Attachment 14D
1. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
CONSTRUCTION MEANS. METHODS, TECHNIQUES, SEQUENCES AND
PROCEDURE AND FOR ALL SAFETY PROGRAMS AND PRECAUTIONS IN
CONNECTION WITH THE PROJECT. NEITHER THE OWNER NOR THE
ARCHITECT IS RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO
FOLLOW PROPER SAFETY PROCEDURES.
2. ALL CODES HAVING JURISDICTION ARE HEREBY MADE A PART OF
THIS DOCUMENT AND ARE TO BE STRICTLY OBSERVED BY THE
CONTRACTOR IN THE CONSTRUCTION OF THE PROTECT. IN THE
EVENT OF CONFLICT BETWEEN THESE DOCUMENT AND THE CODE,
THE CODE SHALL PREVAIL. ANY CONFLICT OR DISCREPANCY SHALL
IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
3, ALL WORK, TO BE ACCEPTABLE, MUST BE IN COMPLIANCE WITH
THESE DRAWINGS AND SPECIFICATIONS, AND MUST BE OF DUALITY
EQUAL OR BETTER THAN THE STANDARD OF THE TRADE. FINISHED
WORK SWILL BE FIRM, WELL-ANCHORED, IN TRUE ALIGNMENT,
PLUMB, LEVEL, WITH SMOOTH. CLEAN, UNIFORM APPEARANCE.
4. CONTRACTOR SHALLATALL TIMES PROVIDE PROTECTION
AGAINST WEATHER, RAIN, NANDSTORMS, OR HEAT SOAS TO
MAINTAIN ALL WORK MATERIALS, EQUIPMENT AND APPARATUS FREE
FROM INJURY OR DAMAGE.
5. CONTRACTOR SHALL VISIT THE SITE OF THE PROJECT, EXAMINE
FOR HIMSELFHERSELF THE NATURE OF THE EXISTING CONDITIONS
AND ALL OTHER CONDITIONS RELEVANT TO THE SATISFACTORY
COMPLETION OF THE PROJECT. SUBMISSION OF A BID FOR
CONSTRUCTION SHALL BE CONSIDERED EVIDENCE OF SUCH
EXAMINATION BY THE CONTRACTOR.
6. BEFORE ORDERING MATERIAL OR COMMENCING WORK WHICH IS
DEPENDENT FDA THE PROPER SIZE AND INSTALLATION UPON
COORDINATION WITH CONDITIONS IN THE BUILDING, THE
CONTRACTOR SMALL VERIFY ALL DIMENSIONS AND SHALL BE
RESPONSIBLE FOR THE CORRECTNESS. ANY DISCREPANCIES
BETWEEN THE DOCUMENTS AND THE EXISTING CONDITIONS SHALL
BE REFERRED TO THE ARCHITECT FOR ADJUSTMENTS BEFORE ANY
NARK BEGINS OR MATERIALS ARE PURCHASED.
7. MATERIALS, PRODUCTS AND EQUIPMENT SMALL ALL BE NEW,
EXCEPT AS SPECIFICALLY NOTED OTHERWISE.
S. CONTRACTOR SMALL BE RESPONSIBLE FOR LOCATING ALL DEBRIS
INA LOCATION OF THE PROPERTY APPROVED BY THE OWNERAND
SHALL REMOVE SAME IN A TIMELY MANNER DURING THE COURSE OF
NARK.
9. CONTRACTOR SHALL REMOVE FROM SITE ALL EXISTING
CONSTRUCTION AND IMPROVEMENTS NECESSARY FOR COMPLETION
OF THE PROJECT, PROTECTION FROM DAMAGE OR INJURY ALL
EXISTING TREES, LANDSCAPING AND IMPROVEMENTS INDICATED BY
THEARCHITECT.
10. EXCAVATE ALL FOOTING AS INDICATED ON THE ORAWING TO
REACH SOLID, UNDISTURBED SOIL. BOTTOMS OF EXCAVATIONS
SMALL BE LEVEL. CLEAN AND DRY AND AT THE ELEVATIONS
INDICATED ON THE STRUCTURAL ORAMNGS.
11. PROVIDE FINISH GRADES TO DRAIN AWAY FROM THE
FOUNDATIONS ON ALL SIDE OF THE BUILDING.
12. CONTRACTOR TO PRECISELY LOCATE ALL UTILITIES PRIOR TO
ANY CONSTRUCTION ANDAR EXCAVATION.
A DEVELOPMENT OF NEW HOMES AT
UNION ORCHARDS
258 UNION AVENUE
LOS GATOS CA 95032
REVIATIONS & SYMBOLS
a AND
DTMETER x ROUND
AEG. ACOIRBTGL
AF F. ABOVE FNISHED FLOOR
APPROX APPROXIMATE
ARCH ARCHITECTURAL
SLUG ELKS BLOLCHrtq
BEAM
CAS °ACD°Tre.XURT
H CIL
CC
p0 �CLEARGAUT xEASED OPENING
CO NC. C.CNCRETE
0w'. OGOLD VWAGIR
DEPT. 0291WMENT
D Ir. DRAILLAB HRx
p N W CRINKING FOUNTAIN
DI. EN6EON
08. w°OWNSPOUT
GW
.,..HER
DOUG DAMPING
E1 EXPANSION JOWi
EIECT I ELECTRICAL
EIEC
ROM
0E WE ffUBVB
EQUIPI EOUPMENT
SORT
EAST x IE) EXISTING
ENP EXPANSION
G.M. GALVANQED SHEET METAL
GYP. BD GYPSUMWARD
GVP. GYPSUM
NC FOLLOWLCNE
XVA3mDWE. NAROWARE
LORM 31, ONTAE.L.
NPR. Gi. HE EET4i[R
"HEAD IWnWgp°
LNG. BIDE EAMETER IOIMI
LNG (7 INMCC1. ORMWORSE
IX .4
JAN JANITOR
JET. KITCHEN
NIT CHEN
LAM. LAMRIATE
LAW,
NEON IAEC..
MMIARLIF4CETURER
MIN MININLM
$CEIIANEOUS
A
1 GROUNE
OCORSYMBOL
OCOOR MANS, ON
MOLDER NUMBER
OvnxoowrvPE
0.1 PLUMBING SY.
O APPLAUSE SVM OL
MRIMET. METAL
GYM ... OF SYMMETRICAL
TT t8
NORTH
NO erE
WIPE R NTRACT
NTB.
NOT TO GOALS
d
OVER
00
OUTSI° DIAMETER EDIIAMETER
DR.
OPENING
AEG
PERF
PLYWOOD EDGE NAILING
PERFORATED
P.IAM.
ORM TTY LWE
PVbi.."A.
PLYNO
PREFAB
PLVWIXp
REFABRICATED
PTO.
P.TDF
PAPER TOWEL DISPENSER
PRESSURE TREATED
IN C X11.
DOUGLAS FIR
At
RISER
R.
SET
RADIUS
FUTUFFE
RE NE
RE
REDNWEO
R 0.
NO" OPENING
N
R.L
RAIN V`VOOUATEl LEA°ER
S.AS.
LWACEDA SIDES
GL.
GHO
BULSE
s KGe oETECroR
NET
EFT
ELE
SHEET
P.
50 C.
SIMILAR
8 °EU TgN181
SST.
S%
STAINLESS STEEL
STEEL
STRLRICTI
sTTORUCTUML
STRL
SLOP
SUSPEND
GYM ... OF SYMMETRICAL
TT t8
OOHS tiE rN�+I ^G°MROUVE
TEL
THHRCU
TEIEFINGNE
GLV
T O.W.TH
iipXyflOUGX
TOP VEMEHIT
a
TOILET PAPER DI fRRSFfl
TYP
'RCASION
UL
UNDERWRITERS VE°RATORIES
UON.
UNLESS OTHERWISE NOTED
VERT.
V G.
VE�IDAL
CAL GMIN
wP
AMMT.G,
IN C X11.
WATEp aosET
ALIGN FACE OF FNBX
EN ROFR
O
wVA
WINE
WELDED WIRE FAIMC
DETAIL
ENTAIL NUMBERI WDA)
SHEET MERE CHIPS.
5 GUNK
SECTION
1 - SECTION NUMBER l IW GA .I
pT, - 5 E�ET� ERE $ECTw
INTERIOR ELEWTION
B�D
ELEWTION MORE RMR
bEi W}1ERE 11EJ£JgTIgN
G DRAWN
C
WORK, CONTROL, CR DATUM ROW
SENECA -
KEYNOTE
O
SEE LEGEND ON DRAWINGS
FOR EXPLARGYPI OF EACH
NOTE
DETAIL
ENTAIL NUMBERI WDA)
SHEET MERE CHIPS.
5 GUNK
SECTION
1 - SECTION NUMBER l IW GA .I
pT, - 5 E�ET� ERE $ECTw
INTERIOR ELEWTION
B�D
ELEWTION MORE RMR
bEi W}1ERE 11EJ£JgTIgN
G DRAWN
C
PROJECT SUMMARY
ADDRESS', 258 UNION AVENUE
OWNERS VALLEY ONE INVESTMENT - LLC
ARCHITECT CHRIS KUMMERER, ARCHITECT PH: USED) 2310342
E- MAIL:CHRIS@CKA- ARCHITECTS COM
APW: 52741 -012 & 52741 -013
ZONING: C -1 (WITH CONDITIONAL USE FOR RESIDENTIAL)
BUILDING OCCUPANCY GROUP: R3
TYPE OF CONSTRUCTION: V -S
AUTOMATIC FIRE SPRINKLERS REQUIRED?: YES
LOT SIZE. 32,708 BE (751 ACRE)
SETBACKS: FRONT -25'5
REAR- 20' -D'
NORTH SIDE -20' -0"
SOUTH SIDE - 0.4-
MAX. HT.. 35' -0"
PROPOSED HEIGHT 3265
PROPOSED SITE COVERAGE', SEE A0.1 -PROJECT DATA SHEETS
PROPOSED FLOOR AREA: SEE AD1- PROJECT DATA SHEETS
PROPOSED FLOOR AREA RATIO: SEE A0.1- PROJECT DATA SHEETS
PARKING PROVIDED:
2 COVERED SPACES PER UNIT- 8 UNITS =16 COVERED SPACES
6 GUEST PARKING SPACES PROVIDED
22 TOTAL OFF STREET PARKING SPACES
PROPOSED DWELLING UNITS.
8 DWELLING UNTTS (INCLUDING ONE BELOW MARKET PRICE)
LANDSCAPED AREAS:
SEE A1.0 FOR PRIVATE YARD AND COMMON YARD AREA
PROJECT CONSULTANTS
STRUCTURAL ENGINEER: GEOTECH ENGINEER
MA( CHENG B ASSOCIATES MURRAY ENGINEERS, INC.
288 DIGITAL DRIVE ME FREMONT AVE
.ORGAN HILL, CA 85037 LOS ALTOS, CA W024
(408) 782-6898 MAX CHEW RYAN MERRELL
MaXChengaggarlic.com ryan @m GayerpiGeemcGm
LANDSCAPE ARCHITECT. MAPPING:
ROBERT MOWAT ASSOCIATES LC ENGINEERING
20683RDST. 116 1291 CAKIANDROAD
SAN FRANCISCO, CA W107 SAN JOSE, CA 95112
(415) 7T74656 ROBERT MONHAT (40B) 806 -7187 NINH LE
rlanmmll @aoLcom N.@I.9ineeling.GM
CIVIL ENGINEER:
HOHBACH- LEWIN, INC.
260 SHERIDAN AVE.. STE 150
PALO ALTO, CA 91305
(850) 617 -59930 428 SHAJESH TIWARI
BTXN u I@hohbac W min.wm
THIS PROPOSAL IS A REQUEST FOR THE APPROVAL OF A CONDITIONAL
USE PERMIT FOR A DEVELOPMENT OF EIGHT NEW SINGLE - FAMILY
HOMES AT 258 UNION AVENUE. THIS PROPOSAL IS DESIGNED AS ONE
PARCEL OF LAND WITH EIGHT FREESTANDING HOMES GOVERNED BY A
HOME OWNERS ASSOCIATION (HOA). THE HOMESAND PRIVATE YARDS
ARE TO BE INDNIDUALLY OWNED AND THE DRIVEWAYS, GUEST PARKING
AND COMMON SPACE ARE TO BE OWNED AND MAINTAINED BY THE HKI
PRIVATE YARDS AND COMMONAREA HAVE BEEN PROVIDED. HOMES
ARE TO BE EQUIPPED WITH FIRE SPRINKLERS.
2010 CAUFORNIA BUILDING CODE, VOLUMES I AND
2010 CALIFORNIA RESIDENTIAL GODS
2010 CALIFORNIA ENERGY CODE
2010 CALIFORNIA ELECTRICAL CODE
2010 CALIFORNIA PLUM &NG CODE
2010 CALIFORNIA MECHANICAL CODE
2010 CALIFORNIA FIRE CODE
2010 CALIFORNIA GREEN BUILDING CODE
AND CURRENT LOCAL BUILDING AND ZONING CODES
NEIGHBORHOOD MAP
p 4
B
r'_' A I ademRd 6`
duetl=�
DIACn0911C9 + -RY
•
U
AREA MAP
*-I.F1 r.w.l.
PVY
C w YI -w.
H
NnrrlM,i y�N
�W
y �1 , r
Lp• i
.W� • ILAi.ea�:
y ,t
3
WLyIM .
,,.r O bnrIY YIIw IOU
MLoa QMR. -.A
P... _
rmwni
L r-.
N.r.
DRAWING INDEX
ARCHITECTURAL
AO.0 COVER SHEET
AO.2 FLOOR AREA SUMMARY
A1.0 SITE PLAN
A3.1a UNIT #1 PLANS
A3.1b UNIT #1 ELEVATIONS
A3.2a UNIT #2 PLANS
A3.2b UNIT #2 ELEVATIONS
A3.3a UNIT #3 PLANS
A3.3b UNIT#3 ELEVATIONS
A3.4a UNIT #4 PLANS
A3.4b UNIT#4 ELEVATIONS
A3.5a UNIT #5 PLANS
A3.5b UNIT #5 ELEVATIONS
A3.6a UNIT #6 PLANS
A3.6b UNIT #6 ELEVATIONS
A3.7a UNIT #7 PLANS
A3.7b UNIT #7 ELEVATIONS
A3.8a UNIT #8 PLANS
A3.8b UNIT #8 ELEVATIONS
r 650.2330342 r 650.2330345
ox s:
}T) p13 TECXNIGL REVIEW SUBMITTAL
4SFXHI TEGNIGL MI RESPONSE
I..14 WFIESUBMRTAL REVIENI
I1 -III.S P.M. CENSUS.
SUBMITTAL
2.44.14 APPEAL i0 TOM COUNCIL
U)
0
N
flL N
a6
2
O
Q
NU
6L 0
0
O W
7
Z
ul
1
Z
_O Z
0
Z
Z
N
CONSULTANT
7777 -
®ggD ARCH!
ti nMII4MExEE n
AOW2PPa
o NP
•p TIM
RECEIVED
\ECEIVED D> CAL \4
FEB 2 4 2014
,_. PA�,F NLIU F.N.
TOWN OF LOS GATOS AO e O
PLANNING DIVISION
M -13 -004
COVER SHEET
S -13 -020 thru S -13 -027
ATTACHMENT 14
NOON ICENOFICAGON
SENECA -
ROOM NAME
ROOM NUMBER
DISENSION a FACE OF STDD.
GONRY OR I.M. IUD NJ
• •
DIMENSION 0 CENTERLINE
OMENSION 0 FACE OF FINISH
- - PROPFRl LINE
NEW M FINISHED SONTOWS
_ __
EXISTING CONTWRB
ORANGE IN FLOOR FINISHES
ALIGN FACE OF FNBX
REVISION NUMBER
CLOUD INUCCES REVISED
AREA MDIN'MNGs
�I
FARTmWTYFE
PROJECT SUMMARY
ADDRESS', 258 UNION AVENUE
OWNERS VALLEY ONE INVESTMENT - LLC
ARCHITECT CHRIS KUMMERER, ARCHITECT PH: USED) 2310342
E- MAIL:CHRIS@CKA- ARCHITECTS COM
APW: 52741 -012 & 52741 -013
ZONING: C -1 (WITH CONDITIONAL USE FOR RESIDENTIAL)
BUILDING OCCUPANCY GROUP: R3
TYPE OF CONSTRUCTION: V -S
AUTOMATIC FIRE SPRINKLERS REQUIRED?: YES
LOT SIZE. 32,708 BE (751 ACRE)
SETBACKS: FRONT -25'5
REAR- 20' -D'
NORTH SIDE -20' -0"
SOUTH SIDE - 0.4-
MAX. HT.. 35' -0"
PROPOSED HEIGHT 3265
PROPOSED SITE COVERAGE', SEE A0.1 -PROJECT DATA SHEETS
PROPOSED FLOOR AREA: SEE AD1- PROJECT DATA SHEETS
PROPOSED FLOOR AREA RATIO: SEE A0.1- PROJECT DATA SHEETS
PARKING PROVIDED:
2 COVERED SPACES PER UNIT- 8 UNITS =16 COVERED SPACES
6 GUEST PARKING SPACES PROVIDED
22 TOTAL OFF STREET PARKING SPACES
PROPOSED DWELLING UNITS.
8 DWELLING UNTTS (INCLUDING ONE BELOW MARKET PRICE)
LANDSCAPED AREAS:
SEE A1.0 FOR PRIVATE YARD AND COMMON YARD AREA
PROJECT CONSULTANTS
STRUCTURAL ENGINEER: GEOTECH ENGINEER
MA( CHENG B ASSOCIATES MURRAY ENGINEERS, INC.
288 DIGITAL DRIVE ME FREMONT AVE
.ORGAN HILL, CA 85037 LOS ALTOS, CA W024
(408) 782-6898 MAX CHEW RYAN MERRELL
MaXChengaggarlic.com ryan @m GayerpiGeemcGm
LANDSCAPE ARCHITECT. MAPPING:
ROBERT MOWAT ASSOCIATES LC ENGINEERING
20683RDST. 116 1291 CAKIANDROAD
SAN FRANCISCO, CA W107 SAN JOSE, CA 95112
(415) 7T74656 ROBERT MONHAT (40B) 806 -7187 NINH LE
rlanmmll @aoLcom N.@I.9ineeling.GM
CIVIL ENGINEER:
HOHBACH- LEWIN, INC.
260 SHERIDAN AVE.. STE 150
PALO ALTO, CA 91305
(850) 617 -59930 428 SHAJESH TIWARI
BTXN u I@hohbac W min.wm
THIS PROPOSAL IS A REQUEST FOR THE APPROVAL OF A CONDITIONAL
USE PERMIT FOR A DEVELOPMENT OF EIGHT NEW SINGLE - FAMILY
HOMES AT 258 UNION AVENUE. THIS PROPOSAL IS DESIGNED AS ONE
PARCEL OF LAND WITH EIGHT FREESTANDING HOMES GOVERNED BY A
HOME OWNERS ASSOCIATION (HOA). THE HOMESAND PRIVATE YARDS
ARE TO BE INDNIDUALLY OWNED AND THE DRIVEWAYS, GUEST PARKING
AND COMMON SPACE ARE TO BE OWNED AND MAINTAINED BY THE HKI
PRIVATE YARDS AND COMMONAREA HAVE BEEN PROVIDED. HOMES
ARE TO BE EQUIPPED WITH FIRE SPRINKLERS.
2010 CAUFORNIA BUILDING CODE, VOLUMES I AND
2010 CALIFORNIA RESIDENTIAL GODS
2010 CALIFORNIA ENERGY CODE
2010 CALIFORNIA ELECTRICAL CODE
2010 CALIFORNIA PLUM &NG CODE
2010 CALIFORNIA MECHANICAL CODE
2010 CALIFORNIA FIRE CODE
2010 CALIFORNIA GREEN BUILDING CODE
AND CURRENT LOCAL BUILDING AND ZONING CODES
NEIGHBORHOOD MAP
p 4
B
r'_' A I ademRd 6`
duetl=�
DIACn0911C9 + -RY
•
U
AREA MAP
*-I.F1 r.w.l.
PVY
C w YI -w.
H
NnrrlM,i y�N
�W
y �1 , r
Lp• i
.W� • ILAi.ea�:
y ,t
3
WLyIM .
,,.r O bnrIY YIIw IOU
MLoa QMR. -.A
P... _
rmwni
L r-.
N.r.
DRAWING INDEX
ARCHITECTURAL
AO.0 COVER SHEET
AO.2 FLOOR AREA SUMMARY
A1.0 SITE PLAN
A3.1a UNIT #1 PLANS
A3.1b UNIT #1 ELEVATIONS
A3.2a UNIT #2 PLANS
A3.2b UNIT #2 ELEVATIONS
A3.3a UNIT #3 PLANS
A3.3b UNIT#3 ELEVATIONS
A3.4a UNIT #4 PLANS
A3.4b UNIT#4 ELEVATIONS
A3.5a UNIT #5 PLANS
A3.5b UNIT #5 ELEVATIONS
A3.6a UNIT #6 PLANS
A3.6b UNIT #6 ELEVATIONS
A3.7a UNIT #7 PLANS
A3.7b UNIT #7 ELEVATIONS
A3.8a UNIT #8 PLANS
A3.8b UNIT #8 ELEVATIONS
r 650.2330342 r 650.2330345
ox s:
}T) p13 TECXNIGL REVIEW SUBMITTAL
4SFXHI TEGNIGL MI RESPONSE
I..14 WFIESUBMRTAL REVIENI
I1 -III.S P.M. CENSUS.
SUBMITTAL
2.44.14 APPEAL i0 TOM COUNCIL
U)
0
N
flL N
a6
2
O
Q
NU
6L 0
0
O W
7
Z
ul
1
Z
_O Z
0
Z
Z
N
CONSULTANT
7777 -
®ggD ARCH!
ti nMII4MExEE n
AOW2PPa
o NP
•p TIM
RECEIVED
\ECEIVED D> CAL \4
FEB 2 4 2014
,_. PA�,F NLIU F.N.
TOWN OF LOS GATOS AO e O
PLANNING DIVISION
M -13 -004
COVER SHEET
S -13 -020 thru S -13 -027
ATTACHMENT 14
VIEW FROM NORTH
CHRI5 [UmeSE IF (p,
165023303n216502330,15
REVISIONS:
Y2T2013 TECHNICS. REVIEW%W77AL
.I l0 TECNNICSl .1. NEBPoNSE
108MI3 I SSUBMITTAL RENEW
11.11IA13 N..1NNING COW SISSC
SUBMITTAL
lo�
�vl
Q
U
0
2 O
U
0
O "'
z
W
Z
O Z
z
Z
Z
N
CONSUL
(a
RAGE NUMBER:
A0.1
VIEW FROM SOUTH
Go.vureR RBAOBRwrss
swuxAq wveuue -uwr r- R'pJEnf owu
-U
reeuxaxwvaMxe - upRre- PSIO�Cf p11iA
3Y uMIWE AVEMSe -SNR T- PPOJECI MTA
'SO UNpMAYENUE- WEIf l- PppF.T MITA
ANMRE- NITT2-
EgnMO
Cnrrrx0
FJEi1N0
CWIOrtgNp
MOMBF➢
MOIFR
REOUIREN
IERYIf]FL
UTAOMwVBE11E- UMW3
EMI0TM4
c4x0m0x0
Fl)B)N6
Cq]p]pgNy
MOPoBFD
q{yECf
REWIREN
pBWllf)EE
OumxIwlRR,m
EX.TW4
CONOIEpW
I...9
pgOIECf
gEWIREW
RESORTED
PESffTM
vpxrrTm
E }IBTIN4
EORERWNS
PPUpBFL
MOSECf
pWU1RFY'
PFAYIxR➢
SmE11 diM
ywpwsx.
OtlxMa.u10/c
Tadq laM
01
Lt
IDnlnp daMn
L.nOUx
Lt
c.1
InMp AUM
Cl
• MBbw
URI
YMUG.
BumlmbnWm
0unlmWllmlum
Iw1n- rulnbxl
yW
BrrmrWm
BuM mMxRI�Im
yyy
OWmgsNlm
• wmm�w.pr.pxx
IiMUp
Y�
BuMmW:lmim
wyl
EwY14n DaGMlGlkn
p0�' r
[pO
-
Os'MMD.GMxOpn
WWNORRC
fW
O.yIxDN
OG:v.I POn LM4..
l3.]pap. R)
Gqn
SRWRRERR3
mmer4Y
4GwYR4n OxenaOm
Opf1110'NA
q0E
-
ItlWIMN
mn.
]3.TM p.A
LYYe(KN
22llxp.fl.
• pIw11IrSIn•MMI
lgtln (G0.1U
ma
fz.lmpM1
• tlY lrl.11w•.glfl
IM tlGMM
]n.
E.)[4 M1
p
SRWIIm/:RISnt BU
Eabla mrM:
IaW -w wa.u)
IMVrYMG.'
MWynr.Ir11U
FaiTV m.IWy�:
SIM
110.r i p. RI
FiblsmblYf.:
Gu.AW RwO
FabbmGYAN:
6wbmYRaN:
• sus.
fi:h'lwmr44:
wax
Iap3. W. LI
E.I.bnolRlEx.:
• wow
OR•
O.SRER, RI
EN-1
CGIrti SNWx
Irilp
- WYM
,SM1wb -
y DRRapw
wam
)x.Rw.n
W4
_
BpnvsPM
LmM51vNnG
_
YEleo
B�
-
•tle
RYnMWr
•W
PsIW Watl
pBp
PwpWr
W
Ri .
• »y
-
Ww HnlluMlum
E1Yi9
-
YOe�
WoYNNA4mIUm
CNON
-
WwtlwMYUVIUm
CWtlN
-
WruT A4NCm
CW%q
-
• SSEpw
-
Wrwitl.MmYlum
EWry
• mxrep
mllrxOm,Ena•
• mesa
aWn
. www
Cm{WmMIpM
EMn
• IRrS
fmNtlm Onpr
4F1m sw.W:
MuMaRRIUncuec:
4pwybrw:
SaWSR p.-
FWnp Mcw:
M}W
loaR-
1.1.1EO
' "dw
1377
p168w
1.377 p6
t�zi�E�
1.377"
EEO1CRGn
1,12)pp.0
ammodor
1.130M1
pprpllp.
1129 pfl
I1T9 p.A
1, 12G..
uad.tl
M300q.R
mEM JS
2.197 W.R
WbW
2..n q.fl.
Gb.
Wrt
.m.5pn
�
.mOp.R
0rw
.4pp.R.
4.SSS
SSER, +
eaSRE, L1:
d.NarflU:
Nm
Irwpqu0eul
Wwxyem.wl
Wy
IrwxgeMewl
1y.wPyeMawl
� mr
Irrpgvawl
Orwpax+ml
D.ewpq.Mew)
. lOm
(W wpgn OUel
Were o-p.naWl
yrwPmP.arl
frwpa{ OGDI
Irwpgan0uel
IyEw pgecaw
laiwpyuawl
yw.RNoR.)
URRARR .,
UnRwRlgeeawl
Irrpgv.w
ERE
IrwpggpW)
IrwPq.nm)
lranpgeclaw)
(W WPgxL Wel
SOewpgvf etyl
Ir nm {.ui.a mw)
UAENR, a .,
WR
Iylwpa}Rewl
SEE OR fOxl
Ir abpryMJebl
My
IrwRURalenl
USE wpggerl
Iw.'QR pl
;.w
dr.1 .1
IrwPWb ERR1
IrairepupRaMl
US,
Uw Wwgedaatal
Ir. RRIS uR)
0RRRR f.)
.yyp
Iw Wpgeaaw)
URRRR .)
IrwPgwaw)
..r.
IW wpgena.ul
Ir aw wgeeawl
(rw.Mxaewl
,.w
ur ue o-nl.+R.M1
DPwPynSE.MI
Irwwgenbml
..w
WSR.NA S. ,
USE- .)
IrwpmpneWl
YulmunaalSM (A7
0SR. amu)
t.EE
SM1
.Wm1Ge)MpM II1J
mR
txazn.
ssa
xM.rpSR Rm
]0R
.]].Bn
SSn
RaUI- w
150,
:mAR.
ssn.
BxWW mxxP ITE1
]pR
(r.~A.)
Sxewp°o^oPl]M
Ir.nRPgeeawl
hire aq.c aeul
9RRSRv- m
DRR- .nn+.1
y:nUx^p..tW.PI]M
(r Rn RNMA w)
-
AwruRMeKI
-
GAVArRM415U
Iiv N.RMbO
Aav4Ri R.ebO
IbdAr2b1%1
TR- ARR..m
IA.AnGPWM
... �
buu
IrwpgeuaW)
Irwpm(.Maexl
, pyy
IrwxN.al.n1
yP fypgeM.wl
OrwpyN.N)
rr
IW wwxwaWl
(rwPa{enawl
Irwplyraawl
. OwP
WRwp.pa0.w
IW Mb wei.uml
WwRly.nar)
tr XUwyeaanl
fW wPRpaam)
0SR. awl
-
•a1r1
-
DRARRISRE )
ylyy
WSSAR~O.)
now
o
M:nL9
"
2.gamRs
rrllxiw ucMl
2paRLq. -M
xW NAIYInp
R.wI
ipRlipvetb
.MWVr
2wwW TfR
RSw IbwA UY9
xrUNNwb
wA S.i9W
PR
xR�Inn9 mul.b
2.,
.R.a.NM:wil
xWRP94uRb
.ri•pMlni
RrLL9
2RMII6+q Imb
pmwrN SRSKR
RPReeR(beM URI
2NRn ?Rpwb
wTi•1gW
R.mowN
2plJrypsb
eMrqux
TWRRIwRY
T1iGmIwNR
OwlMw.l.
OwFwrowG
Tr Rtelw.4
DiimnxwN
IrwpM^tibul
vxNc
Opt
ARREA
..rIN
rY
SRRII 2
SERS
SEES
rY
...yo
B.R.ssplk
UNIT #5
UNIT #6
UNIT #7
UNIT #B
]OIU780NAYEEIIIE
-U
I -9AOA MTA
-
mUNpX
ANMRE- NITT2-
EgnMO
Cnrrrx0
WTA
MOPOBEO
MaRCr
REW010W
re10BTTm
-EM
UTAOMwVBE11E- UMW3
EMI0TM4
c4x0m0x0
-PMKCf WLTA
MOPOBFD
rnwpET
REDUAEn
GRRMmm
mUNgNAYEN -UMH4-PA0.2f.1 WTA
OumxIwlRR,m
FY9TW0
PROJECT
MozECr
PESffTM
vpxrrTm
EWTWp
pOxORgxp
I000ppE0
pPOIpET
wLUNr
GYRtRTEO
ywpwsx.
OtlxMa.u10/c
Smplparb
Lt
USSR-..)
LxrymWn
c.1
NRRR w,awl
• MBbw
(Iew)�s unoaN)
YMUG.
• www
0unlmWllmlum
Iw1n- rulnbxl
YnIaG
Yr01
BuM mMxRI�Im
UNd-
• wmm�w.pr.pxx
Ounn m4n.tlun
+o.OM.Rp.M1)
UnnJUxn
wyl
BwN ml2mnwm
IB]]faN. RI
Owupx0.tlS:uMaR
mb'Owt
mxladel
rte
11 p,n)9p R)
ArYRbnOVMWn
O.yIxDN
Gw
l3.]pap. R)
WrY Rm pGGknGORn
SRWRRERR3
mmer4Y
ww
OwtlGYn pGW^wun
O0O'www
vm
mn.
xMY4WN
]'LIw p.R
L.IW(MN
• pIw11IrSIn•MMI
L.]w p.R
ma
L.IYR(GO R)
• tlY lrl.11w•.glfl
W.M4k
]n.
UR. "a,
SRWIIm/:RISnt BU
52700prt
IaW -w wa.u)
IMVrYMG.'
MWynr.Ir11U
�
SIM
110.r i p. RI
FiblsmblYf.:
Gu.AW RwO
6wbmYRaN:
• sus.
�
wax
Iap3. W. LI
E.I.bnolRlEx.:
• wow
O.SRER, RI
• WO
Irilp
&Y1ll
,SM1wb -
y DRRapw
WYV
)x.Rw.n
S,wygl yeG
tarrlam�
Wlw
swrmR
SIIm
.'W'S
-
GIMCmIRnI
ENNIS
• Ew
G.YIW WW
. Bw
PGFIGJWr
Rb
PoBWWr
• SIO
PeOIW W.vI
•.SSRES
-
WoNMTMrIXm
Cnp
WR
.e1W®
-
WwtlwMYUVIUm
CWtlN
-
RbEO
WNEMNUniwn
ORRIS
-
LwM
WmO X14NUnRUm
EIdSn
' odM
c,.
Eallpubn 9lNpa
nwee
EMn
• IRrS
fmNtlm Onpr
4F1m sw.W:
4pwybrw:
FWnp Mcw:
M}W
T
6wbel
1XI.S L
'..R L
®Ebw
I.AOAgR
pppv b.l
11mIR
wGa011b.l
I1T9 p.A
x
Wlnw.ls
2.]wSq.A
MOtIWeYS
z,p11Bp4
Wbr.l�
Gb.
Wrt
.m.5pn
�
.mOp.R
0rw
.4pp.R.
4't5p0:
Sr
4RRRR -)
Irrpgvawl
Spy
000rpopROW)
(W wpgn OUel
frwpa{ OGDI
Irwpgan0uel
RES
yw.RNoR.)
URRARR .,
yy
4mv. Ralq)
IrwpggpW)
ESS
(W WPgxL Wel
SOewpgvf etyl
Irmplµa Onl
Iylwpa}Rewl
•EW
(r ARRy. )
IrwRURalenl
Wp
URR. .,
dr.1 .1
pyp
Irwpy.aml
Uw Wwgedaatal
pye
Uyrogenml
Iw Wpgeaaw)
• W.
(rw.gwaml
IW wpgena.ul
011p
USS. abul
ur ue o-nl.+R.M1
pW
IW r1Nnm1
WSR.NA S. ,
, yy
IW- RRoR -)
0SR. amu)
YWmum Mlphl(N
aZIYn
mR
0W/wRGwpMeV
tNR
]0R
.- kmShtW
iNIO,
150,
YGYar My01(N
1M.BR
]pR
wMMV.wr1w
yr EU pmiwaw)
Ir.nRPgeeawl
RRRSRviw.p.ITTI
IrwpynaWl
RupgvawtPRU
Wpw Mpaawl
r1+lEOMR....PAU
ywwMyvaw)
-
GAVArRM415U
Aav4Ri R.ebO
TR- ARR..m
... �
• aor
IrwpgRRaml
IrwxN.al.n1
. pSpr
Omeb PpiRn0eo1
IW wwxwaWl
DMI.p
y.wPq.M.r
WRwp.pa0.w
,DMIP
tr XUwyeaanl
fW wPRpaam)
• aow
WRRAR~ -1
-
erw
ImR...)
•Pow
ImraOlGxexl
o
Wew pgvi.rl
"
Mnp
-
2.Pxn
mGwlfw.M Ullel
ipRlipvetb
.MWVr
PWW
-
aNrMetllulill
xR�Inn9 mul.b
P.MIM
GaGaGlbesn W)
2RMII6+q Imb
Mw q
zuwMprGp
RGwNr1: W1
2plJrypsb
eMrqux
TWRRIwRY
OwlMw.l.
Tr Rtelw.4
RyPrxxG
'
Sww.
..rIN
rY
RRER
Yw..RPw
rY
0
B.R.ssplk
UNIT
01 UNIT
#2 UNIT
#3 UNIT #4�
aw uMax
wwxu • ane
- • PROICCS wrw
pOXORIOW
MOpgpEO
MO3ECf
wPtr,r
SFrT]®
:v11np.1..IR
E.1
LMUx
moi
OumxIwlRR,m
P1.,,D.Snap.n
wyDOm 1
Pr
Tr.o-.Ip.N
OtlxMa.u10/c
. Wm
USSR-..)
. ws
NRRR w,awl
• MBbw
(Iew)�s unoaN)
• www
Iw1n- rulnbxl
,ASSSRrw'
• wmm�w.pr.pxx
+o.OM.Rp.M1)
'smand/O. )
IB]]faN. RI
- WbwRIrlJUw1
11 p,n)9p R)
' pW}UEUIIbI
l3.]pap. R)
1.1Gw1)µ'
. rm
mn.
mn.lxwmul
m4V�OSnw1
• pIw11IrSIn•MMI
ma
mLllxrxRl
• tlY lrl.11w•.glfl
]n.
Onrmmmp
SRWIIm/:RISnt BU
IaW -w wa.u)
Yrt
MWynr.Ir11U
�
SIM
110.r i p. RI
SOY Irxmlm
118]aa ➢p. N
Gu.AW RwO
• sus.
�
wax
Iap3. W. LI
mx nR.pm.n
Ilprgp 4)
• wow
O.SRER, RI
Irilp
,SM1wb -
y DRRapw
2.,RR•' oRb
.wvpwltBwl
)x.Rw.n
tarrlam�
swrmR
PROJECT DATA SUMMARY
R E V I
}x).pt> iECIIXILN TEOHMM .
REVIEW aIIBMIRN
..0131ECMXgeL REVIEW RESGCPEE
1.13 IRE BU@ Al REVIEWS
fi.1¢x013 PLWSUB 17TAL $ICH
O AL
zi.301RAMFAL To TONN LWXGL
NEW
U
O
2 a
U
J
0 W
7
Z
Lu
Z a
2
0
O _
Z
Z
N
CON9VLT
A0.2
.ECT ENTA &IEET
------------- ----- -- - -- - -------
- ------ -----
-------- --------- --------
----------
(N)TREE (N) TREE FEE
SEE,LP1 SEE.I_PI SEEILP1 SEE LPI
(N)TREE (N) T (N) TREE N 00000'50" E 21,1.00' (N) TREE
SEEjjj LPI
k
0 0 0
TO REMAIN TO REMAIN
(E) W TREE (E) 24- TREE
o GE) 1Y TREE
t(N) (E) IS- TREIE TO REMAIN
(E� 16' TREE
TOREMAIN .,SEELPI TO REMAIN DEAD -TO
BE RENDVE
LREAR YARDS 'EAR YARD 6 ""K REAR YARD 7'•,' BEAR YARD 8
1525d W5 Ef
�INE OF SI ..... INS OF AST BMW. TYR
•
I STORYOF
TRASHL 5 ------------
DOMED
v 7
FRONT YARD 5 ---------
off—: ---------------------- ------- - - ------
GUEST _j
PARKING I E
v
UNIT 5
L- - - - - A - - - - - -J - - - - - -J
• (TYPE IS-) NCNB,
TABLE
------------- --------------
----------- -- -----------
A�
7
............. UNIT 6 UNIT ................... .... UNIT 8
(TYPE'C') SHRUBS (TYPE 'C'): (TYPE -C-)
GARAGE GARAGE A GARAGE GARAGE GARAGE GARAGE
PARKING PARKING A SHRUBS PARKING PARKING PARKING PARKING
PARKING El 62 STEEmNG: 7.1 72 8�1. Z.2
........... .......
1W.D. TYP
-------------- ---
.... ..... . ....
"GARAGE' -
27-410 PARKING , 56 "
5.2
--- - GM FRONTYARD a
-----------
EM] AL
FEAR YARD I WEST COMMON REAR VAR
i GUE! 280 d PARKING 4: 245sf
7
.. . .. ...
+a% AREAS
:PARKA G:
w 1815
TRASH Z --------- ---------------- ---- H 2
TY VP
-GARAGE`
-GARAGE,,
ILL I I PARKING PARKING
2.1
O
3.1 WEST
PARKIN f
------------------- - -------------------- 25W G
F-
G6EJ UNIT •
:PARKA GARAGE, lz im UNIT 4
W) PARKI PARKING
GO TYPE
(TYPE
2.2 3.2
Z
[TR�. 0
Ell
UNIT 2 UNIT 3
'GARAGE., I c 'GARAGE-
PARKING 'C' PARKING
(TYPE (TYPE
4.1
(BMP UNIT)
-
---------------- ----
GARAGE` 26,0'
PARKING PARKING
--- -------------------
------------------
(N) TREE
SE�EUF`l IN) MEE (N)TREE
P1
ZEWA�Y7 SEE I-PI ORIVEWAY SEE UPI EE SEE LPI 5 L SEE LPt
FRONT YARD I,, DRIVEWAY SEE LP1
DRIVE (N) MEE IN) TREE DAIVEWA)
SEE SEELPI FRONT YARD 4
LI
r FROM(, YARD 3
FRONT YARDS
-- ---- - - - -- ------ I . ........
�,T (274d-AREA ------- _SCATED�P WATER)j
J." R
tq7 7 3:
4sf-AREAALLO�TIDFORWATE
% - _3_-_I - ---
(6180.AREAALLO�TED FOR WAME ...... ----------
---------- -- ------ ------------
7,'——
NOW0050 E 22r,.00
X
N) S EET W14) ET ; x N BEET
(E) STREET N7 SIGN TO BE
1 Si STREET, - STREET STREET
STREET' STREET-- ":SMEET
PARKING PARKING PARKING PARKING i PARKING PARKING
PARKING- PARKING. RELOCiATED.
i (N)STREETSIGN
--------------------- --------- -------- ---- ----- - - ----- - ---- -- ---- -------------------------- _�TION ------------- ----------
UNION AVENUE (E) STRMT �E) FIRE
LIGHT TO HYDRANT
4F% REMAIN AF-0. TO REMAIN
I
F75i
ILL
o
'K,
CHR'SXIJMMEREP, & ASSOCIWEC
650.233 0342 •650 233 0345
REV IS I 014 5:
.., 3 TEC,NlP,l
EC,,l.
4Z I)13 TECHNICAL REVIEW RE BONSE
�ZZL,3
RE'Sm
: I FNAB.M COMM35'.
SUSM77AL
1341014 APPEAL TO TMN CCUNCL
ttON 8888
C)
<
T0
C6
—
!R
L)
TRUE NORTH
co
(if
0
0
Ld
Z
Z
0
z o
CO
Z
CO
D
CONSULTANT
STAMP
3980 Ap08i
ttON 8888
BAN a C R
A1.0
PROJECT NGRTI
TRUE NORTH
am.
M••,A
I
PROJECT NORTH
TRUE eUNIT 1 - SECOND FLOOR PLAN
UNIT 1 - FIRST FLOOR PLAN
GENERAL FLOOR PLAN NOTES
T PROVIDE DW BLOCKING IN BATHROOMS CENTERLINE OF VS BLOCKING 9 L BE SP'ABOVE FINUMEO FLOOR
PROJECT NORTH
TRUE NORTH
e
REVISIONS'
9 7,MI3 TECMNIC4 ROAMN SUBM17AL
168AI1'..UBMITTPLIR IEV/1
11 -IRM13 %ANNINO COMMISSION
SUBMITTLL
zN. 014w EA. TO Cm COUNCIL
0 120
O
Q
U
N
2 °
0
r °
O W
Z
W
Z
O Z
0
z
zN
CONSULTANT:
(a
A3.1 a
UNIT 1 - PLAINS
NEA VVNS 1M -11
HEIGHTLIMIT ]XI18�-
OVERALL HEIGHT 298A j—�
TO PLATE 2.52'.
b
m �
To SUREIA. 282.
5
T
T O. PUTS 281
m
TO SUSRP. 2H
CIO GR &GAUGE SUB 211.
O
MID
'�S-
Irk' \fir
!ICI I ZI L, I
i
ea
UNIT 1 - NORTH SIDE /GARAGE ACCESS ELEVATION 2 ` °
4 SCALE: 1/4" = 1'_O
OHO
OGG
UNIT 1 -SOUTH SIDE /NEIGHBOR'S DRIVE ELEVATION
2 SCALE: 1/4" = i' -0"
FEE
UNIT 1 - WEST (FRONT / ENTRY) ELEVATION S�—
J SCALE: 1/4 " =1' -0"
1 UNIT 1 -EAST REAR YARD ELEVATION
SCALE: i/4"
REVISIONS
=S,,O ] TECHNIC1 P OIER SMTfAL
] TE=
REVIEW RESPOV]E
1PLA1](PREAUSAITTAL REVIE"
n19281] PUNNING COMMISSION
YUY.TTA-
NSUS YAPPEALTOCm COUNCIL
CIO
N 0
Q
U
2 O
NUN
L.L rn
O
0 W
D
LU
W
Z
O 2
0_
Z
Z
N
CONSULTANT
STAMP:
aayB Ag °B!
cnRYeovxex ;.
XOYY2P[P
Ru ILO
2 Ot Od,+140
A3.1 b
UNIT 1 - ELEVATIONS
NEw ELEwTICNS °
(
PROJECT NORTH
TRUE eUNIT 2 - SECOND FLOOR PLAN
PROJECT NORTH
TRUE W.
EDUNIT 2 - FIRST FLOOR PLAN
GENERAL FLOOR PLAN NOTES
REVISIONS'
321 IJ TEG.M. RENEW .USNIIL
41 2413 TEONNICAL RENEW RESPONSE
1p mu IMLESU."N' REVIEW)
11n.2Sv PLANNING GGMMISSIGN
SIISMRTLL
Ex 14 APPELL TO CM UVNGn
rm7wfl
a
U
rri
2 °
U
r0 °
O W
W
Z
O Z
O
z
zN
CONSULTANT_
STAMP
(a
1 PROVIDE 2XE BLOCKING IN BATXROOMS. CENTERLINE OF AB BLOCKING SXµl BE N' ABOVE FWISXED FLOOR. PA.. N .... R
A3.2a
UNIT 2- PLANS (BMP UNIT)
NESSANS w' -�•v
r
HEIGHT UNIT 306.38
OVERALL HEIGHT 29533 - �-
T.O. SLAB 211 BE
T.O. GARAGE SIA68 RG GRADE
■■EIS
�■ �I� ■■ AID �� ■■ h�I II��I
I
nnnnnnxm nxmnmmn =
Iyl
STUCCO FINISH —GAS FIRERACE
TRIM AT DECORATIVE VENT
CHIMNEY
4 UNIT 2 - NORTH (SIDE /GARAGE ACCESS) ELEVATION
SCALE: 11w. = J?
UNIT 2 -WEST (FRONT / ENTRY) ELEVATION moor
SCALE: 1/4" = i' -0"
Eff
FRI
UNIT 2 -SOUTH (SIDE / PRIVATE YARD) ELEVATION
SCALE: 114" = IF
%1 UNIT 2 - EAST (REAR YARD) ELEVATION
�JSCALE: 1/4" =1' -0" 2 o a
r 652233C341 6-62330345
REVISIONS:
S33M13 TE0@IMAL RENEW SIIM.IITIAL
, -M301S TELNNICX PEVIEW RESPOMF
164M1)IPRESUBNInPI PEVIEWI
11.19- .1SPIANNING COMMISSION
SUBMITTAL
2 4-WM AWELL TOCITY COUNGL
Q M
O
li fA
a °
N
2 °
U0
N O
0 W
Z
W
Z
0 °
Z
ZN
CONSULTANT:
OOMOP YEM STAMP—
0ST ARCb
4 CMP6POPNPP P
L
POYYLPeP
no teem
'�f PN NW1l Q
C qo
P➢ CALL
PAA3.2b
UNIT 2- ELEVATIONS (BMP UNIT)
NEW ELFWTQHS 114 =1'V
z
UNIT 3 - SECOND FLOOR PLAN
PROJECT NORTH
TRUE NORTH
G
I
PROJECTNORTX
TRUE NORTH
eUNIT 3 - FIRST FLOOR PLAN
GENERAL FLOOR PLAN NOTES
1 PROVIDEWBLOCXINGIN BATHROOMS. CENTERLINEC UBBLOCXINOSHALLSE3i -µ3 FWI8 DFLOp
C XR I5111 MICE RP U L 'SIC IL TES
650.233.0342 r 650 233 0345
lU -11 11111
REVISIONS:
3314013 TECHNICµ REVIEW SUBMITTAL
4I54A13 TECHNICAL MEN£W RESPONSE
166A131PREBLeMET REVILER,
ITI.BIO PUNNINO COIMISSION
SURM17AL
t 24 14 APPEAL TO OW COUNCIL
N
L -Rw
LL �
U
2 °
U
J
0 W
7
W
Z
Z
OO
Z
DID
Z
N
CONSULTANT:
STAM-
a01D ARC81.+
[aa G1xwmPH[n p
°AB xMY��l4 e
0R CAL1
P AGE NUM SEA:
A3.3a
UNIT 3 -PLANS
NEW RUNS Ur•1'A
O ❑
❑ MBATH bt
❑ MASTER BED 1 B
I
�L J
M TOILET I
M CLOSET 1
�
L
ON �
W O:
N
C
LAUNDRY ❑ OFFICE I ^/
\/ STAIR IANDING
BALMf ❑ N
❑
BEDROOM
BEDROOM
TOILET
40
_ C
13125"
N
„
PORCH
T�IE
#5
E6.
1Gd 1?
131 1?
UNIT 3 - SECOND FLOOR PLAN
PROJECT NORTH
TRUE NORTH
G
I
PROJECTNORTX
TRUE NORTH
eUNIT 3 - FIRST FLOOR PLAN
GENERAL FLOOR PLAN NOTES
1 PROVIDEWBLOCXINGIN BATHROOMS. CENTERLINEC UBBLOCXINOSHALLSE3i -µ3 FWI8 DFLOp
C XR I5111 MICE RP U L 'SIC IL TES
650.233.0342 r 650 233 0345
lU -11 11111
REVISIONS:
3314013 TECHNICµ REVIEW SUBMITTAL
4I54A13 TECHNICAL MEN£W RESPONSE
166A131PREBLeMET REVILER,
ITI.BIO PUNNINO COIMISSION
SURM17AL
t 24 14 APPEAL TO OW COUNCIL
N
L -Rw
LL �
U
2 °
U
J
0 W
7
W
Z
Z
OO
Z
DID
Z
N
CONSULTANT:
STAM-
a01D ARC81.+
[aa G1xwmPH[n p
°AB xMY��l4 e
0R CAL1
P AGE NUM SEA:
A3.3a
UNIT 3 -PLANS
NEW RUNS Ur•1'A
HEIGHTLIMIT CCLCS
OW U- HEIGHT
T.O. PLATE
T O. SUMR.
TO .P TE
VENT
-I -I- II ►�I� •� �•- ��• ��IA�IIIIIIIIIIIIAIAIAIAIAIAhI�Iq�i !I!I!�!I!i!I!
I . -
VGRCOVE
TO GAPAOE SlAtl 61e1
WS FIREPLACE
VENT
3._Q.
T
- - COOKTOV VENT
UNIT 3 - EAST REAR YARD ELEVATION
SCALE: 114 " = T -0" v' > 4 e'
w ►°
W
o
z
W
z
o Z
0_
Z
D
Z ►�
N
01
-
CONSULT
STPM p:
aSV9 A8C0
,` mumroman r
AvN�eua
p8 tl) CAT'VT
p pGE NUMBER:
A3.3b
UNIT 3- ELEVATIONS
Nm EI TIoNS +u• =ra
ed.
PROJECT NUN -
RU�N
UNIT 4 - SECOND FLOOR PLAN
GENERAL FLOOR PLAN NOTES
1 PROVIDE 9 6 BU KING IN BATHROOMS CENTERLINE OF 3KB BLOCKING ENA L BE W ABOVE FWISNED FLOOR.
cis rljm •EPEe m P6oc A'E'
}[142 -6YG 2136345
REVISIONS
11.1]TEUNIGL RENEW WEMRPL
4S.N13 TECHNICPL REV IFN REBPoN6E
Jp R,13 IRRESUBNOTAL REVIEW)
11.1& 13 NANNING COHNSBION
AMNIT AL
].M4 MAPPA -TO UT' COUNCIL
N
1� Q
U
rn
2 O
Q
U "
U)
n/ O
O W
Z
W
Z Q
0 °
Z
7
Z 12
'r
COSULT —
N
PAGE NUMBER:
A3.4a
UNIT 6 - PLANS
NEW OUFITO . 1.. -I:
OVERAI
T
TO WMGE
: 650 233 0342 , 0+0 233 0346
REVISIONS:
1373013 RCNNICOL REVIEW 6VBM1]]IL
420.p13 ]E.M REVIEW RE..E
IDD30131RREAVE.11P1 REV,PM
1114p10 PIAM4.. CCMMm.
6UBMTT4
334p1° A. TO GTT C ANCIL
3 UNIT 4 —VVtJi rrwrvl � C3'3 L3 — —
4 UNIT 4 -NORTH (SIDE/ NEIGHBOR'S DRIVEWAY ELEVATION SCALE: 1/4 " =1' -0"
SCALE: 1/4" = 1' -0"
a ° UNIT 4 - EAST REAR YARD ELEVATION
2 UNIT 4 -SOUTH SIDE /GARAGE ACCESS ELEVATION SCALE: 1/4 "= 1' -0" a <
SCALE: 1/4" = 1' -0"
U)
0
(
1y
Q
2
U
0
Z
0
Z
N
03
Q
U
C
O
Q
0
J
W
J
Z
Q
Z
O
z
D
N
-
CONS ULTA
sFM-
PAGE NV.R ER:
A3.4b
UNIT4- ELEVATIONS
NEW GFATIRI- I... I
PROJECT WITH
TRUE ( T� NORTH
UNIT 5 - SECOND FLOOR PLAN -BMP UNIT
UNIT 5 - FIRST FLOOR PLAN - BMP UNIT
GENERAL FLOOR PLAN NOTES
: 660 233 0342 r 550139 0 „1 '
REV IBIONS:
}.2T.N14 JECXNK..LL REVIEW SVWIR>L
,2&MISTECMiCILXENERR POPE
1.1] {11R65VSMITRI-R.E.
1f .15M1J PUNIIXG CONMISSIGI
wBLBTaL
,UaM AAPrw TO OW COUNCIL
co I
N
r
Q
O
Of
2 O
Q
U ”
ry °
W
O
Z
W
Z
O Z
O
z
Z I�
N
CON5ULT-
STAM-
1. PROVIDE US BLOCKING IN BATHROOMS CENTERLINE OF 1X4 BLOCKING SHALL BE S V ABOVE FINISHED FLOOR.
PAGE NUA3.5a
UNIT 5 -PLANS
NEw WANG i..1'0
PROJECT NORTH
TRUE NORTH
1. PROVIDE US BLOCKING IN BATHROOMS CENTERLINE OF 1X4 BLOCKING SHALL BE S V ABOVE FINISHED FLOOR.
PAGE NUA3.5a
UNIT 5 -PLANS
NEw WANG i..1'0
HEIGHT MMIT SO M
WEBPLL HEIGHT
TO PLATE
TO SUBM
TO PIA
T.O. SOP
TO. GARAGE STAB S LEI G.. 11-7 1
— CAS.GENOUSEST'. COOK
GARAGE ODOR
_ .." I , a /--\ I WIT 5 — WEST (SIDE ACCESS) ELEVATION Yy
v4" = V -0-
—GAS FIRWU CE VF.HT
V Y r S
UNIT 5 — EAST REAR YARD ELEVATION
SCALE: 1/4" = P -0" a z r B
U IC
�0
O w
z
w
Z
OZ
7
Z I�
N
-,
CONSULT—
STAMP:
9L0 AACA
V G!PleiaflMn P
4
RO YYSPeR
M c3Wm p
sA pea 1 nil
LOA CAL�q
pAGENOM9ER:
A3.5b
UNITS - ELEVATIONS
HEN MEMTONS
PROJECT NORTH
TRUE NORTH
UNIT 6 - SECOND FLOOR PLAN
GARAGE
L
2' B11
UNIT 6 - FIRST FLOOR PLAN
25'B'
❑ ❑
PATIO WITH TRELLIS
BATH 3 AT
Fo
COATS LNING R04M
O
POWDER
-NINE ROOM
NET r
KITCHEN
CHFI(YUMMEPEP& L -E`_
650 233 0342 r 650 213 0345
❑ -
REVISIONS:
12 ZI13TECHNICALRINMW BUBMRTA-
'q 4M�13 TECHNICAL BEVIEW RESPONSE
1P 131PHE-BURNITTAL REVIEAM
11.14AII PUNNING CONSIS PON
BUBMITTAL
i4M 14 APPEAL TO T01NI COUNCIL
U
Cal
n/ O
0 w
Z
w
Z
OZ
N
COVERED PORCH n
13'8. _ I. _s -m yr 3'S L2 CONSULTANT:
PROJECT NORTH
TRUE NORTH
O
GENERAL FLOOR PLAN NOTES
1. PROVIDE 2%8 BLOCKING IN BATHROOMS. CENTERLINE OF M BLOCKING SW t BE 3f ABOVE FINISHED FLOOR.
STAMP:
9g9 ARCH
y CNPIetOPX01 6
XOYYEXEP �
nN I�AT ¢
vT O p i TT
PAGEN-
A3.6a
UNIT S PLANS
NEW PUNS W'•1'V
NEW, IWR
TO .P TE 2W. -rte
To SUBFM
To PUTE
u
T O. SUNS 221
T O.G E SIAS S (E) ORAOE 271
66_1
1/4" =
IIIIIIIIIIIII
114" = V-9,
P
2 4
VENT
6=\
1/4" =
p_I
1/4" =
'—OAS FIREPIALE
VENT
_., :.. IF It 1111
-F'
65023}93426501.'_1x345
pEVIS10N5:
}37.31113 1ELNXILK REVIEW SIlW.11TlAL
FID3013 tECRNICN N.1EW RE5PoN5E
16SID1J (PREEIIBMIITAI XEYEIN
11. 112.1111x.116 LONNSWoN
SUWm L
2-2444A11E.LL To CCVAC'1
VJ
N
�
�
LV
Q
U
2
rn
O
Q
U
"
1Ar'
1..y
0
O
0
W
Z
U.1
Z
O
Z
z
Z
ZOD
ID
N
D
CONSULT—
STAMP:
9d➢ ARCA
p cNnuTWxav J
XOYM90.60.
4
'POy CAL \So
A3.6b
UNITE ELEVATIONS
NEW EU TONS
UNIT 7 - SECOND FLOOR PLAN
6 P.
LMNGRWM ❑
❑ �O
POWDER
UINING$COM -
REF
�1
ENTRY
r KITCXEN
IL
I
k COVEREp PJRCX
I '
r—+
3''514" 6.10 t12" +3'8
PROJECT NORTH
TRUE NORTH
UNIT 7 -FIRST FLOOR PLAN
RATH3
COATS
GENERAL FLOOR PLAN NOTES
1 PROVIDE 2%B BLOCKING IN BATNRWMB. CENTERLINE CP VS M)CKING SPIA. BE 3P ABOVE FINISHES FLOOR.
GAPAGE
20.112"
6TAMP:
®6a ABCQ
V CHNPtWNEP R
L
KIIYYNeP
vM Clx9l Q
SC
AP OP CA4\
A3.7a
UNIT 7 PLANS
NEW PLANS IN'. IYf
HFIS KVMwEREE &ASSCOI -E'
65D 233.03421650.2310345
1
�. n xn[co.con
gEVI5CNNJ :
}EI.IDt]TELXNIC.LL REVIEW SU6WTTAL
436E01]TECPNICN REVIEW gESPoNSE
+ouoa t,RESU.I. REW."
11 -1PID1) PUNMNG COMMISSION
SUBMNTAL
OCM4
2N404 APPEAL TO TOWN MUNCIE
^
=
C6
o
Q
U
O
J
O
W
Z
W
Z
a
O
Z0
Z
z
CONSULT -
PROJECT NORTH
TRUE NOUN
O
6TAMP:
®6a ABCQ
V CHNPtWNEP R
L
KIIYYNeP
vM Clx9l Q
SC
AP OP CA4\
A3.7a
UNIT 7 PLANS
NEW PLANS IN'. IYf
m
9 ]' °' ° UNI I / - VVCJ I rrtv°ry I
UNIT 7 - NORTH SIDE ELEVATION 3 SCALE: 111V` 1'-0"
HEIGHT WIT 3W 2&4-x— SCALE: 1/4" =V -0"
HIGHWNLOW ryP— rXIGH MB Ak WNW —HIGH OB°GIME NINWN
OVEPPLL HEIGHT 295. C _f - --
= x
TO PLATE 2W —
_
T O. SUBflR. 202.4 +>. T
TO PLATE 201 i5-��
TO. swe 271. — - - - -- —
T O GARAGE SUB B M GRADE 2713
G UNIT 7 -EAST REAR YARD ELEVATION
UNIT 7 - SOUTH SIDE ACCESS ELEVATION SCALE: JIw = _0
2 SCALE 1 /4" = 1' 0"
CHRIS Y IM^ +E PER & ASt )C14iE5
650 Z33 0342 1 650 233 0345
REVISIONS:
1]] 1013 7EGXNIL4 REVIEW
SUBYIRAI
636ID1)1ELXXIGOL FEVIEW
RES ^uE
+66A1] (..U&.
MAl REVIEWI
11 -I6A+] PIAXXING
SUBMTIAL
OO..WIOX
R.1. 1. APPEAL TO l
WM CGM'CH
v!
N
�
I f
Q
Q
U
2
f/1
O
Q
U
"
0
O
Ed
D
LU
Z
a
O
Z
0_
Z
ZN
CONSULTANT:
STA. P
e9g9 AflCb
y CNPI3NPH60. P
oyYMO�; �
4
t�
CA
PAGE N-
A3.7b
UNIT 7 ELEVATIONS
x5w EuEwnors
e
PROJECT NORTH
TRUE NORTH
UNIT 8 - SECOND FLOOR PLAN
a
y
1].1112.
Y -0iT 5-1012" y
UNIT 8 - FIRST FLOOR PLAN
1Y%
GENERAL FLOOR PLAN NOTES
1. PROVIDE US BLOCKING IN BATHROOMS. CENTERUNE OF US BLOCKING SMALL BE M'ABOVE FINISHED FLOOR.
30. 1rz
PROJECT NORTH
TRUE NORTH
Oo T
BTRMP:
� cv. ovxeR s
v P R�BYYR1B31 s
4
01' C A 4l
4
PAGE NUMBER:
A3.8a
UNIT R PLANS
.P. 111.10
R EVI510
3.74013MCXNICALREVIEWSIBWTTAL
,N4013 TECKNIG- REVIEW RESPONSE
1062013 LPRE.WM4I77AL REVIEWI
I1fIN3013 M.N.. CON.SS'ON
SUBM.
5.7-014 APPEAL roTOMM CCUfFIL
V i
N
�
Q
C6
2
O
Q
U
wr'
ry
0
J
O
W
7
Z
W
Z
a
O
°
Z
GO
Z
GO
D
N
Oo T
BTRMP:
� cv. ovxeR s
v P R�BYYR1B31 s
4
01' C A 4l
4
PAGE NUMBER:
A3.8a
UNIT R PLANS
.P. 111.10
0 -1
1 /a" __
HEIGHTUMrt MWEE
VIVI I U
� 3 scn�e va° = r -o°
0
rXIGX C&SCURE'MMMW F—NIGX OBSCURE WNAAR
wGH WxCOW -rvP—I I I
I �
I
HEIGNT LIMIT 290.83
00
TO. %ATE 291.30
b / \
m AGO
10.S ______
RATE
10. %ATE 30213
1
ID �
- ______— AS FlREPIACE
ENT
10. 2]]5
10 GARAGE 31AB B (E) GRME ]
Z)R 96
UNIT 8 - EAST REAR YARD ELEVATION
1. 1 1r icing: ArcFSSI ELEVATION Gy scALE:1ia " =r -0° B R ''
VV\
9�9 A8O0
� clmlRmvxml o-
4
ROYN0XA9
O
>A P® 1N all
AGA CA1'Tq
PAGE NUMBER:
A3.8b
UNITE ELEVATIONS
NEW EX.TONS 1N =1C
CHPh RUM„F PER (3 A$$OG <Tf5
650 233 0342 - 650.233 034i
REVISIONS:
1373013 iECMNIGLLREVIEW SU&MT]PL
GffiID13 TECXNGAL RENEW RESPoN3E
16 131PNE_EUEMITTAL
PRAEM1
11 -11.13 PUIRNG GONNESEON
SUBMITTAL
2 -MNM APPEAL TO TOAN CAUNL4
v I
QE6
Q
2
°
Q
U
"
Ir 0
°
O
ud
ud
0
w
Z
a
O
Z
0
Z
7
Z
GO
GO
N
c.NSULTANT
9�9 A8O0
� clmlRmvxml o-
4
ROYN0XA9
O
>A P® 1N all
AGA CA1'Tq
PAGE NUMBER:
A3.8b
UNITE ELEVATIONS
NEW EX.TONS 1N =1C