Loading...
Albright 5-20-13Slide 1 ALBRIGHT OFFICE PARK Planned Development PD-12-001 Architecture and Site S-12-078 Environmental Impact Report EIR-12-003 Planned Development The new PD establishes: Permitted uses Maximum square footage Maximum height Minimum setbacks Minimum parking requirements; and Maximum lot coverage Additional site improvements Architecture and Site Combined with PD application Consistent with PD EIR Draft EIR was prepared Final EIR was prepared Mitigation measures Planning Commission Considered on April 24, 2013 Recommended denial: - Not within the spirit of a PD - Not compatible with the varied uses - The intensity of use - Traffic - Reduced alternative Applicant Revisions Building 3 rotated The balcony on the 4 th floor eliminatedAdditional landscaping between Charter Oaks Building 3 and 4 Additional landscaping and screen panels between Charter Oaks and parking garage Trash enclosures relocated Mechanical equipment relocated Sunshade reduced from 60 ft. to 54 ft. 6 in. Bike racks Parking garage screening deciduous to evergreen Community Benefit $550,000 for traffic improvements Dirt for trail improvements Topics Height Mass and ScaleNeighborhood compatibilityCommunity BenefitPhasing Freeway signs Commercial Design Guidelines andGuidelines and Standards for Land Use Near StreamsGeneral Plan Actions (Denial) After opening and closing the public hearing, and asking the Clerk to read the title of the zoning ordinance, the TC may: 1. Accept the report of the Planning Commission’s recommendations in the form of meeting minutes (Attachment 7) (no motion required). 2. Accept the Planning Commission’s recommendation and move to deny the Planned Development application. Actions (Approval) If the Town Council decides to approve and/or modify the proposed project, the Town Council may: 1. Accept the report of the Planning Commission’s recommendations in the form of meeting minutes (Attachment 7) (no motion required). 2. Adopt the CEQA Findings of Fact (Exhibit 5 of Attachment 4), certify of the Environmental Impact Report (Attachments 1 and 2) including the Errata sheets (Attachment 10), adopt the Mitigation Monitoring and Reporting Program (Attachment 3), and adopt the Resolution certifying the environmental document (Attachment 11) (motion required). 3. Make the required findings supporting the zone change (Exhibit 6 of Attachment 4) and approve the Planned Development application subject to the performance standards and development plans included in the Planned Development Ordinance (Exhibit 13 of Attachment 4), or as otherwise modified by the Town Council (motion required). Actions (Approval) (Cont.) 4. Move to waive the reading of the zone change Ordinance (motion required). 5. Move to introduce the Ordinance to effectuate the zone change (motion required). 6. Make the required findings for approval of the Architecture and Site application (Exhibit 7 of Attachment 4) and approve the Architecture and Site application subject to the Conditions of Approval (Exhibit 8 of Attachment 4) and development plans (Exhibit 14 of Attachment 4), or as otherwise modified by the Town Council (motion required). Actions AlternativesAlternatively, the Council can:   1. Continue the project to a date certain with specific direction (motion required); or 2. Remand the project to the Planning Commission with specific direction (motion required). * Maximum height of the parking structure is 35 ’. Optional solar panel installation would bring the maximum height to 49’.  Town Code Existing Development Proposed PD Proposed A&S Maximum Height: Office/R&D Buildings Parking Structure   35 ft. 35 ft.   32 ft. NA   65 ft. 49 ft.*   65 ft. 49 ft.* Minimum Setbacks: Winchester Blvd. (Front)   Highway 85 (Side) Creek Trail (Rear) Charter Oaks (South) (Side) (East) (Rear)       SCCFD (Side)   25 ft. plus 1 ft. for every 1 ft. of building height over 20 ft. 25 ft. 0 ft. 25 ft. 0 ft. except when adjacent to residential where 20 ft. plus 1 ft. for every 1 ft. of building height over 20 ft. is required 25 ft.   10 ft.   34 ft. 37 ft. 14 ft. 60 ft.       34 ft.   70 ft.   25 ft. 0 ft. 25 ft. 65 ft.       25 ft.   101 ft.   53 ft. 207 ft. 89 ft. 116 ft.       191 ft. Maximum Building Coverage 50% 30% 50% 23% Minimum Parking 1 per 235 sq. ft. 2,341 spaces 1 per 329 sq. ft. 763 spaces 1 per 303 sq. ft. 1,815 spaces 1 per 285 sq. ft. 1,925 spaces Maximum Square Footage NA 251,196 sq. ft. 550,000 sq. ft. 550,000 sq. ft .