Loading...
Traffic Engineering Peer Review Consultant Services�pW N 0 t. MEETING DATE: 06/18/12 ITEM NO: ri R COUNCIL AGENDA IgUrk)KI DATE: JUNE 7, 2012 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER 'A � SUBJECT: PPW JOB NO. Al2 -001 - TRAFFIC ENGINEERING PEER REVIEW CONSULTANT SERVICES AUTHORIZE THE TOWN MANAGER TO EXECUTE AN AGREEMENT FOR TRAFFIC ENGINEERING CONSULTANT SERVICES WITH TJKM TRANSPORTATION CONSULTANTS INC. TO PERFORM TRAFFIC ENGINEERING CONSULTANT SERVICES IN THE TOWN OF LOS GATOS ON AN ON -CALL BASIS FOR PRIVATE DEVELOPMENT REVIEW AND PUBLIC WORKS PROJECTS AS NEEDED. RECOMMENDATI Authorize the Town Manager to execute an agreement for traffic engineering consultant services with TJKM Transportation Consultants Inc. to perform traffic engineering consultant services in the Town of Los Gatos on an on -call basis for private development review and public works projects as needed. BACKGROUND Professional consultants have been utilized by the Town of Los Gatos to assist staff with the review of environmental, architectural, geology, traffic, storm water permit, building plan check, and arborist issues related to private development projects. These consultant contracts are reviewed by the appropriate Town department and staff to ensure that we are satisfied with the services provided and that the Town receives quality service. The consulting firm of TJKM Transportation Consultants Inc. has been providing very satisfactory traffic engineering peer review services since 2004. The current contract with this firm expires on June 30, 2012. DISCUSSION Town policy requires that on -going consultant contracts cannot be extended for more than five years. This is to ensure that the Town evaluates such contracts and is receiving the best service from our consultants. PREPARED BY : TODD CAPURSO Director of Parks and Public Works Reviewed by:J55:Assistant Town Manager Town Attorney Finance N:\PPW\ MANAGEMENT\ COUNCIL \COUNCIL REPORTS\2012 Reports\June 18\Al2- 001.traffic.engr. consultant .TJKM.peer.review.docx PAGE 2 JUNE 7, 2012 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. Al2 -001 - TRAFFIC ENGINEERING PEER REVIEW CONSULTANT SERVICES DISCUSSION (cont'd.) In response to this Request for Proposal, the Town received two proposals. Town staff reviewed the proposals received and determined that the firm of TJKM Transportation Consultants Inc. is the best qualified to perform the traffic engineering peer review for private development projects for the Town. This firm is very familiar with the Town and its traffic related issues, and staff is satisfied with their service and response. It is important that with a number of high profile private development projects planned in the coming months, the Town's consultants are experienced and familiar with the Town's complex private development process, codes, and regulations in order to provide professional service for the community. Additionally, situations may arise when supplemental outside resources are required to analyze or review Town projects. This consultant may also be used to provide those services on a project by project basis. CONCLUSION It is recommended that the Town Council authorize the Town Manager to execute a professional service agreement for two years with TJKM Transportation Consultants Inc., for traffic engineering peer review for private development projects and design for public works projects as needed. ENVIRONMENTAL ASSESSMENT The project is Categorically Exempt pursuant to Sections 15301 (c), 15303(e) and 15304(b) of the State CEQA guidelines. FISCAL IMPACT The work by TJKM Transportation Consultants Inc. will be for private development projects and will be fully funded by private developers, for any public works project design work will be performed after appropriate funding is allocated. Attachments 1. Proposal from TJKM Transportation Consultants dated May 15, 2012. Attachment I [Vision That Moves Your Community Transportation Consultants May 15, 2012 Mr. Kevin Rohani, P,E., Town Engineer Town of Los Gatos 41 Miles Avenue Los Gatos, CA 95030 Subject: Two-year Agreement (July 2012 —June 2014) for On-call Traffic Engineering Services Dear Mr. Rohani, TJKM Transportation Consultants is pleased to have the opportunity to continue to provide on-call traffic engineering services for the Town of Los Gatos. Per your request, please find enclosed TJKM's proposed scope of work for the new contract term ouly 2012 — June 2014). We propose to offer the same services and with the same rate structure as provided in our Statement of Qualifications submitted on March 30, 2012. Please note that these rates will remain effective throughout the term of this two-year contract. Again, thank you for the opportunity