Loading...
CREEKSIDE SPORTS PARKpo w N 0� gyaVlt COUNCIL AGENDA REPORT DATE: JANUARY 27, 2012 MEETING DATE: 2/6/12 ITEM NO: 3 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER SUBJECT: PPW PROJECT NO. 10 -15 —LOS GATOS CREEKSIDE SPORTS PARK 4.11- 831 -4402 APPROVE PLANS AND SPECIFICATIONS FOR CONSTRUCTION OF THE LOS GATOS CREEKSIDE SPORTS PARK AND AUTHORIZE STAFF TO ADVERTISE THE PROJECT FOR BID RECOMMENDATION Approve plans and specifications for construction of the Los Gatos Creekside Sports Park and authorize staff to advertise the project for bid. BACKGROUND On August 24, 2011, the Planning Commission reviewed the project and subsequently approved the Conditional Use Permit, Architecture and Site Application, and adopted the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program. On October 3, 2011, the Town Council approved the Master Plan for the Creekside Sports Park. The proposed sports park includes a 180 ft. x 300 ft. field that can be used for soccer, lacrosse, football, or other field sports. A restroom and concession building will be located at the south end of the park, along with a small picnic area and tot play area. The community input process was utilized to identify desired features for the sports park and provide feedback on proposed conceptual designs. In addition to community meetings, staff obtained input through letters, emails and telephone correspondences. This input, combined with feedback from the design consultants, external stakeholders and staff, was used to finalize the plans and specifications for the sports park. DISCUSSION Plans and specifications for this project are complete and are available for review in the Town Clerk Department on the Friday before the Council meeting. PREPARED BY : TODD CAPURSO Director of Parks and Public Works Reviewed by: Assistant Town Manager T own Attorney � 1nance _T__J * N:\ PPW\ MANAGEMENT \COUNCIL \COUNCIL REPORTS\2012 ReportsTebruary 6 \10 -15 Creekside Sports Park Plans and Specifications.docx PAGE 2 JANUARY 27, 2012 MAYOR AND TOWN COUNCIL SUBJECT: PPW PROJECT NO. 10 -15 —LOS GATOS CREEKSIDE SPORTS PARK 411- 831 -4402 DISCUSSION (cont'd) The cost estimate prepared by the architect includes all of the costs to be included in the base bid. If the Town Council approves these plans and specifications, it will be advertised for bid, and a construction contract will be presented to Council for award on March 19, 2012. Depending upon weather conditions, staff anticipates that construction of this project would begin in April 2012. CONCLUSION It is recommended that the Town Council approve plans and specifications for the Los Gatos Creekside Sports Park and authorize staff to advertise the project for bids. ENVIRONMENTAL ASSESSMENT A Mitigated Negative Declaration was prepared and approved for this project. FISCAL IMPACT There are sufficient funds available for this project through the approved FY 2010/11 - 2014/15 Capital Improvement Program Budget.