Agreement with Placeworks, Inc..�pWN OF
1pspjOS COUNCIL REPORT
DATE: March 11, 2014
TO: MAYOR AND TOWN COUNCIL
FROM: GREG LARSON, TOWN MANAGER
MEETING DATE: 3/17/2014
ITEM NO: 3
SUBJECT: ADOPT A RESOLUTION AUTHORIZING THE TOWN MANAGER
TO ENTER INTO AN AGREEMENT WITH PLACEWORKS, INC. TO
PREPARE THE HOUSING ELEMENT UPDATE AND REQUIRED
ENVIRONMENTAL REVIEW DOCUMENTS.
RECOMMENDATION:
Adopt a Resolution authorizing the Town Manager to enter into an agreement with Placeworks,
Inc. to prepare the Housing Element Update and environmental review documents.
BACKGROUND:
The Town is required to prepare an updated General Plan Housing Element for the period
covering 2014 -2022. The Housing Element must be certified by the State Housing Community
Development Department (HCD) and adopted by the Town Council no later than May 31, 2015.
To ensure this deadline is met, the goal is to submit the draft to the State for certification by
December 31, 2014. The updated Housing Element is required to show how the Town intends to
accommodate the housing needs of its residents and local businesses for the upcoming eight
years and will include policies to facilitate the planning for these units.
If the Town satisfies these requirements, another Housing Element update will not have to be
prepared until January 2023. If the certification and adoption deadlines are not met, the Town
will be required to prepare a certified Housing Element every four years. Local communities
without certified housing elements may be subject to lawsuits which may impede their ability to
approve /deny land use entitlements, issue building permits, or maintain eligibility for grants or
financing incentives.
Given the increased community interest in housing and development related topics, the Council
established a Housing Element Advisory Board on February 3, 2014, to assist with the
preparation of the upcoming Housing Element update and to provide recommendations that are
PREPARED BY: SANDY L. BAILY 6(,ej
Director of Community Development
Reviewed by: PS) Assistant Town Manager Town Attorney ance
N:\DEV\TC REP0RTS\20)4\P1acmorks Housing Element Rpt TC 3- 17- 2014.doc
PAGE
MAYOR AND TOWN COUNCIL
SUBJECT: HOUSING ELEMENT AGREEMENT
March 11, 2014
consistent with the community's values. On March 17, 2014, the Council is anticipated to
appoint four residents to the Housing Element Advisory Board to join the existing nine General
Plan Committee members that will constitute the full Board.
The Town intends to enter into an agreement with Placeworks, Inc., formerly The Planning
Center/DC &E to prepare the Housing Element Update, assist with the meeting facilitation of the
Housing Element Advisory Board and complete the required environmental review documents.
DISCUSSION:
A Request for Proposals (RFP) soliciting qualified firms to assist with the preparation of the
Housing Element update and the required environmental review documents was distributed by
staff in January 2014. A total of six highly qualified firms requested copies of the proposal in
order to be able to respond. Prior to the proposal submittal deadline on February 21, 2014, four
of the six firms (ESA, MIG, Baird & Driskell Community Planning, and Metropolitan Planning
Group) informed staff that they no longer had additional capacity to take on any new clients due
to their recent acceptance of Housing Element contracts with other local jurisdictions. A fifth
firm (Veronica Tam & Associates) did not submit a proposal and staff has not been able to
contact anyone at the firm.
Placeworks, Inc., the newly re- branded name of the former Planning Center/DC &E planning
consulting firm submitted the only proposal which addressed the full requirements of the Town's
RFP. Placeworks, Inc. has recent experience with the Town in preparing the 2010 General Plan
Update and Final EIR, the 2007 -2014 Housing Element Update and most recently the 2013
AHOZ environmental review document. The proposal from Placeworks, Inc. is to prepare the
Housing Element draft document, facilitate the Housing Element Advisory Board meeting
process, and prepare an Addendum to the 2010 General Plan FEIR for a fee of $136,826. If a
supplemental EIR is needed due to the selection of new AHOZ or Housing Opportunity sites this
optional task would be an additional cost of $35,000-45,000.
If approved by Council, the Consultant will assist staff in the facilitation of the Housing Element
Advisory Board. Staff anticipates that the Housing Element Advisory Board process will run
from March through June and will involve approximately eight meetings. The final work product
of the Advisory Board is expected to be a recommendation on specific strategies, concepts,
and/or policies for accommodating the Town's Regional Housing Needs Allocation (RHNA) of
619 housing units for the next 8 -year period. The Consultant will incorporate these
recommendations in the draft of the updated Housing Element.
Based on this rough timeline and depending on the level of environmental review required, it is
anticipated that the Planning Commission will be able to review the draft Housing Element in
September 2014 with possible Town Council action in October or November 2014. Submitting
the updated Housing Element by the end of 2014 should ensure meeting the State mandated May
2015 deadline, even if changes are required by HCD.
PAGE 3
MAYOR AND TOWN COUNCIL
SUBJECT: HOUSING ELEMENT AGREEMENT
March 11, 2014
CONCLUSION:
Staff has concluded that Placeworks, Inc. provides a good fit for the completion of Housing
Element Update. This firm has the experience and capacity to fully meet the Town's goals for
the update within the necessary time frame and has provided previous excellent contract service
with the Town.
ENVIRONMENTAL ASSESSMENT:
Approval of the Placeworks, Inc. contract and initiation of the Housing Element Update is not a
project as defined by CEQA. An environmental assessment will be conducted for the update and
will be presented to the Planning Commission and Town Council with the Draft Housing
Element.
FISCAL IMPACT:
Funding for the Housing Element Update will come from the General Plan Update Fund.
Sufficient funds are available in the FY 2013/14 adopted budget.
Attachments:
1. Resolution including Agreement & Scope of Work
SLB:EO:ct
THIS PAGE
INTENTIONALLY
LEFT BLANK
RESOLUTION 2014-
RESOLUTION OF THE TOWN COUNCIL
OF THE TOWN OF LOS GATOS
AUTHORIZING THE TOWN MANAGER TO ENTER INTO
AN AGREEMENT WITH PLACEWORKS, INC. TO PREPARE
THE HOUSING ELEMENT UPDATE AND
REQUIRED ENVIRONMENTAL REVIEW DOCUMENTS
WHEREAS, the Town of Los Gatos is required by the State Housing Laws to prepare an
update of its existing State Certified Housing Element in 2014; and
WHEREAS, the updated Housing Element must include plans and policies to show how
Los Gatos plans to accommodate the estimated housing needs of residents and business for the
next eight year period; and
WHEREAS, the Town intends to initiate its Housing Element update process in March
2014 and submit an adopted draft for certification to the State by December 31, 2014; and
WHEREAS, the Town desires to hire a professional planning consulting firm with the
prerequisite experience and technical expertise necessary to prepare the housing element update
and required environmental review documents; and
WHEREAS, the Placeworks, Inc. has the necessary experience and technical expertise for
this project; and
NOW, THEREFORE, BE IT RESOLVED, that Town Council of the Town of Los Gatos does
hereby authorize the Town Manager to enter into an agreement with Placeworks, Inc. to prepare
the housing element update and required environmental review documents subject to the
agreement and scope of work included as Exhibit A.
ATTACHMENT I
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los
Gatos, California, held on the 17th day of March, 2014, by the following vote:
COUNCIL MEMBERS:
AYES:
NAYS:
ABSENT:
ABSTAIN:
SIGNED:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
N:\ DEV \RESOS\2014 \RESO- AUTHORIZING TOWN MANAGER TO EXECUTE HOUSING ELEMENT CONSULTANT AGRMEENT.doex
EXHIBIT A: WORK SCOPE AND COSTS
This exhibit describes the scope of services, schedule, products and meetings for the
Housing Element Update to be conducted by PlaceWorks for the Town of Los Gatos in
cooperation with Kimley -Horn & Associates.
SCOPE OF SERVICES
Task A. Project Initiation
1. Kick -Off Meeting with Town Staff and Initial HCD Contact
PlaceWorks will attend a project initiation meeting with Town staff to discuss the work
program for the Housing Element Update. At this meeting we will review and refine the
proposed schedule, identify information needs, and discuss expectations for the process
and products.
We understand that Town staff has already made initial contact with HCD. During this
task, PlaceWorks will reach out to HCD to review the approach and schedule for the
Housing Element Update and confirm that review period timelines are acceptable to
HCD staff. PlaceWorks will discuss with HCD strategies to accommodate the Town's
identified housing need and other procedural and substantive issues related to the
Housing Element Update. By taking this proactive approach, we will ultimately be able
to submit a draft Housing Element to HCD that does not require extensive revisions that
could affect the project schedule.
2. Data Collection
PlaceWorks will conduct an initial review of the programs, guiding policies, and
implementing policies set forth in the current Housing Element. PlaceWorks will collect
and review housing programs, plans, reports and other policy documents needed to
prepare the Housing Element Update. Background information to be reviewed includes
the existing General Plan, the Zoning Regulations in the Town Code, and other
applicable policy documents as identified by Town staff. PlaceWorks will document
constraints on development of vacant and underutilized parcels.
3. Housing Element Advisory Board
Throughout the course of the project, PlaceWorks will facilitate the Housing Element
Advisory Board (the Advisory Board) meetings. The Advisory Board will be comprised
of members appointed by the Town Council. PlaceWorks will produce handouts and
presentation materials needed for the Advisory Board meetings.
PLACEWORKS 1
MARCH 5, 2014
TOWN OF Los GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
PlaceWorks will facilitate the following meetings with the Advisory Board
♦ Meeting #l: Introduction. PlaceWorks will facilitate the first Advisory Board
meeting to introduce Board members to the project and consultant team, discuss the
role of the Advisory Board in the Housing Element Update, review the project
schedule, and discuss goals and expectations for the process. We will also gather
initial comments from Advisory Board members on key issues and concerns for the
Housing Element Update. PlaceWorks' skilled facilitators will the content,
structure, and purpose of the Housing Element, and the requirements it must meet.
PlaceWorks will provide the Advisory Board with a description of the Advisory
Board's roles and responsibilities.
♦ Meetings #2 and #3: Housing Sites Inventory Review and Site Selection.
At Advisory Board Meeting #2, PlaceWorks will provide an overview of the town's
demographic and housing needs. The remainder of Meeting #2 and Meeting #3
will focus on the review and selection of housing sites to accommodate the town's
Regional Housing Needs Allocation (ANNA). The outcome of Meeting #3 will be
the selection of recommended housing sites to be approved by the Planning
Commission.
♦ Meetings #4 and #S: Housing Policies and Programs. PlaceWorks will
present policy alternatives to the Advisory Board for review and discussion. The
outcome of Meeting #5 will be the identification of draft policies and programs that
will be presented to the Planning Commission for approval.
♦ Meetings #6 and #7: Draft Housing Element Review. PlaceWorks will
present a Public Review Draft Housing Element to the Advisory Board at Meeting
#6 for review and comment. Meeting #7 will finalize comments and review of the
Draft Housing Element.
PlaceWorks is available to facilitate additional meetings at a cost of approximately $2,300
per meeting. The cost for PlaceWorks or Kimley -Horn & Associates to attend or
facilitate additional meetings will be billed on a time and materials basis.
4. Project Website
PlaceWorks will develop a project web page to be hosted on a dedicated URL,
hyperlinked to the Town's website.
PlaceWorks will develop and maintain the project website, which will serve as the
public's online source for all project- related materials, such as agendas, documents, and
meeting announcements.
PLACEWORKS 1 2
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
Task ll. Population and Housing Analysis
1. Evaluation of Existing Housing Element
Place Works will Conduct a thorough evaluation of the existing Housing Element. This
written evaluation is a required part of the technical appendix of the Housing Element
and will consider the appropriateness of existing guiding and implementing policies and
programs; the effectiveness of these policies and programs; and progress in
implementation.
2. Housing Needs Assessment
Place Works will prepare a housing needs assessment, which will focus on local
demographic and household characteristics that affect local housing demand. Housing
needs information in the Town's current Housing Element will be updated with new data
on population and employment, housing types and conditions, household characteristics,
housing costs, household income and ability to pay, special needs housing (including
persons with developmental disabilities, consistent with SB 812), and affordable housing
at risk of conversion to market rate uses.
3. Housing Constraints Analysis
Place Works will revise the discussion of governmental and non - governmental constraints
on housing production identified in the Town's current Housing Element. Examples of
governmental constraints include development standards in the Town Code, on- and off-
site improvement requirements, fees and exactions, and permit processing procedures.
Nongovernmental constraints include issues such as land prices, financing availability, and
construction. This task will include an analysis of Costs to develop housing in Los Gatos,
including estimated permit and land costs, site improvement Costs, hard and soft
construction costs, marketing costs, and required developer profit.
4. Housing Sites Inventory
a. Identification of Land Suitable for Residential Development
Place Works will prepare an inventory of land suitable for residential development. This
inventory will include undeveloped sites within the Town's Affordable Housing Overlay
Zone (AHOZ), sites containing existing single- family homes with the potential for senior
units, sites that may be developed under the North 40 Specific Plan, vacant sites zoned
for residential development or zoned to allow residential use, sites within the Town's
Multi- Family Residential Zone, and underutilized developed sites that are capable of
being redeveloped at a higher density or with greater intensity.
PLACEWORKS 3
MARCH 5, 2014
TOWN OF Los GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
This scope and cost are based on an assumption that the Town has adequate sites with
appropriate zoning to meet both the total RHNA and the RHNA for low- and very -low-
income units and that no rezonings will be necessary. if the land inventory analysis does
not demonstrate an adequate supply of suitable, available and appropriately zoned sites
that are sufficient to accommodate the Town's housing need by income level,
PlaceWorks will prepare a program recommendation to accommodate the remaining
housing need within the planning period. Strategies to increase total residential
development capacity include modifying zoning and development standards, encouraging
the redevelopment and reuse of non - vacant or underutilized sites, removing other
housing - production constraints, assisting in the development of housing, and conserving
existing housing stock.
b. Land Inventory Analysis
PlaceWorks will determine which sites identified in the inventory are available and
suitable to accommodate Los Gatos' projected housing need. This analysis will
determine the Town's ability to provide for a variety of housing types, including
multifamily rental, factory- built, mobile homes, housing for disabled persons, and
transitional housing and emergency shelters.
PlaceWorks will then establish the number of housing units that can potentially be
accommodated on each site. PlaceWorks will calculate the number of units that can
accommodate the Town's share of housing for lower- income households, and will
determine if existing land use controls allow for development of housing for lower -
income households. This scope and cost assume that we can reuse the same or similar
methodology for calculating buildout that was conducted for the Town's existing
Housing Element. PlaceWorks will evaluate the feasibility of redevelopment of
underutilized sites, considering factors such as the extent to which existing uses
constitute an impediment to additional residential development, recent development
trends, market conditions, and existing or proposed incentives.
Task C. Housing Policy Alternatives
1. Development of Housing Policy Alternatives
Based on the analysis of prior tasks, PlaceWorks will prepare housing policy alternatives
for the Housing Element Update. Policy alternatives will include:
♦ Programs to rehabilitate and conserve existing affordable housing.
♦ Programs to assist special -needs households,
PLACEWORKS 4
MARCH 5, 2014
TOWN OF Los GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
♦ Programs to accommodate persons with disabilities (including developmental
disabilities, consistent with SB 812).
♦ Other programs based on prior review in Task A.2, Data Collection.
Place Works will also identify sites to accommodate housing need.
2. Planning Commission Meeting #1: Housing Policy Alternatives
Place Works will present the policy and site alternatives to the Planning Commission and
will facilitate a discussion about the various options. This meeting will result in the
selection of a preferred approach to meet Housing Element requirements, especially
adequate sites for housing need. Place Works will assist Town staff in preparing the staff
report for the Planning Commission meeting.
Task D. Draft Housing Element Update
1. Policy and Program Revisions
Place Works will recommend revisions to existing housing policies and the addition of
new policies and programs where needed. Programs will identify agencies or officials
responsible for implementation and include specific time frames.
2. Administrative Draft Housing Element Update
Place Works will prepare an Administrative Draft Housing Element Update incorporating
the results of prior tasks. Ten hard copies and one electronic copy (PDF) of the
Administrative Draft Housing Element will be provided to the Town. The Town will be
responsible for providing a single set of internally reconciled comments on the
Administrative Draft Housing Element.
3. Public Review Draft Housing Element Update
After receiving comments on the Administrative Draft Housing Element, Place Works
will submit a revised, second draft to Town staff as an electronic "screencheck."
Place Works assumes that a minimal level of effort, not exceeding 4 hours, would be
required to respond to any Comment from the Town on the Screencheck Draft Housing
Element. Place Works will then prepare a Public Review Draft Housing Element Update.
We will prepare up to 30 hard copies and one electronic copy (PDF) of the Public
Review Draft Housing Element Update.
PLACEWORKS
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
4. Planning Commission Meeting, #2: Public Review Draft Housing
Element Update
PlaceWorks will prepare and present the Public Review Draft Housing Element for
review and comment by the Planning Commission. The meeting will be structured to
obtain agreement on the draft policies, programs and actions. PlaceWorks will assist
Town staff in preparing the staff report for the Planning Commission meeting.
After the meeting, PlaceWorks will consult with Town staff on comments received, and
will make one round of revisions to the Housing Element based on Planning Commission
Comments.
Task E. Addendum
In this task, PlaceWorks will conduct the environmental review for the Housing Element
Update. This task assumes that an Addendum to the General Plan EIR will be prepared,
that no new housing sites will be needed in order to accommodate the Town's RHNA,
and that buildout of the housing sites would not result in new growth above what was
analyzed in the Town's General Plan EIR.
If new sites are identified as part of the housing site inventory and selection process, a
Supplemental EIR will be prepared, as described in Task F below.
