Loading...
2004-039- Awarding A Construction Contract With Jjr Construction Inc. For Project 03-49 Curb, Gutter And Sidewalk Repair And Replacement For Fiscal Year 2003-04RESOLUTION 2004 - 39 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AWARDING A CONSTRUCTION CONTRACT WITH JJR CONSTRUCTION, INC. FOR PROJECT 03-49 CURB, GUTTER, AND SIDEWALK REPAIR AND REPLACEMENT FOR FISCAL YEAR 2003-04 WHEREAS, bids were sought in conformance with State and Town law for Project. ~No. 03-49 -Curb., Gutter, and Sidewalk Repair and Replacement for Fiscal Year 2003-04; and WHEREAS, JJR Construction, Inc. submitted. the .lowest bid which the Town Council deems to be responsive to the Town's solicitation. NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town of Los Gatos,. County of Santa Clara, State of California, that JJR Construction, Inc. is declared to be the lowest responsible bidder for Project No.03-49 -Curb, Gutter, and Sidewalk Repair and Replacement for Fiscal Year 2003-04. BE 3T FURTHER RESOLVED that the Town Manager is hereby authorized and directed to execute a construction contract {Attached as Exhibit A) for said project on behalf of the Town in the amount of $184,925.00. BE IT FURTHER RESOLVED, that staff is authorized to .execute future change orders, as necessary, up to an amount of $80,000. PASSED .AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 5`" day of April, 2004, by the following vote: COUNCIL MEMBERS: AYES: Sanely Decker, Diane McNutt, Joe Pirzynski, Mike Wasserman, Mayor Steve Glickman. NAYS.: None ABSENT: None ABSTAIN: None ATTEST: ,~,_ SIGNED: MAYOR OF THE TOWN OF :LOS GATOS/ LOS GATOS, CALIFORNIA c:w.~__ ~....~.~ l/ f`,- ,: "1 ~~~~1~ CLERK OF THE TOWN OF LOS G' TO LOS GATOS, CALIFORNIA ~~N1"t~A~°T THIS AGREEMENT is between the Town o~'Las Gatos (hereinafter referred to as "Owner") and JJR. Construction, I~aC. (hereinafter referred to as "Contractor"). Owner and Contractor, far the consideration hereinafter named, agree as follows: A. SCOPE ®r vvoRl~ Contractor shall furnish all materials and perform all oftlae work for the conshuction afProject #43- 49 -Curb, Gutter, ~z Sfdewalk Repair and Replacement far fiscal year 2003-04 in accordance with the Contract Documents. S. CONTRACT PRICE As full compensation for funv.shing all materials and for doing all the work contemplated and embraced in this Contract, :also for all loss ar damage arising out aftl~e nature ofthe work aforesaid, or .:from the actions of the elements, or fiom any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution oftlie work until its acceptance by Owner, and for all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfi~lly completing the. W ork, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay hundred eightyfour thousandnine hundred twenty five dollars ($184,925.00), which shall supersede any other amount specified in the Contract Documents. C. CONTRACT DOCUMENTS All rights and obligations of Owner and Conhactor are fully set forth and described in the Conti act Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part .and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. Tli.e Contract Documents are defined in Part I, Section 1-1.01(A) of these Specifications and are incorporated herein by reference the same as though set out in full. D. BEGINIVXNG OF WORD Following the .execution of this Contract and the .approval of bonds and insurance policies and certificates, Owner shall issue a Notice to .Proceed with the Worlc. Commencing work or the entrance of equipment or materials on the site of the Work byContractor before receipt of the Notice to Proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. E. TIME OF COMPLETIOI~T The Work called for herein shall be fully completed within SEVENTY(7~) working days of Contractor's receipt oftlie Notice to Proceed'. Exhibit A F. CORRECTYON OF WORTS AFTER ACCEPTANCE AND FINAL PAVIi~TENT 13Y T1~WN Contractor shall remedy any defects due to faulty materials and/or workmanship and ;pay for any damages to other work andlox existing facilities resulting therefrom which shall appear within a period of 2 years from the date of recording ofthc Notzce of Compl'etzon. G. LIQUIDATED .DAMAGES The undersigned has .reviewed and is thoroughly familiar with the appropriate -.sections of the Contract and Part I, Section 8-1.03 of these Specf cations pertaining to liquidated damages. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of day of , 20 TOWN OF LOS GATOS, by: Debra J. Figone, Town Manager CONTRACTOR, by: JJR Construction, inc. (Signature) RECOIVIMEND IiY: John E. Curtis Director of Parks and Pablic i~Vorlcs JJR Construction, Inc. {Print Name) 120 9`~' Avenue (Address) San Mateo, CA 944Q2 , (City, State, Zip) APPROVED AS T® FORM: Orry P. Korb, Town Attoniey (Contractor's License Number) ATTEST: Marian V. Cosgrove, Town Clerk U .~ A U ~~ ~® a M O a y N ~ ~ v ~ ~ M 3a•~ a a o ~,~~ c~ ~ ~ w o ~~H .a` a U ~ ~y~, [-°+ ~ U w O E .~ .. °°5' N ~ '~ a~~ O ~ ~~ ~o v~ ss 3 .'~~,~a o~ •~ .~8 Attachment ~