ADOPT ORDINANCE APPROVING A ZONE CHANGE FROM CH TO
CHYD FOR A TWO STORY COMMERCIAL BUILDING WITH
UNDERGROUND PARKING. APN 424-15-045; PLANNED DEVELOPMENT
APPLICATION PD-07-146; NEGATIVE DECLARATION ND-08-06;
PROPERTY LOCATION: 15400 LOS GATOS BOULEVARD; PROPERTY
OWNER: SI-IP NEWARK LLC; APPLICANT: KENNETH RODRIGUES &
PARTNERS
RECOMMENDATION:
Adopt ordinance approving a the Town Code effecting a zone change from CH to CH:PD for
property located at 15400 Los Gatos Blvd.
DISCUSSION:
On June 1, 2009, Council voted to introduce an ordinance amending the Town Code to effect a
zone change from CH to CHYD for property located at 15400 Los Gatos Blvd. This ordinance
allows for a platmed developinent to construct a new commercial building on that property.
Adoption of the ordinance completes Council's action on this matter. The ordinance amending
the Town Code becomes effective 30 days after adoption.
Council also gave the following direction to staff and the Planning Commission in reviewing the
subsequent Architecture and Site application:
1. A Security Plan for the underground parking shall be submitted as part of the
Architecture and Site application.
2. The parapet of the first floor leg fronting Los Gatos Boulevard and Gateway Drive
shall not exceed nineteen feet.
Attac[>inents: Proposed Ordinance
Map of Zone Change
PREPARED BY: ORRY P. KORB, T OWN ATTORNEY :LMBAvp CKUI Y\Resos& ordsuReponsURcpcrn Ord 150D I G Wvd.wpd]
Reviewed by: own Manager QSS Assistant Torn Manager Clerk
Finance Community Development
Rev: 619109 12:17 pm
Reformatted: 7/19/99 ri leg 301-05
(61512009) Aileen Lee - 1 5400LGB.doc Page 1
O]MINANCE OF THE TOWN OF LOS GATOS
AMENDING THE TOWN CODE EFFECTING A ZONE CHANGE
FROM CH TO CH:PD FOR PROPERTY AT
15400 LOS GATOS BOULEVARD (APN 424-15-045)
THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DOES ORDAIN AS
FOLLOWS:
SECTION I
The Town Code of the Town of Los Gatos is hereby amcrnded to change the zoning on
property at 15400 Los Gatos Boulevard (Santa Clara County Assessor Parcel Numbers 424-15-
045) as shown on the nlap attached hereto as Exhibit A, and is part of this Ordinance, from CH
(Restricted Highway Commercial) to CH:PD (Restricted Highway Cornriiercial, Planned
Development).
SECTION II
The PD (Planned Development Overlay) zone established by this .Ordinance authorizes
the following:
1. Construction of a 40,000 square foot two story commercial building.
2. Landscaping, parking, and other site improvements shown and required on the Official
Development Plan.
3. Uses permitted are those specified in the underlying CH (Restricted Highway
Commercial) zone by Sections 29.60.420 (Permitted Uses) and 29.20.185 (Conditional
Uses) of the Zoning Ordinance, as those sections exist at the time of the adoption of this
Ordinance, or as they inay be amended in the future, subject to any restrictions or other
requirements specified elsewhere in this ordinance including, but not limited to, the
Official Development Plan. However, no use listed in Section 29.20.185 is allowed
unless specifically authorized by this Ordinance, or by Conditional Use Permit. The first
floor shall contain a minim-urn of 8,500 square feet of retail or restaurant space in the
single story leg fronting on Los Gatos Boulevard.
Page 1 of 19
(6/512009) Aileen Lee - 15400LGB.doc Page 2 1
SECTION III
COMPLIANCE WITH OTHER DEVELOPMENT STANDARDS
All provisions of the Town Code apply, except when the Official Development Plan
specifically shows otherwise.
SECTION IV
Architecture and Site approval is required before construction and site improvement
construction work is performed, whether or not a permit is required for the work and before any
permit for construction is issued. Construction permits shall only be in a manner complying with
Section 29.80.1' ) 0 of the ']'own Cade.
SECTION V
The attached Exhibit A (Map), and Exhibit B (Official Development Plans), are part of
the Official Development Plan. The following conditions must be complied with before issuance
of any grading, or construction permits:
TO `l'HE SATISFACTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT:
Planning Division
1. APPROVAL: This application shall be completed in accordance with all of the conditions of
approval listed below and in substantial compliance with the plans approved and noted as
Attachment 9 of the report to the Town Council for the June 1, 2009 meeting. Any changes
or modifications made to the approved plans shall be approved by the Director of Community
Development, Development Review Committee, Planning Commission or the Town Council,
depending on the scope of the change(s).
2. TOWN INDEMNITY: Applicants are notified that Town Code Section 1.10.115 requires that
any applicant who receives a permit or entitlement from the Town shall defend, indemnify,
and hold harmless the Town and its officials iii any action brought by a third party to
overturn, set aside, or void the permit or entitlement. This requirement is a condition of
approval of all such permits and entitlements whether or not expressly set forth in the
Page 2 of 19
(61512009) Aileen Lee - 15400LGB:doc Page 3
approval, and may be secured to the satisfaction of the Town Attorney.
3. ARCHITECTURE AND SITE REQUIRED: An Architecture and Site application and
approval is required for the proposed building, parking lot improvements, and other site
improvements. The Development Review Committee shall be the deciding body for the
Architecture and Site application.
4. HEIGHT: The height of the structure shall not exceed 36 feet and the height of the
architectural elements shall not exceed 39 feet.
5. REAR SETBACK: The rear setback along Carlton Avenue shall not be less than twenty feet.
6. BENEFIT ASSESSMENT DISTRICT: The property owner agrees to participate in the
Benefit Assessment District for Los Gatos Boulevard should one be created by Town
Council.
7. DEMOLITION: The demolition of the existing hazardous structures shall occur within 30
days of the adoption of this ordinance,
8. WATER CONSERVATION ORDINANCE REQUIREMENT. The proposed landscaping
shall meet the Town of Los Gatos Water Conservation Ordinance. A review fee based on the
current fee schedule adopted by the Town Council is required when working landscape and
irrigation plans are submitted for review prior to the issuance of a building permit.
9. *BIOLOGICAL RESOURCES MITIGATION MEASURE #l: All reconunendations made
by Arbor Resources shall be implemented to eliminate or minimize the construction-related
impacts on the trees to be retained. Refer to the report prepared by Arbor Resources dated
March 20, 2008for details.
10. *CULTURAL RESOURCES MITIGATION MEASURE 41: Construction personriel
involved in earth moving shall be alerted to the potential for discovery of prehistoric
materials and in particular, concentrations of historic artifacts. Prehistoric archaeological
resources could include but not be limited to the following: darker than surrounding soils of a
friable nature, concentrations of stone, bone or fresh water shellfish, artifacts of these
materials, and evidence of fire (ash, charcoal, fire alerted earth or rock) and of course, burials,
both human and animal.
11. *CULTURAL RESOURCES MITIGATION MEASURE #2: In the event that archaeological
Page 3 of 19
(6/512009) Aileen Lee - 15400LGB.doc
Page 4 .
traces'are encountered, all construction within a 20-foot radius of the find shall be halted, the
Community Development Director shall be notified, and an archaeologist shall be retained to
examine the find and make appropriate recommendations.
12. *CULTURAL RESOURCES MITIGATION MEASURE 0): In the event that it appears
further earthmoving will affect a resource eligible for the California Register of Historic
Resources (CRIIR), a plan for evaluation of the resource through limited hand excavation
should be submitted to the Town's Community Development Department for approval. If
evaluative testing demonstrates that the project will affect a CRIIR eligible resource, a plan
for the mitigation of impacts to the resource should be submitted to the Connnunity
Development Department for approval before construction is allowed inside the zone
designated as archaeologically sensitive.
13. *CULTURAL RESOURCES MITIGATION MEASURE 44: If the Community
Development Director finds that the archaeological find is not a significant resource, work
will resume only after the submittal of a preliminary archaeological report and after
provisions for reburial and ongoing monitoring are accepted. Provisions for identifying
descendants of a deceased Native American and for reburial will follow the protocol set forth
in CEQA Guidelines Section 15064.5(e). If the site is found to be a significant
archaeological site, a mitigation program will be prepared and submitted to the Community
Development Director for consideration and approval, in conformance with the protocol set
forth in Public Resources Code Section 21083.2.
14. *CULTURAL RESOURCES MITIGATION MEASURE #5: A final report shall be prepared
when a find is determined to be a significant archaeological site, and/or when Native
American remains are found on the site. The final report will include background
information 017 the completed work, a description and list of identified resources, the
disposition and curation of these resources, any testing, other recovered information, and
conclusions.
15. *GEOLOGY AND SOILS MITIGATION MEASURE #1: The recommendations of the
geoteclnnical report by CEG in July 31, 2008 shall be incorporated in the final construction
plans for the proposed project. These recommendations address site preparation, earthwork
Page 4 of 19
f (615!2009) Aileen Lee - 15400LGB.doc Page 5
operations, drainage, and fo- uidations,
16. *HAZARDS AND HAZARDOUS MATERIALS MITIGATION MEASURE #l: The project
applicant and/or Town shall prepare a management plan to identify all suspected hazardous
materials and specify applicable regulations that would determine appropriate handling and
disposal of these materials. For suspected hazardous materials (contaminated soil and
groundwater) that may be encountered during construction, the management plan shall
include contingency plans for site safety, worker protection, sampling and investigation, and
disposal and remediation; these shall be based on soil and groundwater sampling and testing
that have been completed to date. The management plan shall be filed with the Town of Los
Gatos and all other jurisdictional agencies prior to issuance of the demolition and grading
permits.
17. *HAZARDS AND HAZARDOUS MATERIALS MITIGATION MEASURE. #2: If
groundwater is encountered during project construction and dewatering is required, the
project applicant shall undertake sampling and testing of the encountered groundwater in
accordance with the contingency sampling and investigation plan as specified in Measure
#15. If groundwater is found to contain contan-iinants that exceed regulatory action levels, it
may not be discharged into the existing storm drainage system. Removal and handling of the
contaminated groundwater shall be done in a manrier acceptable to the RWQCB, the Town,
and other jurisdictional agencies.
18. COMPLIANCE MEMORANDUM: A memorandum shall be prepared and submitted with
the building permit and/or final subdivision map detailing how the Conditions of Approval
will be addressed.
Building Division
19. *HAZARDS AND HAZARDOUS MATERIALS MITIGATION MEASURE #3, A state
certified lead-based paint professional shall be retained to perform a lead-based paint survey
of the existing structures and the recommendations of the professional shall be followed for
abatement of any identified lead-based paint prior to demolition of the structures.
20. PERMITS REQUIRED: A building permit shall be required for the new commercial
Page 5 of 19
(615/2009) Aileen Lee - 15400LGB.doc Page 1
building. Separate permits are required for electrical, inechanical, and plumbing work as
necessary.
21. CONDITIONS OF APPROVAL: The Conditions of Approval must be blue-lined in full on
the cover sheet of the construction plans. A Compliance Memorandum shall be prepared and
submitted with the building permit application detailing how the Conditions of Approval will
be addressed.
22. SIZE OF PLANS: For sets of construction plans, maximum size 24" x 36."
23. DEMOLITION REQUIREMENTS: Obtain a Building Department Demolition Application
and a Bay Area Air Quality Management Application from the Building Department Service
Counter. Once the demolition form has been completed, all signatures obtained, and written
verification from PG&E that all utilities have been disconnected, return the completed from
to the Building Department Service Counter with the J# Certificate, PG&E verification, and
three (3) sets of site plans to include all existing structures, existing utility service lines such
as water, sewer, and PG&E. No demolition work shall be done without first obtaining a
permit from the Town.
24. STREET NAMES, HOUSE & SUITE NUMBERS: Submit requests for new street names
and/or house numbers/suite nlunbers to the Building Division prior to submitting lbr the
building permit application process.
25. SOILS REPORT: A soils report, prepared to the satisfaction of the Building Official,
containing foundation and retaining wall design recommendations, shall be submitted with
the building permit application. This report shall be prepared by a licensed civil engineer
specializing in soils mechardes. California Building Chapter 18.
26. SHORING: Shoring plans and calculations will be required for all excavations which exceed
four (4) feet in depth or which remove lateral support from any existing building, adjacent
property or the public right-of-way. Shoring plans and calculations shall be prepared by a
California licensed engineer and shall conform to Cal/OSIIA regulations.
27. BACKWATER VALVE: The scope of this project may require the installation of a salutary
sewer backwater valve per Town Ordinance 6.50.025. Please provide information on the
plans if a backwater valve is required and the location of the installation. The Town oP Los
Page 6 of 19
(6/5/2009) Aileen Lee 15400LGB.doc
Page 7-'
Gatos Ordinance and West Valley Sanitation District (WVSD) requires backwater valves on
drainage piping serving fixtures that have flood level rims less than 12-inches above the
elevation of the next upstream manhole.
28. TOWN FIREPLACE STANDARDS: New wood burning fireplaces shall be an EPA Phase II
approved appliance as per Town Ordinance 1905. Tree limbs shall be cut within 10-feet of
chimneys.
29. SPECIAL INSPECTIONS: When a special inspection is required by CBC Section 1701, the
architect or engineer of record shall prepare an inspection program that shall be submitted to
the Building Official for approval prior to issuance of the building permit. The Town Special
Inspection form must be completely filled-out, signed by all requested parties, and be blue-
lined on the construction plans. Special Inspection forms are available from the Building
Division Service Counter or online at www.losgatosca.gov/buildin .
30. NONPOINT SOURCE POLLUTION STANDARDS SHEET: The Town standard Santa
Clara County Valley Nonpoint Source Pollution Control Program Sheet (or Clean Bay Sheet
2406) shall be part of the plan submittal as the second page. The specification sheet is
available al the Building Division Service Counter for a fee of $2 or at San Jose Blue Print
for a fee.
31. PLANS: The construction plans shall be prepared under the direct supervision of a licensed
architect or engineer. (Business and Professionals Code Section 5538)
32. APPROVALS REQUIRED: The project requires the following departments and agencies
approval before issuing a building permit:
a. Community Development - Plaiming Division: Joel Paulson at (408) 354-6879
b. Engineering/Parks & Public Works Department: Fletcher Parsons at 395.3460
c. Santa Clara County Fire Department: (408) 378-4010
d. West Valley Sanitation District: (408) 378-2407
e. Local School District: The `Down will forward the paperwork to the appropriate
school district(s) for processing. A copy of the paid receipt is required prior to
permit issuance.
f. Bay Area Air Quality Management District: (415) 771-6000
Page 7 of 19
6/5/2009 Aileen Lee - 15400LGB.doc Page 8
33. TITLE 24 - COMMERCIAL: The building shall comply with the latest California Title 24
Accessibility Standards.
34. TITLE 24 RESTAURANT USE: Proper size grease trap shall be required for any restaurant
use. The following agencies will review the grease trap requirements before issuance of the
building permit:
a. West Valley Sanitation District (WVSD): (408) 378-2408
b. Environincntal Health Department: (408) 885-4200
c. Town Public Works Department: (408) 399-7530
35. FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed civil engineer or
land surveyor shall be submitted to the project building inspector at foundation inspection.
This certificate shall certify compliance with the recommendations as specified in the soils
report; and, the building pad elevation, on-site retaining wall locations and elevations are
prepared according to approved plans. Horizontal and vertical controls shall be set and
certified by a licensed surveyor or registered civil engineer for the following items:
a. Building pad elevation
b. Finish floor elevation
c. Foundation corner locations
d. Retaining Walls
TO THE SATISFACTION OF THE DIRECTOR OF PARKS AND PUBLIC WORKS:
Engineering Division
36. *TRANSPORTATION AND TRAFFIC MITIGATION MEASURE #1: The southbound left-
turn lane at Los Gatos Boulevard/Village Square intersection shall be extended to a minimum
of 200 feet to acconunodate the potential queue from project related left-turn movements.
37. `ITRANSPORTATION AND TRAFFIC MITIGATION MEASURE 42: The applicant shall
contribute to the addition of a second eastbound left-turn lane at the Los Gatos
Boulevard/Blossom Hill Road intersection for its incremental share of impact as determined
by the Town Engineer.
38. GRADING PERMIT. A grading permit is required for site grading and drainage. The
Page 8 of 19
(615/2009) Aileen Lee - 15400LGB.doc
grading permit application (with grading plans) shall he made to the Engineering Division of
the Parks & Public Works Department located at 41 Miles Avenue. The grading plans shall
include final grading, drainage, retaining wall location, driveway, utilities and interim erosion
control. Grading plans shall list earthwork quantities and a table of existing and proposed
impervious areas. Unless specifically allowed by the Director of Parks and Public Works, the
grading permit will be issued concurrently with the building permit. The grading permit is for
work outside the building footprint(s). A separate building permit, issued by the Building
Department on E. Main Street is needed for grading within the building footprint.
39. PAD CERTIFICATION. A letter from a licensed land surveyor shall be provided stating that
the building fowidation was constructed in accordance with the approved plans shall be
provided subsequent to foundation construction and prior to construction on the structure.
The pad certification shall address both vertical and horizontal foundation placement.
40. PRECONSTRUCTION MEETING. Prior to issuance of any permit or the commencement of
any site work, the general contractor shall:
a. Along with the project applicant, attend a pre-construction meeting with the Town
Engineer to discuss the project conditions of approval, working hours, site
maintenance and other construction matters;
b. Acknowledge in writing that they have read and understand the project conditions
of approval, and will make certain that all project sub-contractors have read and
understand them prior to commencing work and that a copy of the project
conditions of approval will be posted on site at all times during construction.
41. RETAINING WALLS. A building permit, issued by the Building Department at 110 E. Main
Street, may be required for site retaining walls. Walls are not reviewed or approved by the
Engineering Division of Parks and Public Works during the grading permit plan review
process.
42. SOILS REPORT. One copy of the soils and geologic report shall be submitted with the
grading permit application. A geotechnical review to determine the potential for fault ground
rupture is required. Geotechnical Engineer must review and submit a report on the mapped
faults in the area of the project and evaluate the potential for fault ground rupture and
Page 9
Page 9 of 19
(6!512009) Aileen Lee - 15400LGB.doc T Page 10
seismically induced liquefaction. The soils report shall include specific criteria and standards
governing site grading, drainage, pavement design, retaining wall design and erosion control.
The reports shall be signed and "wet stamped" by the engineer or geologist, in conformance
with Section 6735 of the California Business and Professions Code.
43. SOILS REVIEW. Prior to issuance of any permit, the applicant's soils engineer shall review
the final grading and drainage plans to ensure that designs for foundations, retaining walls,
site grading, and site drainage are in accordance with their recommendations and the peer
review comments. The applicant's soils engineer's approval shall then be conveyed to the
Town either by letter or by signing the plans.
44. PUBLIC IMPROVEMENTS. The following improvements shall be installed by the
developer. Plans for those improvements shall be prepared by a California registered civil
engineer, reviewed and approved by the Town, and guaranteed by contract, Faithful
Performance Security and Labor & Materials Security before the issuance of a building
permit or the recordation of a map. The improvements must be completed and accepted by
the Town before a Certificate of Occupancy for any new building can be issued.
45. TRAFFIC IMPACT MITIGATION FEE (COMMERCIAL) Traffic study is required. The
developer shall pay a fee proportional to the project's share of transportation improvement
needed to serve cumulative development within the Town of Los Gatos. The fee amount will
be based upon the Town Council resolution in effect at the time the building permit
applications are made. The fee shall be paid before the building perinit is issued. The traffic
impact mitigation fee for this project, using the current fee schedule and the preliminary plans
is $184,633.00. The final fee shall be calculated from the final plans using the rate schedule
in effect at the time of the building permit application.
46. LOS GATOS BOULEVARD/GATEWAY DRIVE IMPROVEMENTS: Replace existing
non-LED signals with LED signals. Replace existing 8-inch signal heads with 12-inch signal
heads. Replace existing pedestrian signal heads with LED pedestrian countdown heads.
Replace non-ADA pedestrian push buttons with ADA compliant }gush buttons, Install video
detection for northbound and southbound Los Gatos Boulevard. Replace existing safety
lighting fixture with LED lighting fixture. Construct an ADA wheelchair ramp at the project
Page 1 0 of 19
(61512009) Aileen Lee - 15400LGB.doc Page 11
L__...._._..__-
corner of the intersection.
47. LOS GATOS BOULEVARDNILLAGE SQUARE SHOPPING CENTER
IMPROVEMENTS: Extend the southbound left-turn pocket on Los Gatos Boulevard at the
Village Square Shopping Center to a total length of 220 feet of storage plus an 80-foot
transition. Install a video detection for the extended left-turn pocket.
48. LOS GATOS BOULEVARD/BLOSSOM HILL ROAD MITIGATION FEE: Prior to
issuance of a Building Permit, the developer shall contribute toward the future construction
of a second left-turn lane for eastbound Blossom Hill Road. Actual contribution will be
calculated at the time of building permit application.
49. LARK AVENUE/LOS GATOS BOULEVARD MITIGATION FEE: Prior to issuance of a
Building Permit, the developer shall pay a proportional share of the project specific
intersection mitigation costs. Actual cost will calculated at the time of building permit
application.
50. IMPROVEMENTS: Install a pedestrian crosswalk on the west leg of the Gateway/Carlton
intersection.
51. IMPROVEMENTS: Bicycle Parking Facilities. Install bicycle parking facilities on-site per
VTA's requirement.
52. GENERAL. All public improvements shall be made according to the latest adopted Town
Standard Drawings and the Town Standard Specifications. All work shall conform to the
applicable Town ordinances. The adjacent public right-of-way shall be kept clear of all job
related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm
drainage facilities. The storing of goods and materials on the sidewalk and/or the street will
not be allowed unless a special permit is issued. The developer's representative in charge
shall be at the job site during all working hours. Failure to maintain the public rigbt-of-way
according to this condition may result in the Town performing the required maintenance at
the developer's expense.
53. ENCROACHMENT PERMIT. All work in the public right-of-way will require a
Construction Encroachrrient Permit. All work over $5,000 will require construction security.
54. PUBLIC WORKS INSPECTIONS. The developer or his representative shall notify the
Page 11 of 19
(61512009) Aileen Lee - 15400LGl3.doc
Engineering Inspector at least twenty-four (24) hours before starting any work pertaining to
on-site drainage facilities, grading or paving, and all work in the Town's right-of-way.
Failure to do so will result in rejection of work that went on without inspection.
55. EROSION CONTROL. Interim and final erosion control plans shall be prepared and
submitted to the Engineering Division of the Parks & Public Works Department. A Notice of
Intent (NOI) and Storm Water Pollution Prevention Plan (SWPPP) shall be submitted to the
San Francisco Bay Regional Water Quality Control Board for projects disturbing more than
one acre. A maximum of two weeks is allowed between clearing of an area and
stabilizing/building on ail area if grading is allowed during the rainy season. Interim erosion
control measures, to be carried out during construction and before installation of the final
landscaping shall be included. Interim erosion control method shall include, but are not
limited to: silt fences, fiber rolls (with locations and details), erosion control blankets, Town
standard seeding specification, filter berms, check dams, retention basins, etc. Provide
erosion control measures as needed to protect downstream water quality during winter
months. The grading, drainage, erosion control plans and SWPPP shall be in compliance with
applicable measures contained in the amended provisions C.3 and C.14 of Order No. R2-
2005-0035 of the amended Santa Clara County NPDES Permit.
56. DUST CONTROL. Blowing dust shall be reduced by timing construction activities so that
paving and building construction begin as soon as possible after completion of grading, and
by landscaping disturbed soils as soon as possible. Further, water trucks shall be present and
in use at the construction site. All portions of the site subject to blowing dust shall be
watered as often as deemed necessary by the Town, or a minimum of three times daily, or
apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas, and staging areas
at construction sites in order to insure proper control of blowing dust for the duration of the
project. Watering on public streets shall not occur. Streets will be cleaned by street sweepers
or by hand as often as deemed necessary by the Town Engineer, or at least once a day.
Watering associated with on--site construction activity shall take place between the hours of 8
a.m. and 5 p.m. and shall include at least one late-afternoon watering to minimize the effects
of blowing dust. All public streets soiled or littered due to this construction activity shall be
Page 12
Page 12 of 19
(61512009) Aileen Lee 15400LGB.doc
cleaned and swept on a daily basis during the workweek to the satisfaction of the Town.
Demolition or earthwork activities shall be halted when wind speeds (instantaneous gusts)
exceed 25 MPH. All trucks hauling soil, sand, or other loose debris shall be covered.
57. CONSTRUCTION STREET PARKING. No vehicle having a manufacturer's rated gross
vehicle weight exceeding ten thousand (10,000) pounds shall be allowed to park on the
portion of a street which abuts property in a residential zone without prior approval from the
Town Engineer 15.40.070).
58: SITE DRAINAGE. Rainwater leaders shall be discharged to splash blocks. No through curb
drains will be allowed.
Page 131
59. -NPDES. On-site drainage systems shall include a filtration device such as a bio-swale or
permeable pavement.
60. STORM WATER MANAGEMENT PLAN. A storm water management shall be included
with the grading permit application for all Group 1 and Group 2 projects as defined in the.
amended provisions C.3.d. of Order No. R2-2005.0035 of the amended Santa Clara County
NPDES Permit No. CAS029718. The plan shall delineate source control measures and
BMP's together with the sizing calculations. The plan shall be certified by a professional pre-
qualified by the Town. In the event that storm water measures proposed on the Planning
approval dif.er significantly fiom those certified on the Building/Grading Permit, the Town
may require a modification of the Planning approval prior to release of the Building Permit.
The applicant may elect to have the Planning submittal certified to avoid this possibility.
61. AGREEMENT FOR STORMWATER BEST MANAGEMENT PRACTICES INSPECTION
AND MAINTENANCE OBLIGATIONS. The property owner shall enter into an agreement
with the Town for maintenance of the stormwater filtration devices required to be installed on
this project by `t'own's Storrnwater Discharge Permit No. CAS02974 8 and modified by Order
No. R2-2005-0035. The agreement will specify that certain routine maintenance shall be
perforined by the property owner and will specify device maintenance reporting
requirements. The agreement will also specify routine inspection requirements, permits and
payment of fees. The agrecn3ent shall be recorded prior to release of any occupancy permits.
62. SILT AND MUD IN PUBLIC RIGHT-OF-WAY. It is the responsibility of contractor and
Page 13 of 19
(61512009) Aileen Lee - 15400LGB.doc Page 14
home owner to make sure that all dirt tracked into the public right-of-way is cleaned up on a
daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into
the Town's storm drains.
63. UTILITIES. The developer shall install all utility services, including telephone, electric
pourer and all other communications lines underground, as required by Town Code
§27.50.015(b). All new utility services shall be placed underground. Underground conduit
shall -be provided for cable television service.
64. R=ESTORATION OF PUBLIC IMPROVEMENTS. The developer shall repair or replace all
existing improvements not designated for removal that are damaged or removed because of
developer's operations. lmprovements such as, but not limited to: curbs, gutters, sidewalks,
driveways, signs, pavements, raised pavement markers, thermoplastic pavement markings,
etc. shall be repaired and replaced to a condition equal to or better than the original condition.
Existing improvement to be repaired or replaced shall be at the direction of the Engineering
Construction Inspector, and shall comply with all Title 24 Disabled Access provisions.
Developer shall request a walk-through with the Engineering Construction Inspector before
the start of construction to verify existing conditions.
65. SIDEWALK REPAIR. The developer shall repair and replace to existing Town standards
any sidewalk damaged now or during construction of this project. Sidewalk repair shall
match existing color, texture and design, and shall be constructed per Town Standard Details.
The limits of sidewalk repair will be determined by the Engineering Construction Inspector
during the construction phase of the project.
66. CURB AND GUTTER. The developer shall repair and replace to existing Town standards
any curb and gutter damaged now or during construction of this project. New curb and gutter
shall be constructed per Town Standard Details. The limits of curb and gutter repair will be
determined by the Engineering Construction Inspector during the construction phase of the
Project.
67. DRIVEWAY APPROACH. The developer shall install one (1) Town standard commercial
driveway approach. The new driveway approach shall be constructed per Town Standard
Details.
Page 14 of 19
(615/2009) Aileen Lee - 15400LGB.doc Page 1 j
68. CURB RAMPS. The developer shall construct one (1) curb ramp(s) according to State
Standard Drawings at the crosswalk at Los Gatos Blvd. and Gateway Drive. The actual
"Case" as shown on the standard to be used will be decided by the Engineering Construction
Inspector during the construction phase of the project.
69. FENCING. Any fencing proposed within 200-feet of an intersection shall comply with Town
Code Section §23.10.080.
70. SANITARY SEWER LATERAL. Sanitary sewer laterals are televised by West Valley
Sanitation District and approved by the Town of Los Gatos before they are used or reused.
Install a sanitary sewer lateral clean-out at the property line.
71. SANITARY SEWER BACKWATER VALVE. Drainage piping serving Fixtures which have
flood level rims less than twelve (12) inches (304.8 irirn) above the elevation of the next
upstream manhole and/or flushing inlet cover at the public or private sewer system serving
such drainage piping shall be protected fronn backflow of sewage by installing an approved
type backwater valve. Fixtures above such elevation shall not discharge through the
backwater valve, ruiless first approved by the Administrative (Sec. 6.50,025). The Town shall
not incur any liability or responsibility for damage resulting from a sewer overflow where the
property owner or other person has failed to install a backwater valve, as defined section
103(e) of the Uniform Plumbing Code adopted by section 6.50.010 of the Town Code and
maintain such device in a functional operating condition. Evidence of West Valley Sanitation
District's decision on whether a backwater device is needed shall be provided prior to
issuance of a building permit.
72. OUTDOOR TRASH ENCLOSURES. Outdoor trash enclosures shall be covered. Provide a
sanitary sewer connection to the trash enclosure if a restaurant is proposed.
73. GREASE TRAPS. Meet all requirements of the Santa Clara County Health Department and
West Valley Sanitation District for the interception, separation or pretreatment of effluent.
74. CONSTRUCTION NOISE. Between the hours of 8;00 a.m. to 8,00 p.m., weekdays and 9:00
a.m. to 7:00 p.rn. weekends and holidays, construction, alteration or repair activities shall be
allowed. No individual piece of equipment shall produce a noise level exceeding eighty-five
(85) dBA at twenty-five (25) feet. If the device is located within a structure on the property,
Page 15 of 19
(6/512009) Aileen Lee - 15400LGB.doc Page 16 j
the measurement shall be made at distances as close to twenty-five (25) feet from the device
as possible. The noise level at any point outside of the property plane shall not exceed eighty-
five (85) dBA.
75. GOOD HOUSEKEEPING. Good housekeeping practices shall be observed at all times
during the course of construction. Superintendence of construction shall be diligently
performed by a person or persons authorized to do so at all times during working hours. The
storing of goods and/or materials on the sidewalk and/or the street will not be allowed unless
a special permit is issued by the Engineering Division.
76. TRAFFIC CONTROL PLAN. The project sponsor will be required to work with the
Engineering Division of the Parks and Public Works Department to develop a traffic control
plan for incorporation into the construction bid documents (specifications), and this plan will
include, but not be limited to, the following measures:
a. Construction activities shall be strategically timed and coordinated to minimize
traffic disruption for schools, residents, businesses, and special events. The
schools located on the haul route shall be contacted to help with the coordination
of the trucking operation to minimize traffic disruption.
77. HAULING OF SOIL. Hauling of soil on or off-site shall not occur during the morning or
evening peak periods (between 7:00 a.m. and 9:00 a.m. and between 4:00 p.m. and 6:00
p.m.). Prior to the issuance of a building permit, the developer shall work with the Town
Building and Engineering Department Engineering Inspectors to devise a traffic control plan
to ensure safe and efficient traffic flow under periods when soil is hauled on or off the project
site. Tlus may include, but is not limited to provisions for the developer/owner to place
construction notification signs noting the dates and time of construction and hauling
activities, or providing additional traffic control. Cover all trucks hauling soil, sand, and other
loose debris or require all trucks to maintain at least two feet of freeboard.
TO THE SATISFACTION OF THE SANTA CLARA COUNTY FIRE DEPARTMENT:
79. REQUIRED FIRE FLOW: The fire flow for this project is 7,500 gpm at 20 psi residual
pressure. As an auto►natic fire sprinkler system will be installed, the fire flow has been
Page 16 of 19
(6/512009) Aileen Lee - 15400LGB.doc Page 17
reduced by 75% establishin an adjusted fire flow of 1,875 gpm at 20 psi residual pressure.