1. Project Description
PlaceWorks will prepare a detailed, but concise, project description using graphics and
textual information as appropriate. We will Coordinate with Town staff to gather the
information needed to clearly define the project. The project description will identify
the ways in which the housing sites, policies, programs, and buildout of the Housing
Element differ from the existing Housing Element and AHOZ, as applicable. The project
description will be submitted to the Town in an electronic (PDF) format. We will
conduct one round of revisions to the Project Description based on comments from
Town staff.
2. Addendum
PlaceWorks will prepare the Addendum, using information in the General Plan EIR and
AHOZ Addendum to the extent possible, that documents existing conditions, project
impacts (if any), and mitigation measures (if required), as well as the resulting level of
significance for potential impacts under each of the topical areas required under CEQA.
Although previous environmental analysis has been Conducted for development of the
PLACEWORKS 6
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
housing sites and buildout under the General Plan, the Addendum will need to evaluate
the distribution of the RHNA among the housing sites, as well as any policy or program
revisions that could affect the environment.
CEQA permits the exclusion of environmental issues on which it can be ascertained with
certainty that the project would have no significant negative impact. It is anticipated that
the following topic areas will be able to be summarily dismissed in the Addendum:
♦ Agricultural and Forestry Resources
♦ Mineral Resources
The Addendum will analyze the environmental impacts for the following resource
categories:
♦ Aesthetics. Development of the housing sites could affect the town's visual
resources. The Addendum will consider potential aesthetic impacts and include
mitigation measures, if required, to address any impacts.
♦ Air Quality. Place Works will prepare a qualitative air quality and a community
risk and hazards analysis for the Town of Los Gatos to support the Housing Element.
♦ Greenhouse Gas Emissions. Greenhouse gas (GHG) emissions impacts of the
project will be described qualitatively. The Addendum will include a consistency
evaluation with applicable goals and policies in the Metropolitan Transportation
Commission's /Association of Bay Area Governments' Plan Bar Area (the region's
Sustainable Communities Strategy) to reduce per capita GHG emissions from
passenger vehicle use because Plan Bay Area was adopted after certification of the
General Plan EIR.
♦ Biological and Cultural Resources. Development under the Housing Element
is not expected to adversely affect any biological or cultural resources. It is
expected that any potential impacts could be avoided through compliance with
applicable regulations.
♦ Geology, Soils, and Seismicity. Place Works will evaluate potential impacts
associated with soil erosion and geologic and seismic risks.
♦ Hazards and Hazardous Materials. Place Works will evaluate potential
impacts associated with hazards and hazardous materials. It is expected that any
potential impacts could be avoided through compliance with applicable regulations.
♦ land Use. Place Works will evaluate potential land use impacts.
PLACEWORKS %
MARCH 5.2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
♦ Noise. Because no new sites would be identified and the total amount of
development associated with the Housing Element would not exceed the total
amount of development analyzed in the General Plan EIR, an additional noise
analysis would not be necessary. Therefore, this scope does not include any noise
modeling.
♦ Population and Housing. PlaceWorks will evaluate potential impacts associated
with increased population and housing, or the displacement of existing housing units
or people.
♦ Public Services and Utilities. Because no new sites would be identified and the
total amount of development associated with the Housing Element would not
exceed the total amount of development analyzed in the General Plan EIR, impacts
to police, fire, water, wastewater, and stormwater services are not expected.
However, the Addendum will include a detailed schools analysis to determine
whether buildout under the Housing Element would affect any school districts
serving Los Gatos.
♦ Traffic and Transportation. Kimley -Hom will prepare the traffic and
transportation analysis for the Addendum. The traffic study will be based on the
following conditions: 2020 General Plan and 2020 General Plan plus 2014 Housing
Element. Kimley- Horn's work will involve the following tasks:
• Data Collection and Field Reconnaissance. Kimley -Horn will conduct intersection
turning movement counts for both the weekday AM peak period (7:00 AM to
9:00 AM) and PM peak period (4:00 PM to 6:00 PM) at up to eight (8)
intersections. These counts would supplement counts from recent projects, as
identified above in the data to be obtained from the Town. The criteria set forth
by the Valley Transportation Authority (VTA) is to prepare a transportation
impact analysis for projects that generate 100 or more peak hour trips. Kimley -
Horn will coordinate with Town staff on the selection of intersections for
evaluation, with intersections meeting the criteria set forth by VTA listed as high
priority. Field observations will be conducted at each of the study intersections
documenting field Conditions during the peak traffic period.
• Analysis. The Traffix model used for the analysis will be the same model used in
the latest 2013 AHOZ Update. The intersections included in this model included
all 39 intersections in the General Plan. There are assumed to be no additional
updates to the model. Kimley -Horn will conduct an initial assessment of each
potential Housing Element site's traffic impact. This task will involve developing
trip generation rates for up to eight (8) housing sites. Trip generation rates will
PLACEWORKS 8
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
be developed for the Daily, AM peak period, and PM peak period based on the
current edition of Trip Generation published by the Institute of Transportation
Engineers (ITE). The trip distribution for the proposed developments will be
determined from the adopted General Plan. All intersections will be evaluated
for levels of service (LOS) using the Operations Method from the 2000 Highway
Capacity Manual as applied by the TRAFFIX software program. There are
assumed to be no modifications to the model regarding signal timing changes or
background projects included (i.e. no change to the North 40 project).
Consistent with the previous Housing Element, the potential project trips will be
distributed and assigned in the Town of Los Gatos traffic network built for the
2020 General Plan model.
• Traffic Impact Analysis Report. Kimley -Horn will prepare a Traffic Impact Analysis
(TIA) report that will be attached to the Addendum as an appendix.
The Addendum format does not require consideration of alternatives, and we do not
propose to analyze any alternatives to the Housing Element Update.
3. Mitigation Monitoring and Reporting Program
Concurrent with the preparation of the Draft Addendum, we will prepare a Mitigation
Monitoring and Reporting Program (MMRP) for any mitigation measures included in the
Addendum pursuant to the Town's policies and procedures. The MMRP, shown in
tabular form, will identify responsible parties for implementing and monitoring each
mitigation measure, along with monitoring triggers and reporting frequencies.
4. Town Review and Revision
The Addendum will be submitted to Town staff for review, as follows:
♦ Administrative Draft Addendum and MMRP. Place Works will submit one
electronic copy and up to 10 hard copies of the Administrative Draft Addendum to
the Town for review. The MMRP will be submitted in electronic (Word and PDF)
format. The Town will provide Place Works with a single consolidated set of
comments on the report. This assumes that PlaceWorks will respond to one round
of comments on the Administrative Draft received from the Town. Please note that
our cost estimate includes an allowance of 24 hours for revisions to the
Administrative Draft Addendum after Town staff review.
♦ Screencheck Draft Addendum and MMRP. Place Works will submit a
revised, second draft to Town staff as an electronic "screencheck." Place Works
PLACEWORKS 9
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
assumes that a minimal level of effort, not exceeding 4 hours, would be required to
respond to any comment from the Town on the Screencheck Draft.
♦ Addendum and MMRP. PlaceWorks will provide the Town with one electronic
copy and up to 30 hard copies.
5. Public Review
Although not required for an Addendum, the Town has the option to circulate the
Addendum for public review. Our schedule allows two weeks for public review of the
Addendum.
Task F. Supplemental Environmental Impact Report OPTIONAL
If, during Task B.4 (Housing Sites Inventory), it is determined that additional sites will be
needed to accommodate the Town's RHNA, additional environmental analysis will be
required and a supplement to the General Plan EIR will be prepared. The EIR will be
prepared as defined by the CEQA Guidelines Section IS 163(c). The supplement to the
EIR will contain only the information necessary to make the previous EIR adequate for
the changes to the list of housing sites and the allowed development capacity under the
Housing Element Update. The Supplemental EIR will be prepared by PlaceWorks
through the tasks described below.
1. Notice of Preparation
Pursuant to CEQA Section 15163(c), a Supplemental EIR shall be given the same notice
and public review as a Draft EIR. Therefore, PlaceWorks will draft a Notice of
Preparation (NOP) of an EIR pursuant to CEQA Section 1 S082. We assume Town staff
will be responsible for circulation to the State Clearinghouse and local noticing. As
described below, the NOP will include an Initial Study (IS), which will scope out issues
that do not need to be addressed in the Supplemental EIR.
2. Project Description
PlaceWorks will prepare a detailed, but concise, project description using graphics and
textual information as appropriate. We will coordinate with Town staff to gather the
information needed to clearly define the project. The project description will identify
the ways in which the housing sites, policies, programs, and buildout of the Housing
Element differ from the existing Housing Element and AHOZ, as applicable. The project
description will be submitted to the Town in an electronic (PDF) format. We will
PLACEWORKS 10
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
conduct one round of revisions to the Project Description based on comments from
Town staff.
3. Initial Study
Place Works will prepare an Initial Study that documents existing conditions and project
impacts, using information in the General Plan EIR and AHOZ Addendum to the extent
possible. The Initial Study will be used to determine the environmental topics for which
a detailed analysis will be required in the Supplemental EIR. For those topics for which it
can easily be determined that a full analysis will be required in the Supplemental EIR, the
Initial Study discussion will be brief and refer to the forthcoming Supplemental EIR.
The Initial Study will be submitted to Town staff in an electronic (PDF) format. There
will be one round of Town staff review on the Initial Study.
4. Administrative Draft Supplemental EIR
The Administrative Draft Supplemental EIR (ADSEIR) will include revisions to the
chapters discussed below in order to reflect the Housing Element Update. Place Works
will submit 10 hard copies and one electronic copy of the ADSEIR for review by Town
departments. We assume that Town planning staff will act as a clearinghouse for
departmental comments and will provide Place Works with a single set of internally
consistent comments on the ADSEIR. Town staff will provide comments on the ADSEIR
within one and a half weeks.
The ADSEIR will contain the following sections:
a. Executive Summary
Place Works will create a summary in a form consistent with CEQA Guidelines, Section
15123. This summary will facilitate a quick understanding of environmental issues and
the actions required to mitigate potential impacts. It will include a summary table of
impacts, mitigation measures, and levels of significance before and after mitigation. The
summary table will include any mitigation measures recommended in the Initial Study.
b. Project Description
The ADSEIR will include the project description drafted for the project as part of Task
F.2, Project Description.
PLACEWORKS 11
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
c. Summary of Environmental Topics Seeped Out
The ADSEIR will include a chapter summarizing resource categories scoped out of the
Supplemental EIR (based on the findings of the Initial Study) and providing justification
and citations in support of this determination.
d. Setting, Impacts, and Mitigation Measures
For the environmental topics that will be fully evaluated in the Supplemental EIR, the
ADSEIR will contain existing setting information, impact analyses, and mitigation
measures. The determination of which environmental topics will be included in the
ADSEIR will be made based on the findings of the Initial Study. It is anticipated that the
Supplemental EIR will cover the following topics:
♦ Aesthetics. The Supplemental EIR will consider potential aesthetic impacts and
include mitigation measures, if required, to address any impacts.
♦ Air Quality. Place Works will prepare a qualitative air quality and a community
risk and hazards analysis. The "plan-level" analysis will be based on the Bay Area Air
Quality Management District (BAAQMD) CEQA Guidelines and will include a
qualitative analysis of criteria air pollutants generated from the proposed
redesignating and rezoning and the Housing Element sites and a qualitative
assessment of major stationary and mobile sources of toxic air contaminants (TACs)
and fine inhalable particulate matter (PM,,) within the Town.
• Criteria Air Pollutants. The program -level air quality analysis will include a
consistency evaluation of the project to the BAAQMD's land use and
transportation control measures within the air quality management plan. The San
Francisco Bay Area air basin is in non - attainment for particulate matter and for
ozone. Buildout of the Housing Element sites could generate emissions from an
increase in trips associated with new land uses compared to trips generated under
the current land use designations. The potential increase in trips generated by an
increase in development intensity will be discussed in relation to the projected
population and employment increase.
• Community Risk and Hazards. The community risk and hazards evaluation will
include a discussion of potential health risks from TACs and PM, in the vicinity
of any of the Housing Element sites based on BAAQMD's guidance. Existing
stationary sources, major roadways (defined by BAAQMD as over 10,000 vehicles
per day), and other sources of TACs will be mapped. Recommended measures
specified in the BAAQMD's Guidelines for future sensitive land uses within the
areas mapped will be considered and will be based on the recommended buffer
distances using BAAQMD screening tools, California Air Resources Board
PLACEWORKS 12
MARCH 5, 2014
TOWN OF LOS GATOS
H O U S I N G E L E M E N T U P D A T E
EXHIBIT A: SCOPE OF WORK AND COSTS
(CARB) guidance, and the California Air Pollution Control Officer's Association
(CAPCOA) guidance. For land uses within areas mapped as having elevated risk,
the Supplemental EIR will detail performance standards for future development
projects, including requirements to reduce risk from exposure to significant
concentrations of TACs and PM,,,
♦ Greenhouse Gas Emissions. PlaceWorks will prepare a GHG emissions analysis
based on the current BAAQMD methodology. GHG emissions impacts of the
project will be described qualitatively. The Town of L.os Gatos adopted a
Sustainability Plan to ensure consistency with statewide efforts to reduce GHG
emissions under Assembly Bill (AB) 32. Consequently, it is anticipated that future
projects in the town, including the proposed Housing Element Update, can tier off
the qualified Climate Action Plan (CAP) in accordance with CEQA Guidelines
Section 15183.5, Tiering and Streamlining the Analysis of Greenhouse Gas
Emissions. Therefore, a Consistency evaluation with applicable GHG reduction
measures in the Town's CAP will be conducted for the Housing Element Update.
Applicable GHG reduction measures will be specifically identified as mitigation
measures (i.e., similar to a development checklist) for future projects constructed in
accordance with the Housing Element. Furthermore, the Supplemental EIR will
also include a consistency evaluation with applicable goals and policies in the
Metropolitan Transportation Commission's /Association of Bay Area Governments'
Plan Bay Area (the region's Sustainable Communities Strategy) to reduce per capita
GHG emissions from passenger vehicle use.
♦ Noise. PlaceWorks will prepare a programmatic noise and vibration technical
analysis. The "plan - level" analysis will be based on an qualitative assessment of
major stationary and mobile noise sources at and around up to five housing units.
The noise and vibration analyses will evaluate the compatibility of the proposed land
uses and housing changes with respect to potential noise exposures and will discuss
applicable criteria, including ordinances, policies, and standards from the State of
California and the Los Gatos' Town Code and General Plan. The noise analyses will
discuss potential noise and vibration levels associated with the short -term demolition
of existing structures and the construction of the proposed residential developments.
The results of the technical analyses will be summarized in the Supplemental EIR.
Mitigation measures that reduce construction and /or operations noise and vibration
impacts will be identified, as necessary, and pertinent analysis details will be
provided in an Appendix. This scope of work assumes that project -level assessments
will be conducted when site - specific projects are defined and that these future
development efforts would include then- existing conditions noise measurements.
PLACEWORKS 13
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
Population and Housing. PlaceWorks will evaluate potential impacts associated
with increased population and housing, or the displacement of existing housing units
or people.
♦ Schools. PlaceWorks will conduct a detailed schools analysis to determine whether
buildout under the Housing Element would affect any school districts serving Los
Gatos.
Transportation and Traffic. If substantially new housing sites are requested for
evaluation, an additional evaluation of the VTA County -wide model will be
required. The 2020 General Plan EIR traffic evaluation was based on a significant
and detailed evaluation of individual Traffic Analysis Zones (TAZ's) where Housing
Element and other General Plan land uses were augmented in the model to reflect
the General Plan land use forecast. The County -wide model evaluates interactions
between TAZs throughout the county, looking at primary housing, employment,
retail, educational and other land uses and how people travel between each of these
uses. This effort was Completed in 2008. Since 2008, the Housing Element Update
and AHOZ efforts have been "layered" onto the results of this model through adding
new approved and pending developments in Los Gatos and removing projected or
cancelled developments foreseen in the 2020 General Plan development process. If
substantially new Housing Element parcels or opportunities are identified, it could
change the TAZ interactions assumed in the 2008 model run. If a Supplemental EIR
is required, a new model run will be required as well to capture network changes
outside Town limits and create a defensible traffic evaluation.
e. Alternatives
PlaceWorks will update the alternatives analysis based on the Housing Element Update.
As part of this task, PlaceWorks will evaluate the three alternatives from the original
General Plan EIR against the Housing Element Update.
f CEQA Required Assessment Conclusions
PlaceWorks will prepare assessment Conclusions to meet CEQA Guidelines for the
following mandatory findings:
• Cumulative Impacts
• Growth Inducement
♦ Unavoidable Significant Effects
♦ Significant Irreversible Changes
♦ Impacts Found Not to be Significant
PLACE WORKS 14
MARCH 5, 2014
TOWN OF LOS GATOS
H O U S I N G E L E M E N T U P D A T E
EXHIBIT A: SCOPE OF WORK AND COSTS
g. Report Preparers
This chapter will identify the consultants and staff who prepared the Supplemental EIR.
PlaceWorks will submit 10 hard copies and one electronic copy of the ADSEIR to Town
staff. Town staff will act as a clearinghouse for comments on the ADSEIR, and will
provide PlaceWorks with a single, internally reconciled set of comments. Please note
that our cost estimate includes an allowance of 24 hours for revisions to the ADSEIR after
Town staff review. PlaceWorks will incorporate Town comments on the ADSEIR and
deliver a Screencheck Draft Supplemental EIR for review by Town staff. We assume that
revisions to the Screencheck Draft Supplemental EIR will focus on formatting and
editing, not content changes. Our cost estimate includes an allowance of 4 hours for
revisions to the Screencheck Draft Supplemental EIR after Town staff review.
S. Draft Supplemental EIR and Public Review
PlaceWorks will incorporate one consolidated set of comments on the Screencheck Draft
Supplemental EIR from Town staff to create the Draft Supplemental EIR. PlaceWorks
will submit 30 hard copies and an electronic (PDF) format of Draft Supplemental EIR.
PlaceWorks will also prepare the Notice of Completion (NOC) and submit it to Town
staff. We assume the Town will be responsible for delivery of the Draft Supplemental
EIR and NOC to the State Clearinghouse and the requisite number of hardcopies and
CDs. We also assume the Town will prepare and publish the Notice of Availability.
A 45 -day public review period will be required under CEQA. During this period,
PlaceWorks will attend one hearing to present the conclusions of the Draft Supplemental
EIR and receive comments on it. PlaceWorks will assist Town staff in preparing the staff
report for the hearing.
6. Administrative Draft Response to Comments
The PlaceWorks team will prepare an Administrative Draft Response to Comments. We
assume that Town staff will forward public comments within five working days of the
close of the public review period. The PlaceWorks team expects to work closely with
the Town during preparation of the Administrative Draft Response to Comments to
ensure accuracy of the responses and provision of new information. PlaceWorks has
assumed 32 hours of staff labor for completion of the Administrative Draft Response to
Comments, and Kimley -Horn has assumed 16 hours for senior staff time. If additional
time is needed due to an unforeseen volume of comments, we will request a Contract
modification to cover additional labor costs. Five hard copies and an electronic (PDF)
format of the Administrative Draft Response to Comments will be submitted to Town
staff for review.
PLACEWORKS is
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EKH18fT A: SCOPE OF WORK AND COSTS
7. Final Supplemental EIR
Following receipt of one consolidated set of Town comments on the Administrative Draft
Response to Comments, a Final Supplemental EIR will be prepared. This will include
both the Response to Comments document and additional analysis or revisions to the
Draft Supplemental EIR as necessary, together with Findings of Fact and Statement of
Overriding Considerations, if required. Place Works will submit a Screencheck Draft of
the Final Supplemental EIR for review by Town staff. Subsequent to receipt of comments
on the Screencheck Draft, we will submit IS hard copies and an electronic (PDF) format,
one reproducible hard copy of the Final Supplemental EIR with Responses to Comments,
and one copy in electronic (Adobe Acrobat) format. We will also prepare the NOC for
the EIR.
S. Mitigation Monitoring and Reporting Program
Concurrent with the preparation of the Final Supplemental EIR, we will prepare a
Mitigation Monitoring and Reporting Program (MMRP) for the mitigation measures
included in the Supplemental EIR pursuant to the Town's policies and procedures. The
MMRP, shown in tabular form, will identify responsible parties for implementing and
monitoring each mitigation measure, along with monitoring triggers and reporting
frequencies. The MMRP will be submitted electronically.
Task G. HCD Review and Final Housing Element
1. Submittal to HCD
Following public and Planning Commission review of the Public Review Draft Housing
Element, P1aceWorks will submit a revised Draft Housing Element to HCD for
certification. Place Works will use HCD's streamlined update template to facilitate a
streamlined review of the Draft Housing Element. It is our understanding that, based on
initial conversations between Town staff and HCD, HCD will be able to review the Draft
Housing Element on an accelerated timeline. Our schedule assumes a 30 -day review
period for the Draft Housing Element.
2. Planning Commission Meeting #3: Review of HCD Comments
Place Works will present HCD comments and recommended revisions on the revised
Draft Housing Element to the Planning Commission. After the initial presentation,
PlaceWorks will facilitate a discussion about responding to HCD comments. The desired
outcome of the meeting is to obtain agreement on revisions in response to HCD
comments.
PLACEWORKS 16
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
3. Draft Final Housing Element
After HCD review and Planning Commission Meeting #3, PlaceWorks will be
responsible for making revisions to the revised Draft Housing Element to address HCD
comments and Planning Commission direction. We will provide a memorandum
summarizing the revisions made to the Draft Housing Element Update, as well as a
redline version of the revised Housing Element. The memorandum and redline version
will be submitted electronically.
4. Informal Consultation with HCD
PlaceWorks will submit relevant, revised portions of the revised Draft Housing Element
to HCD to receive informal comments on whether the proposed revisions will meet
HCD certification requirements. We do not propose to submit a complete second
revised draft document. The budget assumes one round of revisions for HCD, resulting
in the Final Housing Element.
S. Final Housing Element
Following HCD response to our consultation on revisions, PlaceWorks will submit an
Administrative Draft Final Housing Element to Town staff. This scope and cost assume
that by this point in the process, any final changes needed would be extremely minor.
Extensive changes could affect the schedule and trigger a request for a contract
amendment. The Town will be responsible for providing a single set of internally
reconciled comments on the Administrative Draft Final Housing Element. PlaceWorks
will revise to create the Final Housing Element. We will provide 30 hard copies and an
electronic copy of the Final Housing Element.
6. Adoption and Certification Hearings
PlaceWorks will attend up to two adoption hearings with the Planning Commission
and /or Town Council. PlaceWorks will assist Town staff in preparing the staff reports
for the hearings. Following Town Council adoption of the Final Housing Element
PlaceWorks will submit the Final Housing Element as adopted by the Town Council for
certification by HCD.
Within five days of project approval, PlaceWorks will prepare a Notice of Determination
(NOD) for submittal to the State Clearinghouse and County clerk. The budget does not
include payment of any filing fees.
We will provide I S hard copies of the adopted Housing Element to the Town.
PLACEWORKS 17
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
7. HCD Certification
Following Town Council adoption of the Final Housing Element, PlaceWorks will submit
the adopted Final Housing Element to HCD for certification. Our schedule assumes an
accelerated, 15 -day review period for the Final Housing Element.
Il. SCHEDULE, PRODUCTS, AND MEETINGS
A. Schedule
Place Works' proposed schedule for Completion of the Housing Element Update is shown
in Figure 1. As shown in the schedule, we anticipate that the project can be completed
by December 31, 2014. In order to meet this schedule, it should be noted that Town
review times of interim draft documents are limited to one to two weeks. This schedule
assumes that an Addendum will be prepared for the Housing Element Update.
Preparation of a Supplemental EIR would require a revised schedule.
