Loading...
04 Staff Report - Fascial Year 2007-08 Annual Street RepairX14 N o !s G ASKS DATE: TO: FROM: COUNCIL AGENDA REPORT DECEMBER 11, 2007 MAYOR AND TOWN COUNCIL MEETING DATE: 12117/07 ITEM NO: PAMELA JACOBS, INTERIM TOWN MANAGER SUBJECT: PPW JOB NO. 07-04 - FISCAL YEAR 2007-08_ ANNUAL STREET REPAIR AND RESURFACING PROJECT 0 352 ADOPT RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR THE ANNUAL STREET REPAIR AND RESURFACING PROJECT AND AUTHORIZE STAFF TO ADVERTISE THE PROJECT FOR BID RECOMMENDATION: Adopt resolution approving plans and specifications for the Annual Street Repair and Resurfacing project and authorize staff to advertise the project for bid. BACKGROUND: In Fiscal Year 2001/02 the Town Council acknowledged the importance of improving the condition of Town streets and approved allocation of resources to achieve this objective. The adopted Capital Improvement Program designates funding for the Street Repair and Resurfacing Program and is consistent with the Town's goals to improve public safety and to improve the quality of Town streets. DISCUSSION: The Town of Los Gatos maintains 102 lane miles of streets and alleys. Although most of the streets are built to last for over 25 years, they begin to deteriorate from the moment they are constructed. Streets with a lot of traffic, particularly heavy truck traffic, deteriorate more rapidly than streets in residential neighborhoods. Every year, paving priorities are established to best utilize the available limited funding for the greatest long-term value. With limited resources for staff-conducted preventive maintenance work, the demand for road repair and resurfacing is increasing. fF,F . PREPARED BY: KEVIN ROHANI Interim Director of Parks and Public Works N:AENGINEERING\COUNCIL REPORTS\07-04. FY07-08.annual. street, repair.resurfp&s.doe 1 Reviewed by: Assistant Town Manager own Attorney Clerk Administrator ` - Finance 40-M31munity Development PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 07-04 - FISCAL YEAR 2007-08 ANNUAL STREET REP AND RESURFACING PROJECT 0352 DECEMBER 11, 2007 To facilitate this process, the Town has a computerized Pavement Management System (PMS) which assists staff in tracking and prioritizing the maintenance needs of all Town streets. The PMS is based upon the proven concept that it is far less costly to proactively maintain streets rather than allow them to deteriorate to the point of needing costly reconstructions. The program produces a list of streets and treatments that will optimize results within a given budget. The list of streets the program generates is then visually inspected for pavement condition based upon a number of factors including cracking, rutting and wear. The appropriate pavement repair method is then determined and a cost estimate for that repair method is calculated. This repair cost is factored into the traffic load carried by the street to determine a cost/benefit ratio for the pavement repairs. This results in the most efficient use of available funding rather than relying on a simplistic "worst-first" method. All streets are therefore scheduled for repairs using an objective method of prioritization. A final street maintenance program is then put together for the year that optimizes the given budget. As a result of this process, staff has developed the following list of streets to receive treatment: Chip seal (Almond Blossom Court, Almond Blossom Lane, Capri Drive, Castlewood Drive, Dardanelli Lane, Harwood Court, Teakwood Avenue, Teakwood Court, Weldwood Avenue, Weldwood Court) Asphalt Overlay (Central Avenue, Central Court, Grove Street, Jackson Street, Lester Lane, Oak Hill Way, Orchard Street, Vasona Avenue, W. Central Avenue). Since overlay and chip seal can be done during the spring while slurry seal work has to be done in the summer, the current program splits the work into two phases. The construction documents presented to the Council with this report is for the asphalt overlay and chip seal phase. In spring 2008, staff will bring the slurry seal construction phase to the Council for approval and authorization to bid. Plans and Specifications for this project are complete and will be available for review in the Clerk Department on the Friday before the Council meeting. If Council approves this project, it will be advertised, a construction contract will be presented for Council for award on February 4 2008, and construction is anticipated to begin in April 2008. CONCLUSION: It is recommended that the Council adopt the attached Resolution approving plans and specifications for the Annual Street Repair and Resurfacing project and authorize staff to advertise the project for bids. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. PAGE 3 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 07-04 - FISCAL YEAR 2007-08 ANNUAL STREET REPAIR AND RESURFACING PROJECT 0352 DECEMBER 11, 2007 FISCAL IMPACT: The construction cost estimate for the chip seal and asphalt overlay phase of this project is $950,000. The FY 2007-08 Capital Improvement Program approved $1,444,200 for Annual Street Repair and Resurfacing. Expenditures and encumbrances to date for engineering design total $41,589. There is sufficient funding for this phase of the project, with a remaining balance of $152,611 for phase two. The following chart describes the project's funding and estimated expenditures: FY 2007/08 Fiscal Impact Project: 400-0352 (GFAR) Project: 4400-45305 (Prop 113) Project: 480-0352 (Gas Tax) TOTALS FY 07/08 STREET REPAIR AND RESURFACING PPW Job # 07-04 Expended/ Phase One Budget Encumbered Estimated Funding To Date Expenditures 4601000 - 307 389 184,200 - 500,000 41,589 1,144,200 41,589 184,200 458,411 950,000 Remaining Balance 152,611 152,611 TOTAL EXPENDITURES BY CATEGORY: Staff Labor - Materials - - Engineering Design 41,589 - Construction - 950,000 Construction Contingency - - TOTALS 41,589 950,000 Attachments: Resolution approving plans and specifications for the Annual Street Repair and Resurfacing project. RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS APPROVING THE PLANS AND SPECIFICATIONS FOR PPW JOB NO. 07-04 - FISCAL YEAR 2007-08 ANNUAL STREET REPAIR AND RESURFACING PROJECT AND AUTHORIZE STAFF TO ADVERTISE THE PROJECT FOR BIDS WHEREAS, plans and specifications for the Annual Street Repair and Resurfacing project have been prepared by the Town Engineer and duly filed with the Clerk Administrator; and WHEREAS, the Town Council of the Town of Los Gatos has reviewed said plans and specifications. NOW, THEREFORE, BE IT RESOLVED THAT the Town Council hereby approves the plans and specifications for the Annual Street Repair and Resurfacing project. BE IT FURTHER RESOLVED THAT the Clerk Administrator is hereby authorized and directed to advertise the Annual Street Repair and Resurfacing project for bids in the manner prescribed by the Town Municipal Code. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on the 17th day of December, 2007 by the following vote: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA