10 - Park ImprovementsPARKS AND TRAILS PROGRAM D-1 PARK PROJECT DIRECTORY 3403 Blossom Hill Park Pathway Improvements D – 6 4403 Pedestrian Bridge to Sports Park D – 8 4607 Town Park Lighting Project D –10 4004 Oak Meadow Park Upgrades D –12 4603 Tree Trimming -Various Town Parks D –14 4606 Parks Reservation System Replacement D –16 4604 Parks Restroom Partition Upgrade D - 18 4605 Parks Playground Fibar Project D - 20 3404 Blossom Hill Park Upgrades D - 22 TRAIL PROJECT DIRECTORY 4503 Los Gatos Creek Trail Reconstruction - Charter Oaks D –28 4504 Open Space Trail Upgrades D - 30 4505 Highway 9 Pathway Connection to Los Gatos Creek Trail D - 32 PARKS AND TRAILS PROGRAM Park Improvement Projects D-2 PARKS AND TRAILS PROGRAM Park Improvement Projects D-3 LOS GATOS-SARATOGA RDLOS GATOS BLVD E M AIN ST HWY 17 HWY 17 N SANTA CRUZ AV WINCHESTER BLVD BLOSSOM HILL RD LOS GATOS BLVD HWY 85 KENNEDY RDSHANNON RD LARK AV LOS GATOS-ALMADEN RD UNIVERSITY AV WEDGEWOOD KNOWLES B C D E, F, G & H ARE TOWN-WIDE PROJECTS A, I PROJECT LOCATIONS A Blossom Hill Park Pathway Improvements B Pedestrian Bridge to Sports Park C Town Park Lighting Project D Oak Meadow Park Upgrades E Tree Trimming - Various Town Parks F Parks Reservation System Replacement G Parks Restroom Partition Upgrades H Parks Playground Fibar Project I Blossom Hill Park Upgrades PARKS & TRAILS PROGRAM Park Improvement Projects D-4 PROGRAM SECTION DIRECTORY PAGE 3403 Blossom Hill Park Pathway Improvements D – 6 4403 Pedestrian Bridge to Sports Park D – 8 3803 Town Park Lighting Project D –10 4004 Oak Meadow Park Upgrades D –12 4603 Tree Trimming -Various Town Parks D –14 4606 Parks Reservation System Replacement D –16 4604 Parks Restroom Partition Upgrade D - 18 4605 Parks Playground Fibar Project D - 20 3404 Blossom Hill Park Upgrades D - 22 PARKS & TRAILS PROGRAM Park Improvement Projects D-5 The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and basketball or tennis court resurfacing; and park equipment or facility upgrades. The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. One- time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. State park bond funds made available in 2000 and 2002 have funded many park projects in Los Gatos; however, these funds are not ongoing. Los Gatos does have a Park Construction Tax Revenue as a designated funding source for the Parks operating program budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available. PARK IMPROVEMENT PROJECTS SUMMARY PARKS Carryforward Projects- New Projects 3403Blossom Hill Park Pathway Improvements - 246,357 52,000 - - - 298,357 4004Oak Meadow Park Upgrades- - 250,000 - - - 250,000 4403Pedestrian Bridge to Sports Park- 350,000 450,000 - - - 800,000 4603Tree Trimming - Various Town Parks- 100,000 - - - - 100,000 4604Parks Restroom Partition Upgrades- 55,000 - - - - 55,000 4605Parks Playground Fibar Project- 25,000 25,000 25,000 25,000 25,000 125,000 4606Parks Reservation System Replacement- 25,000 - - - - 25,000 4607Town Park Lighting Project- 150,000 - - - - 150,000 3404Blossom Hill Park Upgrades- - 30,000 - - - 30,000 Total Park Improvement Projects- 951,357 807,000 25,000 25,000 25,000 1,833,357 Total Budgeted 2016/17 Budget Expended Through 2012/13 2017/18 Budget 2013/14 Budget & Carryfwd* 2014/15 Budget 2015/16 Budget * Total FY 2012/13 Carryforward $59,488 Unfunded Projects  Civic Center Irrigation System Replacement & Upgrade  Turf Renovations, various parks  Oak Meadow Park Fencing Upgrades  Live Oak Manor New Security Lighting  Oak Meadow Park Turf Upgrades  Oak Meadow Park Restroom Expansion PARKS & TRAILS PROGRAM Park Improvement Projects D-6 LOS GATOS BLVD BLOSSOM KENNEDY RD SHANNON RDBlossom Hill Park HILL RD Project Name Blossom Hill Park Pathway Improvements Project Number 831-3403 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will widen and improve the existing pathway at Blossom Hill Park. Location This project is located at Blossom Hill Park, which is at 16300 Blossom Hill Road. Project Background Blossom Hill Park is one of the most heavily used parks in Town. In FY 2012/13, the Town completed the Blossom Hill Road Improvements (Cherry Blossom Lane/Camino del Cerro) project, in conjunction with the State’s Safe Routes to School grant. This project included the installation of new sidewalk and bike pathways along Blossom Hill Road. As part of the project, frontage improvements to Blossom Hill Park were completed, which included a parking lot with enhanced sidewalk access points to the park. Additional updates to the asphalt pathway between Shannon Road and Hillbrook Drive are being proposed. This project will install new catch basins around the playground area to reduce the risk of flooding along the pathway, and expand the existing asphalt pathway from 4’ to 8’ wide from the Shannon Road parking lot to the playground area. This will improve access for people with physical disabilities and provide a class I pedestrian and bicycle connection between Blossom Hill and Shannon Roads. Additionally, the project will include repairing and widening sections of the pathway from Hillbrook Drive to the restroom/concession facility. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. PARKS & TRAILS PROGRAM Park Improvement Projects D-7 Project Components & Estimated Timeline Fall 2013 Design Project design & development Spring 2014 Bid Process Project bidding & contract award Winter 2014 Construction Project construction Spring 2015 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 89,000 - - - - 89,000 GRANTS & AWARDS- - 157,357 52,000 - - - 209,357 TOTAL SOURCE OF FUNDS- - 246,357 52,000 - - - 298,357 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GRANTS &AWARDS Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 246,357 52,000 - - - 298,357 TOTAL GRANTS &AWARDS- - 246,357 52,000 - - - 298,357 TOTAL USE OF FUNDS- - 246,357 52,000 - - - 298,357 *Total FY 2012/13 Carryforward59,488$ BLOSSOM HILL PARK PATHWAY IMPROVEMENTSProject 831-3403 PARKS & TRAILS PROGRAM Park Improvement Projects D-8 HWY 17 WINCHESTER BLVDLOS GATOS BLVD HWY 85 LARK AV UNIVERSITY AV 930 UNIVERSITY AVE Project Name Pedestrian Bridge to Sports Park Project Number 831-4403 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will construct a pedestrian bridge from Los Gatos Creek Trail to the Creekside Sports Park site, if approved by the Town Council following public and environmental review. Location The project is located at 930 University Avenue. Project Background The construction of the Creekside Sports Park was completed in fall 2012 and this facility has been in service by the community, with increasing demand for its usage. The original Creekside Sports Park concept included a bridge that would provide a connection for pedestrians and bicyclists from the Los Gatos Creek Trail to the Creekside Sports Park, across the Los Gatos Creek. During the design process, it was decided to proceed with the design and construction of the Creekside Sports Park, and the bridge alignment would be studied separately in terms of alternative alignments, funding, etc. This project will evaluate alignment alternatives for this bridge and a potential connection to University Avenue and explore the possibilities of creating a pathway close to Vasona Lake, along University Avenue, that would create loop around the lake and by the Creekside Sports Park. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for the first phase of this project is included in the department’s FY 2013/14 Operating Budget PARKS & TRAILS PROGRAM Park Improvement Projects D-9 Project Components & Estimated Timeline Spring 2014 Design/Development Project design & development Fall 2014 Bid process Project bidding & contract award Spring 2015 Construction Project construction Winter 2015 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 50,000 450,000 - - - 500,000 GRANTS & AWARDS- - 300,000 - - - - 300,000 TOTAL SOURCE OF FUNDS- - 350,000 450,000 - - - 800,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 50,000 450,000 - - - 500,000 TOTAL GFAR- - 50,000 450,000 - - - 500,000 GRANTS & AWARDS Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 300,000 - - - - 300,000 TOTAL GRANTS & AWARDS- - 300,000 - - - - 300,000 TOTAL USE OF FUNDS- - 350,000 450,000 - - - 800,000 *Total FY 2012/13 Carryforward-$ PEDESTRIAN BRIDGE TO SPORTS PARKProject 831-4403 PARKS & TRAILS PROGRAM Park Improvement Projects D-10 Project Name Town Park Lighting Project Project Number 831-4607 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will install new outdoor lighting in three Town parks - Blossom Hill Park, Howe’s Play Lot and Live Oak Manor Park. Location This project is located at Blossom Hill Park, Howe’s Play Lot and Live Oak Manor Park. Project Background Blossom Hill Park, Howe’s Play Lot and Live Oak Manor Park received improvements in FY 2012/13. The gravel pathway at Live Oak Manor Park was re-paved with asphalt to improve accessibility issues. Blossom Hill Park received frontage improvements which included a dedicated parking lot; and the concrete pathway at Howe’s Play Lot was replaced, enhancing accessibility issues. This project will replace the existing pathway lighting systems at the three above parks. The existing lighting systems are part of the original electrical infrastructure and are approximately 40 years old. A number of the light pole standards are rusting at the base and foundation, and electrical wiring continues to fail due to deterioration and age. This project will install new LED lighting components, including foundation and wiring, so that the new park pathways will have sufficient energy efficient lighting. Operating Budget Impacts Staff time for design and oversight of this project is addressed in the FY 2013/14 Operating Budget. PARKS & TRAILS PROGRAM Park Improvement Projects D-11 Project Components & Estimated Timeline Fall 2013 Design Project design & development Winter 2013 Bid Process Project bidding & contract award Spring 2014 Construction Project construction Fall 2014 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 150,000 - - - - 150,000 TOTAL SOURCE OF FUNDS- - 150,000 - - - - 150,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - Services/Supplies/Equipment- - - - - - - Site Acquisition & Preparation- - - - - - - Consultant Services- - - - - - - Project Construction Expenses- - 150,000 - - - - 150,000 TOTAL GFAR- - - - - - 150,000 TOTAL USE OF FUNDS- - 150,000 - - - - 150,000 *Total FY 2012/13 Carryforward-$ TOWN PARK LIGHTING PROJECTProject 831-4607 PARKS & TRAILS PROGRAM Park Improvement Projects D-12 LOS GATOS BLVDHWY 17N SANTA CRUZ AVUNIVERSITY AV Oak Meadow Park BLOSSOM HILL RD Project Name Oak Meadow Park Upgrades Project Number 831-4004 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project repairs and replaces the irrigation system, installs new sod, and new section of concrete pathway. Location The project is located at Oak Meadow Park, which is at 233 Blossom Hill Road. Project Background Oak Meadow park is the most highly utilized park in Los Gatos. Due to its location, size and wide range of recreational opportunities, it is utilized by many individuals and organized groups. There have been numerous improvement projects at Oak Meadow Park over the past several years in an effort to enhance the park’s aesthetics and improve its usability. The improvements have included construction of an asphalt pathway around the turf area, sidewalk, parking lot repairs, and renovations of picnic areas #1 and #2. Continuing with the improvements, this project will replace an aging turf irrigation system to include the replacement of the existing turf area, in addition to adding landscape in the parking lot median islands. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project will be included in the department’s FY 2014/15 Operating Budget. PARKS & TRAILS PROGRAM Park Improvement Projects D-13 Project Components & Estimated Timeline Spring 2014 Design Project design & development Fall 2014 Bid Process Project bidding & contract award Winter 2015 Construction Project construction Summer 2015 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - - 250,000 - - - 250,000 TOTAL GFAR- - - 250,000 - - - 250,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - - 250,000 - - - 250,000 TOTAL GFAR- - - 250,000 - - - 250,000 TOTAL USE OF FUNDS- - - 250,000 - - - 250,000 *Total FY 2012/13 Carryforward-$ OAK MEADOW PARK UPGRADESProject 831-4004 PARKS & TRAILS PROGRAM Park Improvement Projects D-14 Project Name Tree Trimming - Various Town Parks Project Number 831-4603 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will provide funding for contractual tree trimming work at various Town parks. Location This project is located at various parks in Los Gatos. Project Background The Town has performed tree trimming activities at various park locations near playgrounds in an effort to reduce failing limbs and decrease public liability as part of the annual street tree trimming contract. A number of parks require major tree trimming to existing trees located in the turf areas and adjacent to residential properties. This project will improve the overall structure of existing trees, and assist with the identification of deceased or failing trees that require removal. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. TOWN-WIDE PARKS & TRAILS PROGRAM Park Improvement Projects D-15 Project Components & Estimated Timeline Summer 2013 Scope of work Project development Fall 2013 Bid Process Project bidding & contract award Winter 2013 Commencement Project commencement Spring 2014 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 100,000 - - - - 100,000 TOTAL SOURCE OF FUNDS- - 100,000 - - - - 100,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 100,000 - - - - 100,000 TOTAL GFAR- - 100,000 - - - - 100,000 TOTAL USE OF FUNDS- - 100,000 - - - - 100,000 *Total FY 2012/13 Carryforward-$ TREE TRIMMING - VARIOUS TOWN PARKSProject 831-4603 PARKS & TRAILS PROGRAM Park Improvement Projects D-16 Project Name Parks Reservation System Replacement Project Number 831-4606 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project replaces the existing online parks reservation program with a more efficient, user friendly system. Location This project will be completed online using the new software system. Project Background The Town started using its existing online parks reservation program in 2008. The program was an appropriate program at the time because it could handle basic reservation requests. Since then, the number of users has increased, along with the number of reservations booked. The current program does not offer customization options, which would enable Town staff to manage and process reservations more efficiently. The staff looked for alternative programs and found a few options that are set on .net platform, which is the current standard for all web-based programs. New program features, such as customized reports and administrative tools, will give staff options to process reservations more efficiently. Additionally, it will offer a more user friendly interface, giving community members that book park reservations online a better customer experience. Operating Budget Impacts This project will use staff time for coordination and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. TOWN-WIDE PARKS & TRAILS PROGRAM Park Improvement Projects D-17 Project Components & Estimated Timeline Summer 2013 Selection Review and select a suitable software program Winter 2013 Implementation Install new program & test and train staff for Spring 2014 park use season Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 25,000 - - - - 25,000 TOTAL SOURCE OF FUNDS- - 25,000 - - - - 25,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 25,000 - - - - 25,000 TOTAL GFAR- - 25,000 - - - - 25,000 TOTAL USE OF FUNDS- - 25,000 - - - - 25,000 *Total FY 2012/13 Carryforward-$ PARKS RESERVATION SYSTEM REPLACEMENT Project 831-4606 PARKS & TRAILS PROGRAM Park Improvement Projects D-18 Project Name Parks Restroom Partition Upgrades Project Number 831-4604 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace restroom partitions and doors at various Town parks. Location This project will be completed at several parks, including Balzar Field, Blossom Hill Park, Belgatos Park and Oak Meadow Park. Project Background Current Town park restroom partitions in several parks do not comply with current safety standards and building codes, such as the inclusion of baby changing stations in public restrooms. This project will replace the old partitions and improve the current restroom infrastructure so that it is current with building code compliance regulations and ensure ADA compliance. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. TOWN-WIDE PARKS & TRAILS PROGRAM Park Improvement Projects D-19 Project Components & Estimated Timeline Fall 2013 Design Project design & development Winter 2013 Bid Process Project bidding & contract award Spring 2014 Construction Project construction Spring 2014 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 55,000 - - - - 55,000 TOTAL SOURCE OF FUNDS- - 55,000 - - - - 55,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - Services/Supplies/Equipment- - - - - - - Site Acquisition & Preparation- - - - - - - Consultant Services- - - - - - - Project Construction Expenses- - 55,000 - - - - 55,000 TOTAL GFAR- - 55,000 - - - - 55,000 TOTAL USE OF FUNDS- - 55,000 - - - - 55,000 *Total FY 2012/13 Carryforward-$ PARKS RESTROOM PARTITION UPGRADESProject 831-4604 PARKS & TRAILS PROGRAM Park Improvement Projects D-20 Project Name Parks Playground Fibar Project Project Number 831-4605 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace fibar material at all Town playgrounds. Location This project will be completed at various parks in Los Gatos. Project Background A number of Town parks have playground structures that are heavily used by children and their families. Playground safety codes require that the fibar material be spread under and around playground structures to prevent injury to children. Fibar replacement is required when the material is below a specific depth near the playground structure. Fibar is a wood product that degrades over time based on foot traffic and weather conditions. This material should be replaced on a regular, as needed basis. This project replaces fibar materials at multiple Town playgrounds. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. TOWN-WIDE PARKS & TRAILS PROGRAM Park Improvement Projects D-21 Project Components & Estimated Timeline Summer 2013 Scope of work Project development Fall 2013 Bid Process Project bidding & contract award Winter 2013 Construction Project construction Winter 2013 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - 25,000 25,000 25,000 25,000 25,000 125,000 TOTAL SOURCE OF FUNDS- - 25,000 25,000 25,000 25,000 25,000 125,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 25,000 25,000 25,000 25,000 25,000 125,000 TOTAL GFAR- - 25,000 25,000 25,000 25,000 25,000 125,000 TOTAL USE OF FUNDS- - 25,000 25,000 25,000 25,000 25,000 125,000 *Total FY 2012/13 Carryforward-$ PARKS PLAYGROUND FIBAR PROJECTProject 831-4605 PARKS & TRAILS PROGRAM Park Improvement Projects D-22 LOS GATOS BLVD BLOSSOM KENNEDY RD SHANNON RDBlossom Hill Park HILL RD Project Name Blossom Hill Park Upgrades Project Number 831-3404 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will install a new water meter and irrigation system on the Shannon Road side of the park and install landscape improvements throughout the park. Location This project is located at Blossom Hill Park, which is at 16300 Blossom Hill Road. Project Background Blossom Hill Park is one of the most heavily used parks in Town. In FY 2012/13, the Town completed the Blossom Hill Road Improvements (Cherry Blossom Lane/Camino del Cerro) project, in conjunction with the State’s Safe Routes to School grant. This project included the installation of new sidewalk and bike pathways along Blossom Hill Road. As part of the project, frontage improvements to Blossom Hill Park were completed, which included a parking lot with enhanced sidewalk access points to the park. Additional updates to the asphalt pathway between Shannon Road and Hillbrook Drive are being proposed. This project will install a new water meter and irrigation system near the Shannon Road parking lot. There is currently no existing water irrigation system near the parking lot to service the perimeter of the lot and the parking lot islands. Trees and other landscaping will also be installed as part of this project. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project will be included in the FY 2014/15 Operating Budget. PARKS & TRAILS PROGRAM Park Improvement Projects D-23 Project Components & Estimated Timeline Fall 2013 Design Project design & development Spring 2014 Bid Process Project bidding & contract award Winter 2014 Construction Project construction Spring 2015 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - - 30,000 - - - 30,000 TOTAL SOURCE OF FUNDS- - - 30,000 - - - 30,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - - 30,000 - - - 30,000 TOTAL GFAR- - - 30,000 - - - 30,000 TOTAL USE OF FUNDS- - - 30,000 - - - 30,000 *Total FY 2012/13 Carryforward-$ BLOSSOM HILL PARK UPGRADESProject 831-3404 PARKS & TRAILS PROGRAM Park Improvement Projects D-24 PARKS & TRAILS PROGRAM Trail Improvement Projects D-25 LOS GATOS-SARATOGA RDLOS GATOS BLVD E M AIN S T HWY 17 HW Y 17 N SANTA CRUZ AV WINCHESTER BLVD BLOSSOM HILL RD LOS GATOS BLVD HWY 85 KENNEDY RDSHANNON RD LARK AV LOS GATOS-ALMADEN RD UNIVERSITY AV WEDGEWOOD KNOWLES A "B" IS A TOWN-WIDE PROJECT C PROJECT LOCATIONS A Los Gatos Creek Trail Reconstruction - Charter Oaks B Open Space Trail Upgrades C Highway 9 Pathway Connection to Los Gatos Creek Trail PARKS & TRAILS PROGRAM Trail Improvement Projects D-26 PROGRAM SECTION DIRECTORY PAGE 4503 Los Gatos Creek Trail Reconstruction - Charter Oaks D –28 4504 Open Space Trail Upgrades D - 30 4505 Highway 9 Pathway Connection to Los Gatos Creek Trail D - 32 PARKS & TRAILS PROGRAM Trail Improvement Projects D-27 The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct, repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction or resurfacing. The Parks Program section does not have ongoing programs; all projects are considered one-time identified body of work projects. One-time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. Los Gatos does have a Park Construction Tax Revenue as a designated funding source for the Park operating program budget, however tax receipts are limited to approximately $11,000 per year, not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, CDBG funds and donations are pursued and utilized for trail improvements when available. TRAIL IMPROVEMENT PROJECTS SUMMARY Carryforward Projects New Projects 4503Los Gatos Creek Trail Reconstruction - Charter Oaks- - 250,000 - - - 250,000 4504Open Space Trail Upgrades- 250,000 - - - - 250,000 4505Highway 9 Pathway Connection to LG Creek Trail- - 800,000 - - - 800,000 Total Trail Improvement Projects- 250,000 1,050,000 - - - 1,300,000 2015/16 Budget Expended Through 2012/13 2016/17 Budget 2013/14 Budget & Carryfwd* Total Budgeted 2014/15 Budget 2017/18 Budget * Total FY 2012/13 Carryforward $ 0.00 Unfunded Projects  Los Gatos Creek Trail Resurfacing ` PARKS & TRAILS PROGRAM Trail Improvement Projects D-28 HWY 17 WINCHESTER BLVD HWY 85 LARK AV WEDGEWOOD KNOWLES Project Name Los Gatos Creek Trail Reconstruction - Charter Oaks Project Number 831-4503 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will reconstruct a section of Los Gatos Creek Trail along Charter Oaks Drive. Location This project is located at the Los Gatos Creek Trail, north of Lark Avenue. Project Background The Los Gatos Creek Trail, north of Lark Avenue near Highway 85, experiences flooding during periods of heavy rainfall. This section of trail is situated close to the creek level, and flooding has been a chronic problem for this section of the trail. This proposed project will reconstruct the trail by raising its vertical alignment and constructing embankments to protect the trail surface in times of high water in the creek. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project will be included in the FY 2014/15 Operating Budget. PARKS & TRAILS PROGRAM Trail Improvement Projects D-29 Project Components & Estimated Timeline Spring 2014 Design Project design & development Summer 2014 Bid Process Project bidding & contract award Fall 2014 Construction Project construction Spring 2015 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFARCommunity Benefit- - - 250,000 - - - 250,000 TOTAL SOURCE OF FUNDS- - - 250,000 - - - 250,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - - 250,000 - - - 250,000 TOTAL GFAR- - - 250,000 - - - 250,000 TOTAL USE OF FUNDS- - - 250,000 - - - 250,000 *Total FY 2012/13 Carryforward-$ LOS GATOS CREEK TRAIL RECONSTRUCTION - CHARTER OAKSProject 832-4503 PARKS & TRAILS PROGRAM Trail Improvement Projects D-30 Project Name Open Space Trail Upgrades Project Number 831-4504 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair and replace old damaged retaining walls, fences, and embankments along the trails in the Town’s open spaces. Location This project is located at Santa Rosa Open Space, Heinz Open Space and Belgatos Park. Project Background The Town has a number of open space preserves that are under its jurisdiction. There are several public trail networks that traverse the open space preserves in the hillsides. The aging process has deteriorated a number of retaining walls and embankments along some trail sections. Without proper repair and replacement, the possibility of failure of the trails will increase greatly. This project will repair and replace several retaining walls that are supporting the trails and their embankments. In addition, this project will improve the drainage system around the retaining walls to prevent further erosion of the trails. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2013/14 Operating Budget. TOWN-WIDE PARKS & TRAILS PROGRAM Trail Improvement Projects D-31 Project Components & Estimated Timeline Summer 2013 Design Project design & development Fall 2013 Bid Process Project bidding & contract award Winter 2013 Construction Project construction Spring 2014 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAROpen Space Reserve Funds- - 250,000 - - - - 250,000 TOTAL SOURCE OF FUNDS- - 250,000 - - - - 250,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - 250,000 - - - - 250,000 TOTAL GFAR- - 250,000 - - - - 250,000 TOTAL USE OF FUNDS- - 250,000 - - - - 250,000 *Total FY 2012/13 Carryforward-$ OPEN SPACE TRAIL UPGRADESProject 832-4504 PARKS & TRAILS PROGRAM Trail Improvement Projects D-32 Project Name Highway 9 Pathway Connection to Los Gatos Creek Trail Project Number 831-4505 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will construct a pathway and bridge from Highway 9 to the Los Gatos Creek Trail. Location This project is located at Highway 9 near University Avenue. Project Background In order to access the Los Gatos Creek Trail, trail users must cross the Highway 9 intersection at University Avenue. This particular intersection has heavy volumes of motor vehicle traffic and is difficult to cross. Construction of two (2) trail connections from Highway 9 to Los Gatos Creek Trail will greatly improve the access to the trail for pedestrians and bicyclists. The first link (on the north side) will start at sidewalk near the Wraight Avenue and Highway 9 intersection, and run parallel to the Highway 9 overpass in the easterly direction. In order to access the trail from the south side, a pedestrian bridge will need to be constructed to connect west and east sides of the channel. The second link will start at the Highway 9 and Highway 17 north merger, and arc northwards to the Los Gatos Creek Trail. The total estimated length of extension is 450 ft. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project and will be included in the FY 2014/15 Operating Budget. PARKS & TRAILS PROGRAM Trail Improvement Projects D-33 Project Components & Estimated Timeline Fall 2014 Design Project design & development Spring 2015 Bid Process Project bidding & contract award Summer 2015 Construction Project construction Spring 2016 Completion Project completion Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project SOURCE OF FUNDS& Carryfwd * GFAR- - - 80,000 - - - 80,000 GRANTS & AWARDS- - - 720,000 - - - 720,000 TOTAL SOURCE OF FUNDS- - - 800,000 - - - 800,000 Prior Yrs Actuals 2012/13 Estimated 2013/14 Budget 2014/15 Proposed 2015/16 Proposed 2016/17 Proposed 2017/18 Proposed Total Project USE OF FUNDS& Carryfwd * GFAR Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - - 80,000 - - - 80,000 TOTAL GFAR- - - 80,000 - - - 80,000 GRANTS & AWARDS Salaries and Benefits- - - - - - - - Services/Supplies/Equipment- - - - - - - - Site Acquisition & Preparation- - - - - - - - Consultant Services- - - - - - - - Project Construction Expenses- - - 720,000 - - - 720,000 TOTAL GRANTS & AWARDS- - - 720,000 - - - 720,000 TOTAL USE OF FUNDS- - - 800,000 - - - 800,000 *Total FY 2012/13 Carryforward-$ HIGHWAY 9 PATHWAY CONNECTION TO LOS GATOS CREEK TRAILProject 831-4505 PARKS & TRAILS PROGRAM Trail Improvement Projects D-34