PLACEWORKS 18
MARCH S, 2014
TOWN OF LOS GATOS
H O U S I N G E L E M E N T U P D A T E
EXHIBIT A: SCOPE OF WORK AND COSTS
FIGURE 1 SCHEDULE
' . a • I . I
••:• I... •r• .:I . ;: ,. Our• 11111111 1111111111111111111111111111111
.:.r . :.I. 1111111111111111111111111111111111111111
= �• • 111G II��IIGGIG�1111111111111111111111111
• •I '•: •'• 1111111111111111111111111111111111111111
• •• :1
Al ::I . J • •. . • dl
v 5. •
• : r
•.I
•� :I rl•
PLACEWDRKS
IIIIIIIIIIIIIIIIIICIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIIIIGIIIIIIIIIIIIIIIIII
1 •V •- A 10 •
19
MARCH 6, 2014
THIS PAGE
INTENTIONALLY
LEFT BLANK
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
C. Meetings
Joanna Jansen, Principal -in- Charge, will attend the following meetings for the Housing
Element Update:
♦ Kick -Off Meeting
♦ Planning Commission Meeting #2
♦ Adoption Hearings (2)
David Early, Lead Facilitator, will attend and facilitate all Housing Element Advisory
Board meetings (7 meetings).
Mark Hoffman, Housing Manager, will attend the following meetings for the Housing
Element Update:
♦ Kick -Off Meeting
♦ Planning Commission Meeting #1
♦ Planning Commission Meeting #3
Ill. COSTS
As shown in Table 1, the cost to complete the scope of work described in this proposal is
$136,826. It should be noted that this cost includes $28,510 in traffic counts and other
analysis for the Addendum. This cost reflects our previous experience with both staff and
Community expectations for traffic analysis in Los Gatos, but we are happy to discuss in
further detail with staff to refine this approach.
If it becomes clear that a Supplemental EIR will be necessary before work has begun on
an Addendum, the total additional cost would be $3S,000 to $45,000.
Place Works recommends planning for a 5 percent to 10 percent contingency fund to
cover any unforeseen out -of -scope work that might be necessary for the project.
The billing rates for each team member are included in Table 1.
Place Works bills for its work on a time - and - materials basis with monthly invoices.
PLACEWORKS
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
A. Assumptions
This scope of work and cost estimate assumes that:
♦ The Addendum will not analyze any new housing sites, rezonings, redesignations, or
buildout above what was analyzed in the General Plan EIR.
♦ Any new housing sites, rezonings, redesignations, or buildout will be analyzed in a
Supplemental EIR, as described in Optional Task F. The Supplemental EIR analysis
will cover up to five housing sites. Any additional housing sites will require a
contract amendment.
♦ The Town will be eligible for HCD's streamlined procedures. As described in our
scope of work, our schedule assumes an abbreviated review period for HCD of 30
days for the Draft Housing Element and 15 days for the Final Housing Element.
♦ PlaceWorks will facilitate seven meetings with the Housing Element Advisory
Board. Any additional meetings will require a contract amendment and will be billed
on a time and materials basis.
♦ Billing rates for this project are guaranteed through June 2015. Billing rates would
be subject to an increase of up to 6 percent on July 1, 2015, and in each subsequent
year thereafter. A budget increase would be necessary to cover costs incurred after
July 1, 2015.
♦ Our cost estimate includes the meetings described in Section 11. Additional meetings
would be billed on a time- and - materials basis. Joanna Jansen will attend all project
meetings, public workshops, and other public meetings. David Early will facilitate
all Housing Element Advisory Board meetings. Each project meeting will last up to
two hours. Subconsultant team members could also attend additional meetings or
hearings for an additional cost based on time and materials.
♦ All products will be submitted to the Town of Los Gatos in electronic (PDF)
format, except for printed copies that are specifically identified in our scope of
work. Our printing allowance is shown in Table 1. This is an allowance only, based
on the numbers of products and copies shown in out scope of work. If this allowance
is exceeded, additional printing costs will be billed at Place Works' actual cost.
♦ Town of Los Gatos staff will be responsible for meeting logistics, including schedule
coordination, printing notices, mailing costs, room reservations, room set -up and
take -down, and refreshments.
PLACEWORKS
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING. ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
♦ Place Works will send an invoice for work completed each month. The invoice will
show hours worked by labor Category, billing rate, and total by labor category plus
subconsultants and reimbursable expenses. Special invoicing requirements may
necessitate an additional fee.
♦ Town of Los Gatos staff will act as a clearinghouse for comments on all
administrative draft documents, and will provide PlaceWorkswith a single,
internally reconciled set of comments on each administrative draft.
♦ There will be a single round of intensive review and revision to each administrative
draft product prior to the screencheck draft. If Town of Los Gatos staff feels that a
second administrative draft is needed, a contract amendment allowing additional
work will be necessary.
♦ Revisions to screencheck drafts will focus on typographical errors, formatting and
other minor edits. Such revisions will not include content changes.
♦ Multiple changes from Town of Los Gatos about how to proceed, including on the
sites inventory, will require a contract amendment to allow Completion of the
additional work.
♦ Place Works will use Microsoft Word and /or Adobe InDesign for page layout of
reports, plans and similar documents. Additional software such as Adobe Illustrator,
Adobe PhotoShop, ArcGIS and AutoCAD will be used to Create illustrations, maps,
diagrams and other graphics.
♦ Place Works will produce handouts and presentation materials needed for the
Advisory Board meetings. The Planning Center I DC &E will not be responsible for
designing or distributing notices for public meetings.
PLACEWORKS
MARCH 5, 2014
TOWN OF LOS GATOS
HOUSING ELEMENT UPDATE
EXHIBIT A: SCOPE OF WORK AND COSTS
This page intentional]y left blank.
PLACEWORKS
MARCH 5, 2014
W
�fo
o,
a
0
$�6 O i b i
'm$p go 0
R 4'�
u, $
H•R
C a C �'�
m^ mix me g8m mry�p maen�np�ma�,.m.mmor 'N OIX
Tn
g.aq�'y�mmmseaa�ma m <��rammr'�rvamam «� '�F'�i
�ipmq
rb
qqF
a4'7Fmtl�ffitltlSBtlarctlmm sadsaao
�R
F
THIS PAGE
INTENTIONALLY
LEFT BLANK