The adjusted fire flow is available from area water mains and fire hydrant(s) which are
spaced at the required spacing.
79. AUTOMATIC FIRE SPRINKLERS: Approved automatic fire sprinklers are required in all
new and existing modified buildings when gross floor area exceeds 3,600 square feet or that
are 3 or more stories ul height. A State of California licensed (C-16) Fire Protection
Contractor shall submit plans, calculations, a completed permit application and appropriate
fees to this department for review and approval prior to beginning their work.
80. PUBLIC FIItE HYDRANT(S): Provide 3 public fire hydrant(s) at location(s) to be
determined jointly by the Fire Department and San Jose Water Company. Maximum fire
hydrant spacing shall be 250 feet, with a minimum single hydrant flow of 1,875 gpm at 20 psi
residual pressure. If area fire hydrant(s) exist, reflect their location on the civil drawings
included with the building permit submittal.
81. PRIVATE ON-SITE FIRE HYDRANT: Provide one on-site fire hydrant installed per NFPA
Standard 1124, at a location to be determined by the Fire Department. Maximum hydrant
spacing shall be 250 feet, with a minimum acceptable flow of 1,875 gpm at 20 psi residual
pressure. Prior to design, the civil engineer shall meet with the fire department water supply
officer to jointly spot the required fire hydrant location.
82. ON-SITE PRIVATE FIRE SERVICE MAINS AND/OR HYDRANT: Installation of private
fire service mains and/or fire hydrants shall conform to Mational Fire Protection Association
Standard 924 and Fire Department Standard and Details and Specifications W-2. If the
supply piping is "combined" (sprinkler system and hydrants), a U.L, approved 4-way FDC
shall be provided. A separate installation permit from the fire department is required.
83, HOSE VALVES/STANDPIPES: Buildings 3 stories or more in height or where emergency
access has been deemed minimal shall be equipped with standpipes designed per NFPA
Standard 914 and be equipped with 2 '/2" hose valves located within the stair enclosure(s),
specifically within parking structures at stairwells.
84. FIRE APPARATUS ACCESS: Provide access roadways with a paved all-weather surface
with a minimu rn unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches,
Page 17 of 19
(61512009) Aileen Lee - 15400LGB.doc Page 18
minimum circulating turning radius of 36 feet outside and 23 feet inside, and a maximum
slope of 15%. For installation guidelines refer to Fire Depc-a-tment Standard Detail and
Specifications sheet A-1. Identify all required dimensions on the site access plans.
85. FIRE LANE MARKING: Provide marking for all roadways within the project. Installations
shall also conform with Local Goveriunent Standards and Fire Department Standard Details
and Specifications A-6.
86. ACCESS: Gates across the emergency access roadways shall be equipped with an approved
access device. If the gates are operated electrically an approved Knox key switch shall be
installed; if they are operated manually then an approved Knox padlock shall be installed.
87. EMERGENCY GATE/ACCESS GATE: Gate installations shall conform with Fire
Department Standard Details and Specification 6-1 and where open shall not obstruct any
portion of the required width for emergency access roadways or driveways. Locks, if
provided, shall be fire department approved prior to installation.
88. COMMUNITY BENEFIT: Applicant shall install improvements identified as the four
community benefits on page 9, item K, of the Town Council Staff Report dated May 26,
2009. The new traffic calming crosswalk across Carlton Avenue at Gateway Drive leading to
the park shall be combined with additional traffic calming devices, to be determined by the
Town upon consultation with the community, for an additional amount to be paid by the
applicant not to exceed twenty-five thousand dollars ($25,000.00).
Page 18 of 19
(6/512009) Aileen Lee - 15400LGB.doc Page 19
SECTION VI
This Ordinance was introduced at a regular meeting of the Town Council of the Town of
Los Gatos on June 16, 2008, and adopted by the following vote as an ordinance of the Town of
Los Gatos at a meeting of the Town Council of the Town of Los Gatos on
2008 and becomes effective 30 days after it is adopted.
COUNCIL MEMBERS:
AYES:
NAYS:
ABSENT:
ABSTAIN:
SIGNED:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
N.WF%r ORDS5347MASSOLDOC
Page 19 of 19
(61512009) Aileen Lee - 15400LGB.pdf Page 1
/O
15400 L o, §,.G ato s, Bo u l evard
I TOWN OF LOS GATOS I
Application No. PD-07-146 A.P.N. #424-15-045
Change of zoning map amending the Town Zoning Ordinance.
® Zone Change From: CH To: CH: PD
❑ Prozonin
Forwarded by Planning Commission Date: May 13, 2009
Approved by Town Council Date: June 15, 2009 Ord:
Clerk Administrator Mayor