PROJECT LOCATIONS
A University Avenue Resurfacing (Shelbourne Way to
Vasona Dam) I Howe’s Play Lot Pathway Improvements
B Wedgewood Avenue Improvements J Live Oak Manor Park Upgrades
C Blossom Hill Road Improvements (Cherry Blossom
Lane/Camino del Cerro) K Turf Conversion and Water Conservation
D University Avenue Sidewalk/Creekside Sports Park L Library Facility
E Hicks & Philips Culvert Improvements M Energy Efficient Lighting Project
F Northside Parking Lot Improvements N Plaza Bus Shelter Renovation Project
G Los Gatos Creekside Sports Park O Down Town Tree Light Replacement
H Pageant Grounds Phase 3 Improvements
COMPLETED CIP PROJECTS
FY 2012/13
A-14
A University Avenue Resurfacing
University Avenue Resurfacing (Shelbourne Way to
Vasona Dam)
This project performed base repairs, storm drain
improvements, curb, gutter & sidewalk construction,
retaining wall construction, and new asphalt overlay for the
section of University Avenue from Shelbourne Way to
Vasona Dam.
The total project cost was $604,016.
B Wedgewood Avenue Improvements
Wedgewood Avenue Improvements
This project included widening of Wedgewood Avenue on
the south side from Mulberry Drive to Granada Way,
creating new bicycle lanes and sidewalks and completing the
construction of the underground storm drain system.
The total project cost was $1,030,567.
C Blossom Hill Road Improvements
Blossom Hill Road Improvements
This project widened Blossom Hill Road from Cherry
Blossom Lane to Camino Del Cerro, reconfigured
crosswalks at Blossom Hill Road & Cherry Blossom Lane,
and constructed sidewalks, a lighted crosswalk & bicycle
lanes on a section of Blossom Hill Road.
The total project cost was $1,307,577.
COMPLETED CIP PROJECTS
FY 2012/13
A-15
D University Avenue Sidewalk/Creekside Sports Park
University Avenue Sidewalk/Creekside Sports Park
This project constructed a new sidewalk on the east side of
University Avenue from the new Los Gatos Creekside sports
park to Lark Avenue.
The total project cost was $118,871.
E Hicks & Philips Culvert Improvements
Hicks & Philips Culvert Improvements
This project rehabilitated two rusted and broken corrugated
metal culverts under Hicks Road and Philips Avenue.
The total project cost was $242,286.
F Northside Parking Lot Improvements
Northside Parking Lot Improvements
This project improved the Northside Parking Lot by
repairing broken curbs, replacing damaged pavement,
resurfacing and striping the entire lot and enhancing the
landscaping and irrigation system.
The total project cost was $74,516.
COMPLETED CIP PROJECTS
FY 2012/13
A-16
G. Los Gatos Creekside Sports Park
Los Gatos Creekside Sports Park
This project constructed a new sports park with multi-use
fields, restrooms and a snack shack for community recreation
and sports usage. The fields were constructed using Astro-
turf for durability and reduction of maintenance costs.
The total project cost was $2,778,195.
H Pageant Grounds Phase III Improvements
Pageant Grounds Phase III Improvements
This project renovated the Pageant Grounds with
improvements to landscaping & irrigation system and
construction of a retaining wall to support the access
pathway to the site.
The total Phase III project cost was $482,064.
(Phase II project cost was $530,750)
I Howe’s Play Lot Pathway
Howe’s Play Lot Pathway
This project repaired and replaced concrete pathways,
irrigation system and turf. The new pathways provided full
ADA access to the park and improved pedestrian and bicycle
access.
The total project cost was $34,535.
COMPLETED CIP PROJECTS
FY 2012/13
A-17
J Live Oak Manor Upgrades
Live Oak Manor Park Upgrades
This project included paving the dirt pathway at the park to
make it ADA compliant. It also included reconstruction of
the basketball court and installation of new conduit and
wiring.
The total project cost was $150,187.
K Turf Conversion & Water Conservation
Turf Conversion & Water Conservation
This project installed new irrigation control systems at
various park and landscaped locations throughout Town that
regulate water use and implement shut-down and
notifications in the event of a leak.
The total project cost was $33,000.
L Library Facility
Library Facility
This project constructed a new 30,000 sq. ft. library. The new
library includes technology lab, a group study area, a teen
area, expanded children’s and storytelling area, a history
room, a periodical/reading room with a fireplace, a meeting
room and a coffee cart.
The total project cost was $17,812,892.
COMPLETED CIP PROJECTS
FY 2012/13
A-18
M Energy Efficient Lighting Project
Energy Efficient Lighting Project
This project replaced old outdoor lighting at Town parking
lots and parks with energy efficient induction and LED
lighting. A total of 176 energy efficient lighting fixtures and
bulbs were installed in 16 different Town-owned parking lots
and parks.
The total project cost was $162,712.
N Plaza Bus Shelter Renovation Project
Plaza Bus Shelter Renovation Project
This project repaired the Town Plaza bus shelter roof and
added an electrical outlet to provide access for the Town
Plaza Park Holiday Tree Lighting and other special events.
The total project cost was $8,030.
O Downtown Tree Light Replacement
Downtown Tree Light Replacement
This project replaced the existing tree lights in the downtown
with new LED tree lights.
The total project cost was $97,500.