09 - Bridges STREET PROGRAM
Bridge Projects
C-53
PROJECT LOCATIONS
A Quito Road - Bridge Replacement
STREET PROGRAM
Bridge Projects
C-54
PROGRAM SECTION DIRECTORY PAGE
0801 Quito Road - Bridge Replacement C – 56
STREET PROGRAM
Bridge Projects
C-55
The Street Program’s Bridge Projects Section contains Capital Improvement Program projects that repair, replace, or
rehabilitate a deficient bridge structure as the primary scope of work.
Bridge structure safety falls under the guidance of state and federal regulations, and bridge projects are often driven by
available funding from these jurisdictions, such as Caltrans grant programs or the Federal Highway Bridge Replacement and
Rehabilitation (HBRR) program. Los Gatos does not have a designated funding source for repairing, maintaining, and
improving the Town’s bridges, and relies upon grant programs for major bridge improvement projects.
BRIDGE PROJECTS SUMMARY
Carryforward Projects
0801Quito Rd - Bridge Replacement32,038 123,730 - - - - 155,768
Total Bridge Projects32,038 123,730 - - - - 155,768
2012/13
Budget
2014/15
Budget
2013/14
Budget
Expended
Through
2010/11Total Budgeted
2011/12
Budget &
Carryfwd*
2015/16
Budget
* Total FY 2010/11 Carryforward $123,730
STREET PROGRAM
Bridge Projects
C-56
Project Name Quito Road - Bridge Replacement Project Number 818-0801
Department Parks & Public Works Project Manager Town Engineer: Kevin Rohani
Description This project funds the Town’s portion of the replacement cost for two bridges on Quito Road to
improve roadway safety and provide adequate storm water flow capacity in the creek under the bridge.
Location The two Quito Road bridges span a tributary of San Tomas Aquino Creek. The bridges are located on
Quito Road in the vicinity of Old Adobe Road, approximately 1½ miles north of Highway 9, on the
common boundary line between the City of Saratoga and the Town of Los Gatos.
Project
Background
San Tomas Aquino Creek is under the jurisdiction of the Santa Clara Valley Water District (SCVWD),
while the replacement of the bridges is the shared responsibility of the City of Saratoga and the Town
of Los Gatos. Both bridges are approximately ninety years old and have been classified “structurally
deficient” per Caltrans guidelines. In addition, both bridges are not adequate to receive 100-year flood
flows.
In 2001, the City of Saratoga, the project sponsor, secured partial funding (80%) through the Federal
Highway Bridge Replacement and Rehabilitation (HBRR) program to replace both bridges with wider
span structures that will allow the 100-year design flood flow to pass underneath. Saratoga is the lead
agency to oversee the design, environmental, right-of-way acquisition and construction services for the
project. The City of Saratoga, the Town of Los Gatos and SCVWD agreed to share the duties and
responsibilities for the project and the remaining 20% local match-funding requirement.
After further evaluation of the bridges, it was determined that Quito Road would require reconstruction
at each end of the bridge, which in turn would require additional right-of-way acquisitions and
environmental reviews under both the State of California and Federal regulations. These changes will
force a redesign of the project, significantly increasing the estimated costs. The City of Saratoga is
planning to request additional funding from Caltrans due to these anticipated cost increases. The
original funding has been largely expended, and further work is on hold until Saratoga secures
additional funding. It is not anticipated that any construction work will take place on these bridges for
at least the next 2 years.
Operating
Budget Impacts
Engineering staff time for coordination of this project with the City of Saratoga is incorporated into the
FY 2011/12 Operating Budget. Completion of this project will mitigate the potential costs of lawsuits
from bridge failure and pre-empt the cost of replacing the bridge in an emergency situation.
H
W
Y 85
PO LL AR D RD
Q
U
I
T
O
R
D
STREET PROGRAM
Bridge Projects
C-57
Project
Components &
Estimated
Timeline
Jan 2001 Grant Funding The City of Saratoga obtained grant funding from the Federal
Highway Bridge Replacement and Rehabilitation (HBRR)
program.
Oct 2001 Cooperative
Agreement
Council approved a cooperative agreement with the City of
Saratoga and SCVWD for the replacement of the two bridges.
May 2002 Preliminary Design City of Saratoga started preliminary design.
2011 Right of way Right of way acquisition process is ongoing and Environmental
permitting is underway.
2012 Final Design Design completed and project bidded by City of Saratoga
2014
Estimated
Completion
Construction is anticipated to begin in 2013
Prior Yrs
Actuals
2010/11
Estimated
2011/12
Budget
2012/13
Planned
2013/14
Planned
2014/15
Planned
2015/16
PlannedTotal Project
SOURCE OF FUNDS& Carryfwd *
GFAR
32,038 - 123,730 - - - - 155,768
TOTAL SOURCE OF FUNDS32,038 - 123,730 - - - - 155,768
Prior Yrs
Actuals
2010/11
Estimated
2011/12
Budget
2012/13
Planned
2013/14
Planned
2014/15
Planned
2015/16
PlannedTotal Project
USE OF FUNDS& Carryfwd *
GFAR
Salaries and Benefits- - - - - - -
-
Services/Supplies/Equipment- - - - - - - -
Site Acquisition & Preparation- - - - - - - -
Consultant Services- - - - - - - -
Project Construction Expenses32,038 - 123,730 - - - - 155,768
TOTAL GFAR
32,038 - 123,730 - - - - 155,768
TOTAL USE OF FUNDS32,038 - 123,730 - - - - 155,768
*
Total FY 2010/11 Carryforward123,730
QUITO ROAD - BRIDGE REPLACEMENTProject 818-0801
STREET PROGRAM
Bridge Projects
C-58