07 Staff Report - Roberts Road Bridge Reconstruction Programcow" 0 MEETING DATE: 11/2/09 ITEM NO. "r COUNCIL AGENDA REPORT 7 ~~8 G At~s DATE: OCTOBER 20, 2009 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER SUBJECT: PROJECT NO. 04-68 - ROBERTS ROAD BRIDGE RECONSTRUCTION PROGRAM 411-818-0802 ADOPT RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR THE ROBERTS ROAD BRIDGE RECONSTRUCTION PROJECT AND AUTHORIZING STAFF TO ADVERTISE FOR BID RECOMMENDATION: Adopt a Resolution approving plans and specifications for the Roberts Road Bridge Reconstruction project and authorizing staff to advertise for bid. BACKGROUND: The Roberts Road Bridge, which crosses Los Gatos Creek, was built in 1918. The design of this bridge was in accordance with the engineering standards and requirements of the early 1900's. However, as it stands today, the bridge does not comply with today's modern engineering standards regarding structural integrity and seismic design. Caltrans conducted an inspection in 2004 and identified cracks and other structural damage in various areas of the bridge, including the piers, roadway slab, and rails. Reinforcing steel is also exposed in several locations which is rusting and continues to deteriorate. There has been significant deterioration of the center pier and the abutments due to water erosion as well. This erosion has increased measurably in recent years, as described in subsequent bridge inspection reports. The Roberts Road Bridge project has been discussed at three previous Town Council meetings, most recently on December 5, 2005. At that meeting, the Council approved a recommendation to replace the bridge with a new structure that meets current safety design standards and authorized staff to apply for grant funding from Caltrans for this project. Funding was secured from Caltrans on March 19, 2007, for the design phase of the project. PREPARED BY: TODD CAPURSO Director of Parks and Public Works Reviewed by. Assistant Town Manager Town Attorney Clerk Administrator Finance Community Development N:\PPW\MANAGEMENT\COUNCIL\COUNCIL REPORTS\2009 reports\November 2\04-69.roberts.road.bridge.pse.doe PAGE 2 OCTOBER 20, 2009 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 04-68 ROBERTS ROAD BRIDGE RECONSTRUCTION PROJECT T)NCTTCCrnN- Since spring 2007, Town staff and the consultant design team have been collaboratively working with residents, Caltrans, utility companies, and regulatory agencies to complete the design of this project. The goal of this process was to design a bridge that meets current safety and seismic engineering standards, while also retaining aesthetic elements that are consistent with the overall feel and ambience of the adjacent neighborhood. Staff held two community meetings with local businesses and residents (March 18, 2008, and October 6, 2009) to review various elements of project design and reach consensus on the aesthetic aspects of the new bridge. These meetings were well attended and resulted in neighborhood consensus regarding the aesthetic elements of the new bridge (i.e. railings, abutment wall treatment, additional lights, and sidewalks). These meetings were also useful in identifying other features that would enhance the project. These additional elements include the replacement of failing retaining walls on both sides of Roberts Road from the bridge west to Brickway Court, as well as the construction of curb, gutter, and sidewalk on the south side of Roberts Road. These features would improve the pedestrian access to the new bridge and provide for safe access to the Los Gatos Creek Trail. In accordance with Caltrans guidelines, staff requested construction funding for the project in winter 2008. During the period, the State of California was going through severe budget challenges and all State-funded projects were put on hold. However, staff continued to work collaboratively with Caltrans over the past several months to keep this project on the Caltrans active list for funding. As result of these efforts, on August 24, 2009, funding for the construction of the project was secured. This construction funding also includes an additional amount of up to $1,000,000 for the additional elements of the project that were identified as result of staff discussions with the neighbors. The Caltrans grant covers 88.5% of all project costs; the Town's match is 11.5%. Plans and Specifications for this project are complete and will be available for review in the Clerk Department on the Friday prior to the Council meeting, October 30th. Upon approval of plans and specifications by the Council, the project will be advertised and a report for the award of the construction contract will be presented to the Council on December 21, 2009. The construction of this project is anticipated to begin in January 2010 and completed by December 2010. CONCLUSION: It is recommended that the Town Council adopt the attached Resolution approving the plans and specifications for Roberts Road Bridge Reconstruction project and authorizing staff to advertise the project for bids. PAGE 3 OCTOBER 20, 2009 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 04-68 ROBERTS ROAD BRIDGE RECONSTRUCTION PROJECT ENVIRONMENTAL ASSESSMENT: This project is Categorically Exempt pursuant to Sections 15301 (c), and 15303 (e), and 15304 (b) of the State CEQA guidelines. FISCAL IMPACT: There are sufficient funds available for this project. A detailed budget summary will be provided at the December 21, 2009, Council meeting when the construction contract is awarded. Attachment: Resolution approving plans and specifications for Roberts Road Bridge Reconstruction project and authorizing staff to advertise for bids. Attachment 1 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS APPROVING THE PLANS AND SPECIFICATIONS FOR THE PROJECT 04-68 - ROBERTS ROAD BRIDGE RECONSTRUCTION PROJECT AND AUTHORIZING STAFF TO ADVERTISE THE PROJECT FOR BID WHEREAS, plans and specifications for Roberts Road Bridge Reconstruction project have been prepared by the Town Engineer and duly filed with the Clerk Administer; and WHEREAS, public improvements are of benefit to the project area or the immediate neighborhood of the project area; and WHEREAS, the Town Council of the Town of Los Gatos has reviewed said plans and specifications. NOW, THEREFORE, BE IT RESOLVED that the Town Council approves the plans and specifications for Roberts Road Bridge Reconstruction Project; and BE IT FURTHER RESOLVED that the Clerk Administer is hereby authorized and directed to advertise the Roberts Road Bridge Reconstruction project for bid in the manner prescribed by the Town Municipal Code. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on the 2nd day of November, 2009 by the following vote: AYES : NAYS : ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK ADMINISTER OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA