Loading...
17 Staff Report - FY 2001/10 Streets Repair and Resurfacing ProgramN MEETING DATE: 6115109 ITEM NO. COUNCIL AGENDA REPORT DATE: MAY 22, 2009 TO: MAYOR AND TOWN COUNCIL R~ te FROM: GREG LARSON, TOWN MANAGER 60 SUBJECT: PROJECT NO. 09-I OB - FY 2009110 STREET REPAIR AND RESURFACING PROGRAM 411-811-9901 ADOPT RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR FY 2009/10 STREET REPAIR AND RESURFACING PROGRAM BASE REPAIR AND DIGOUT AND AUTHORIZING STAFF TO ADVERTISE FOR BIDS RECOMMENDATION: Adopt a Resolution approving plans and specifications for FY 2009110 Street Repair and Resurfacing Program Base Repair and Digout and authorizing staff to advertise for bids. BACKGROUND: The adopted FY 2008/09-2012113 Capital Improvement Program designates funding for the Street Repair and Resurfacing Program, This is an ongoing annual project for street rehabilitation throughout the Town to enhance vehicular safety and to maintain the Town's roadway infrastructure. The Town's street program is evaluated based on the Pavement Management System (PMS) program. The street program is produced and distributed by the Metropolitan Transportation Commission (MTC), and it is mandated that all Bay Area municipalities use this program. The purpose of this program is to document and monitor the street pavement conditions throughout Bay Area roadways. The MTC allocates funds based on the data received and evaluated by this program. T)TSC'T NSTON_ The Town of Los Gatos has over 100 miles of streets. These streets are divided into three (3) classifications for the purpose of developing a maintenance and rehabilitation program: Arterial, Collector, and Residential. C ( c-, ~ C) PREPARED BY: TODD CAPURSO Director of Parks and Public Works Reviewed by: _ NN Assistant Town Manager Town Attorney Clerk Administrator Finance Community Development N:1PPW1MANAGliMF.NTICOUNCILICOLTNCIL REPORTS12009 reportsUune 15109-I0B.FY2009-10 street.resurfacing.pse.doc PAGE 2 MAY 22, 2009 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 09-10B - FY 2009110 STREET REPAIR AND RESURFACING PROGRAM DISCUSSIONIcont' The street classifications are based on the following factors: traffic volumes, type of traffic, current and projected usage of the street, and location of each street within the Town's overall road network. In order to achieve the most effective program for the Town, specific strategies have been developed for the maintenance and rehabilitation actions based on the classification and condition of each sheet. Staff has developed a systematic process to evaluate and determine which streets require repair and maintenance. This process is the most cost effective method for prioritizing street resurfacing projects, based on the funding allocations. The treatment methods vary from surface treatments (such as chip seal and slurry seal) to asphalt overlay (of varying thicknesses). Using a combination of these treatments, the Pavement Condition Index (PCI) for the Town has been maintained above 73 points for the past several years, which is in the "good" category, as defined by MTC. The resurfacing project presented in this report for Council consideration is to repair the roadway base on a number of Town wide locations that will be receiving an application of slurry seal or asphalt overlay in a separate project. The prompt repairing of failed roadway base sections will help in overall stability of the road and is needed prior to any surface treatments. The base repairs and digouts will be performed on the following streets: Los Gatos Boulevard (from Loma Alta to Blossom Hill Road), University Avenue (from Blossom Hill Road to Lark Avenue), Blossom Hill Road, More Avenue, Alberto Way, and Los Gatos-Saratoga Road. Plans and Specifications for this project are complete and will be available for review in the Clerk Department on Friday June 12 before the Council meeting. If the Town Council approves this project, construction will begin in July 2009. CONCLUSION: It is recommended that the Town Council adopt the attached Resolution approving the plans and specifications for the Street Repair and Resurfacing Program base repair and digout and authorize staff to advertise the project for bids. ENVIRONMENTAL ASSESSMENT: This project is Categorically Exempt pursuant to Sections 15301 (c), and 15303 (e), and 15304 (b) of the State CEQA guidelines. PAGE 3 MAY 22, 2009 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 09-IOB - FY 2009110 STREET REPAIR AND RESURFACING PROGRAM FISCAL IMPACT: There are sufficient funds available for this program as noted in the table below. STREET REPAIR. AND RESURFACING PROJECT 411-81.1-9901 Available Budget FY 2008109 Fiscal Impact Funding GFAR $ 1,253,409 GAS TAX $ 693 TOTALS $ 1,946,633 Expended/ Encumbered Available To Date Balance $ 329,538 $ 923;871 $ 20,160 $ 673;064 . $ 349,698 $ 1,5961935 TOTAL 1,1Xk'1v OIT MES BY-CATEGORY:.m Materials $ 7,898 Project Construction 341,800 .TOTALS $ 349,698 Recent news reports indicate that the Governor is proposing to take Gas Tax receipts from local government- Preliminary indications from the League of California Cities are that this would be a take rather than a loan. Based on estimated gas tax receipts for FY 2009110, this would result in a loss of about $550,000 in revenue for the Town's street repair program. If the state takes the gas tax revenue, there are sufficient reserves in the street repair program budget to cover about one-half of the amount. The remainder would be covered by the Revenue Stabilization reserve or the Town's street program could be reduced accordingly. The final determination of use of reserves or reduced fields will be based on impacts to townwide Pavement Condition Index. Attachments: Resolution approving plans and specifications for FY 2009110 Street Repair and Resurfacing Program Base Repair and Digout and authorizing staff to advertise for bids. Attachment 1 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS APPROVING THE PLANS AND SPECIFICATIONS FOR THE PROJECT 09-10B - FY 2009-10 STREET REPAIR AND RESURFACING PROGRAM AND AUTHORIZING STAFF TO ADVERTISE THE PROJECT FOR BIDS WHEREAS, plans and specifications for the FY 2009-10 Street Repair and Resurfacing Program base repair and digout have been prepared by the Town Engineer and duly filed with the Clerk Administer; and WHEREAS, public improvements are of benefit to the project area or the immediate neighborhood of the project area; and WHEREAS, the Town Council of the Town of Los Gatos has reviewed said plans and specifications. NOW, THEREFORE, BE IT RESOLVED that the Town Council approves the plans and specifications for the FY 2009-10 Street Repair and Resurfacing Program. BE IT FURTHER RESOLVED that the Clerk Administer is hereby authorized and directed to advertise the Street Repair and Resurfacing Program for bids in the manner prescribed by the Town Municipal Code. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on the 15t" day of June, 2009 by the following vote: AYES: NAYS : ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK ADMINISTER OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA