F«.1 C>�Q�ONNa �omoln �c �noefo° 01()N OOi aeu�an Ir �� V nCDOMO)NN�fpr vU oa O N o O C E' 4 m t00 t00 n O V m COD O O O m O N O O (NO ^ CV tM fG In r N O b L6 O O O 06 6 O^ O cl �O) NNE rCCD NtO r O)m �� -mN�CO t O W mm m �& N N N m C Ems+ O I� O unJ th 0 M Opp O N V O N N m C m O M 0 •MiR N N m L6 as ooSo o N iW a'; 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 N 0 Yl 0 O 0 O 0 O 0 O 0 O 0 b 0 0 O O O h n Vj O O N O h otV RI NIA 19 m NNfA w y J m J LL m LL J LL J LL N LL m LL J m J Q W W Q W LL J LL J (A LL N J LL LL J J LL LL J J LL (n m W Q �� W N�'CND 0 OD •- �NNmCO yy0 N�-NO W �[OQ _ N O 0 L � U m j OC O O O 3 S 0 0 °o d 8 C E = ay y m m 2 0 a v Q N g emu E T io °a K .$ fqU Q° y 0 o- t o cIUU > m m E c E c E 2 m E E a -6 Om sc°¢u &o& Q° K �aaE¢�cim z �Nm V N47 nC0mOrNm010mnmO)Or N d S W a u (i R yO 0 a�0 � Do 3 A R� N G O ti A N r N T S 0 O O .p v d N o .S c � m o 'O y u W M V W � 3 0 A A� w o a ATTACHMENT THIS PAGE INTENTIONALLY LEFT BLANK