4 - Completed CIP Projects COMPLETED CIP PROJECTS FY 2012/13 A-13 LOS GATOS-SARATOGA RDLOS GATOS BLVD E MAIN ST HWY 17 HW Y 17 N SANTA CRUZ AV WINCHESTER BLVD BLOSSOM HILL RD LOS GATOS BLVD HWY 85 KENNEDY RDSHANNON RD LARK AV UNIVERSITY AV WEDGEWOOD POL LA RD R D N D K & M WERE TOWN-WIDE PROJECTS F B A L B C G H I J O EE PROJECT LOCATIONS A University Avenue Resurfacing (Shelbourne Way to Vasona Dam) I Howe’s Play Lot Pathway Improvements B Wedgewood Avenue Improvements J Live Oak Manor Park Upgrades C Blossom Hill Road Improvements (Cherry Blossom Lane/Camino del Cerro) K Turf Conversion and Water Conservation D University Avenue Sidewalk/Creekside Sports Park L Library Facility E Hicks & Philips Culvert Improvements M Energy Efficient Lighting Project F Northside Parking Lot Improvements N Plaza Bus Shelter Renovation Project G Los Gatos Creekside Sports Park O Down Town Tree Light Replacement H Pageant Grounds Phase 3 Improvements COMPLETED CIP PROJECTS FY 2012/13 A-14 A University Avenue Resurfacing University Avenue Resurfacing (Shelbourne Way to Vasona Dam) This project performed base repairs, storm drain improvements, curb, gutter & sidewalk construction, retaining wall construction, and new asphalt overlay for the section of University Avenue from Shelbourne Way to Vasona Dam. The total project cost was $604,016. B Wedgewood Avenue Improvements Wedgewood Avenue Improvements This project included widening of Wedgewood Avenue on the south side from Mulberry Drive to Granada Way, creating new bicycle lanes and sidewalks and completing the construction of the underground storm drain system. The total project cost was $1,030,567. C Blossom Hill Road Improvements Blossom Hill Road Improvements This project widened Blossom Hill Road from Cherry Blossom Lane to Camino Del Cerro, reconfigured crosswalks at Blossom Hill Road & Cherry Blossom Lane, and constructed sidewalks, a lighted crosswalk & bicycle lanes on a section of Blossom Hill Road. The total project cost was $1,307,577. COMPLETED CIP PROJECTS FY 2012/13 A-15 D University Avenue Sidewalk/Creekside Sports Park University Avenue Sidewalk/Creekside Sports Park This project constructed a new sidewalk on the east side of University Avenue from the new Los Gatos Creekside sports park to Lark Avenue. The total project cost was $118,871. E Hicks & Philips Culvert Improvements Hicks & Philips Culvert Improvements This project rehabilitated two rusted and broken corrugated metal culverts under Hicks Road and Philips Avenue. The total project cost was $242,286. F Northside Parking Lot Improvements Northside Parking Lot Improvements This project improved the Northside Parking Lot by repairing broken curbs, replacing damaged pavement, resurfacing and striping the entire lot and enhancing the landscaping and irrigation system. The total project cost was $74,516. COMPLETED CIP PROJECTS FY 2012/13 A-16 G. Los Gatos Creekside Sports Park Los Gatos Creekside Sports Park This project constructed a new sports park with multi-use fields, restrooms and a snack shack for community recreation and sports usage. The fields were constructed using Astro- turf for durability and reduction of maintenance costs. The total project cost was $2,778,195. H Pageant Grounds Phase III Improvements Pageant Grounds Phase III Improvements This project renovated the Pageant Grounds with improvements to landscaping & irrigation system and construction of a retaining wall to support the access pathway to the site. The total Phase III project cost was $482,064. (Phase II project cost was $530,750) I Howe’s Play Lot Pathway Howe’s Play Lot Pathway This project repaired and replaced concrete pathways, irrigation system and turf. The new pathways provided full ADA access to the park and improved pedestrian and bicycle access. The total project cost was $34,535. COMPLETED CIP PROJECTS FY 2012/13 A-17 J Live Oak Manor Upgrades Live Oak Manor Park Upgrades This project included paving the dirt pathway at the park to make it ADA compliant. It also included reconstruction of the basketball court and installation of new conduit and wiring. The total project cost was $150,187. K Turf Conversion & Water Conservation Turf Conversion & Water Conservation This project installed new irrigation control systems at various park and landscaped locations throughout Town that regulate water use and implement shut-down and notifications in the event of a leak. The total project cost was $33,000. L Library Facility Library Facility This project constructed a new 30,000 sq. ft. library. The new library includes technology lab, a group study area, a teen area, expanded children’s and storytelling area, a history room, a periodical/reading room with a fireplace, a meeting room and a coffee cart. The total project cost was $17,812,892. COMPLETED CIP PROJECTS FY 2012/13 A-18 M Energy Efficient Lighting Project Energy Efficient Lighting Project This project replaced old outdoor lighting at Town parking lots and parks with energy efficient induction and LED lighting. A total of 176 energy efficient lighting fixtures and bulbs were installed in 16 different Town-owned parking lots and parks. The total project cost was $162,712. N Plaza Bus Shelter Renovation Project Plaza Bus Shelter Renovation Project This project repaired the Town Plaza bus shelter roof and added an electrical outlet to provide access for the Town Plaza Park Holiday Tree Lighting and other special events. The total project cost was $8,030. O Downtown Tree Light Replacement Downtown Tree Light Replacement This project replaced the existing tree lights in the downtown with new LED tree lights. The total project cost was $97,500.