Loading...
10�°W N 0 s COUNCIL AGENDA REPORT DATE: OCTOBER 29, 2012 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER MEETING DATE: 11/19/12 ITEM NO: I () SUBJECT: PPW JOB NO. 11 -16 — FY 2011/12 STREET REPAIR & RESURFACING PROJECT 811 -9901 AUTHORIZE THE TOWN MANAGER TO EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION ACCEPTING THE WORK OF INTERMOUNTAIN SLURRY SEAL INC. AND AUTHORIZE RECORDING BY THE CLERK ADMINISTRATOR RECOMMENDATION: Authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Intermountain Slurry Seal Inc. and authorize recording by the Clerk Administrator. BACKGROUND: The Town's adopted FY 2011/12- 2015/16 Capital Improvement Program (CIP) Budget designates funding for infrastructure repair and replacement projects and is consistent with the Town's goals to improve public safety and to improve the quality of Town streets. This project was designed to resurface several sections of the Town with the use of the Rubberized Asphalt Concrete (RAC) Cape Seal process, as recommended by the Council at the May 7, 2012 Town Council meeting. The designated streets -for -this project are located- within the general areas of Chirco Drive, Placer Oaks Drive, Longmeadow Drive, and the upper part of the Almond Grove area. DISCUSSION: Two bids were received for this project in May, however, neither bid complied with the Town's requirements and bidding process. Both bids were rejected by the Council and subsequently re- bid during June. During the July Council recess, the contract was awarded to Intermountain Slurry Seal Inc. under the Town Manager's Authority, and subsequently approved by the Town Council on August 6, 2012...- --°°�� PREPARED BY: TODD CAPURSO Director of Parks and Public Works Reviewed by: Assistant Town Manager Town Attorney Finance N:\ PPW\MANAGEMENT\COUNCIL\COUNCIL REPORTS\2012 Reports\1 1 1912\1 1-1 6-FY201112 Street Resurfacing Acceptance.docx PAGE 2 OCTOBER 29, 2012 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 11 -16 — FY 2011/12 STREET REPAIR & RESURFACING PROJECT 811 -9901 DISCUSSION (cont'd.): The contracted work has been satisfactorily completed by Intermountain Slurry Seal Inc. and is being recommended for acceptance by the Parks and Public Works Department. Ten percent of the faithful performance bond will remain in effect for a period of two years to guarantee any needed repair and /or replacement caused by defective materials and workmanship. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town's acceptance of the project. CONCLUSION: Staff recommends that the Town Council authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion accepting the work of Intermountain Slurry Seal Inc. and authorize recording by the Clerk Administrator. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. FISCAL IMPACT: This project was completed within the Council approved budget, as demonstrated by the fiscal table below. TOTALS $ 2,204,385 $ 1,512,230 Blue int& Co _......lx'_ ..Py.._... _ . . _. _. _ $ 365 Communications 1,937 Construction ...._. ......_.. 1,490,070 Consultation Services 19,858 TOTALS