to continue our service to the Town of Los Gatos. We look forward to working with you on future projects. If you have any questions or concerns, or if you need additional documentation to process the contract extension, please give me a call at (925) 264-5025. You may also reach me via email at rhaygood(d).tikm.com. Regards, Pleasanton tol_ 3875 Hopyard Road Suite 200 Pleasanton, CA 94588-8526 925.463.06 11 1 Rich Haygood, P.E., T.E. 925.463.3690 fax 1 Senior Associate/Project Manager Fresno 5 16 W. Shaw Avenue Suite 200 cc: Vishnu Gandluru — TJKM Fresno, CA Evi Pagh — TJ KM 93704-2515 559.325.7530 559,221.4940 fax Enclosure: Scope of Services Sacramento 980 Ninth Street 16�h Floor Sacramento, CA 95814- 7,6 91 6.449.9095 Santa Rosa 1400 N. Dutton Avenue I Suite 21 Santa Rosa, CA 95401-4643 707.575.5800 707.575.5888 fax tll<m@tjkn www.tjl<lii.com I jAjurisdictionWos gatos\proposa1s\2012\on-call to services\105 1512-rohani.dorx TJKM Transportation Vision That Moves Your Community Consultants TJKM Scope of Work for Los Gatos On -Call Services, July 2012 v June 2014 The majority of tasks to be performed by the consultant will be traffic impact studies for private development. The consultant will follow traffic impact study guidelines and requirements in effect in Los Gatos and in Santa Clara County. A scope of work will be negotiated to establish the various analyses required and the extent of the study area, including study intersections, arterial segments, and possibly freeway segments and interchanges, as appropriate. The typical scope of work includes an introduction that establishes the basis and reason for the traffic impact report. New traffic counts and other traffic data will be collected, as necessary, and presented in text, tabular and graphic format within an "Existing Conditions" chapter of the report. The "Existing Conditions" section will also include level of service calculations using approved methods. The consultant also anticipates that nearby, but unoccupied, new development projects will also impact the study intersections. The Town of Los Gatos staff maintains a list of the approved and pending projects, which will be incorporated into the Town's Traffix model. The additional trips from these new developments will be added to the study intersections, and arterial /freeway segments and interchanges, to assess levels of service with the additional trips. The proposed project will be described, and an estimate of project trip generation will be made for the additional peak hour and daily trips. These additional trips will be assigned to the study intersections, arterial and freeway segments and interchanges for an assessment of levels of service with the project and the approved project trips. Where operations fall below acceptable levels of service, the consultant will identify feasible mitigation measures to offset the significant impacts. Also included will be an assessment of site access and circulation, and potential safety impacts. All appropriate travel modes, such as private automobile, trucks, pedestrian, bicycle, and public transit will be included in the analysis. Impacts on public parking will also be identified. The procedures, data, findings and conclusions will be summarized, and detailed calculations of levels of service and other analysis details will be appended to the final draft report. Upon review by the Town of Los Gatos, the consultant will prepare a final version of the traffic impact study for inclusion with the application for development entitlements. At the conclusion of each traffic study, TJKM will provide the Town staff with the updated Traffix model that includes the proposed and other approved /pending projects. A similar process will also be completed for public projects as appropriate and as negotiated in a scope of services with the Town of Los Gatos. TJKM Transportation Vision That Moves Your Community Consultants 1 __T ­_ h_e_ ' c ­ onsuItant will also provide additional professional traffic engineering and transportation planning services including: '91 Traffic safety studies and improvements; '41 Traffic signal design (new, or modifications of existing signals); Development of functional requirements for Advanced Traffic Management Systems, and other related traffic control and Intelligent Transportation Systems tasks; N Signing and striping design; '41 Traffic calming; ` School access studies; 'q Analysis of service requests; 'q Parking needs studies and parking plans; `9 Traffic demand modeling and forecasting; 'q Micro'ximulationrnodeling of traffic operations using SimTraffic 7.0. A|MSUN N{S or V|SS|M;xnd '91 Other traffic engineering and transportation planning services, as required, Tms PAGE INTENTIONALLY LEFT BLANK