Existing Conditions Analysis
01-020
Town of Los Gatos, California
Existing Conditions Analysis
Last Updated December 23, 2002
ANDERSONBRULÉARCHITECTS
...............................
ðÍÉõÛÈÍÉùÓÆÓÙù×ÎÈ×ÊÛÎØðÓÚÊÛÊÃéÈÊÛÈ×ÕÓÙïÛÉÈ×ÊìÐÛÎ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛéÌÛÙ×ìÊÍÕÊÛÏ
èÛÚÐ×ÍÖùÍÎÈ×ÎÈÉ
èÛÚÐ×ÍÖùÍÎÈ×ÎÈÉ
Section Page
A.Executive Summary....................................................................................2
B.Civic Center Observations..........................................................................3
C.Neighborhood Center Observations..........................................................10
D.Recreation Building Observations............................................................13
E.Service Center Observations.....................................................................15
F.Limitations of Structural Review..............................................................19
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
÷Ä×ÙÇÈÓÆ×éÇÏÏÛÊÃ
÷Ä×ÙÇÈÓÆ×éÇÏÏÛÊÃ
[[224,510,691,567][12][B,I,][Times New Roman]]Executive Summary
This Existing Conditions Analysis has been prepared in conjunction
with the Los Gatos Civic Center Master Planning Process. The intent of
this report is to establish an overview analysis of existing Civic
Facilities located on two main sites. Analysis was made by engineers in
the following disciplines: building structure, building systems,
(mechanical, electrical, and plumbing) and site infrastructure (civil
engineering). Information was gathered by review of existing
documentation on the facility, (when available) and visual observations
during a walkthrough of each structure.
The following analysis includes a description and overview of each
facility followed by the observational analysis by discipline. Through
the course of this analysis, a number of key issues were identified which
will need to be addressed in the Master Planning Process. In some
cases, a greater depth of analysis will be required to determine cost and
feasibility of different approaches to facility reconfiguration, adaptive
reuse or expansion.
Key Issues:
1.In all cases, the structures do not appear to meet current seismic
code requirements. In some cases, seismic upgrades to meet current
life safety standards would be prudent for continued long term use
of facilities, with expansion or changes in use requiring upgrades to
meet current code requirements.
2.In many cases, building mechanical systems are reaching the end of
their anticipated life span. Replacement of these aging systems with
new energy efficient equipment may significantly impact the
existing building operations.
3.In general, none of the facilities meets current accessibility
requirements. Although remedial efforts have been undertaken to
provide access to facilities, they do not meet the current legislated
goal of providing equal levels of access to all members of the public.
4.None of the major facilities has the flexibility to readily accept new
technology infrastructure or easily adapt to new use configurations.
5.All of the facilities in the current Civic Center area seem to suffer
from a functional parking shortfall during peak usage times. A
traffic analysis would be required to provide specific data.
It is recommended that further study of the Civic Center structure be
undertaken to understand the cost and feasibility of continued use and/or
expansion of this facility.
2
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,568,898,625][12][B,I,][Times New Roman]]Existing Conditions Summary
Information for the existing conditions analysis was gathered by a
review of the existing facilities comprised of one site visit, non-
destructive visual observations of key features, and preparation of a
narrative description of existing conditions. The facilities were also
evaluated by a team of engineering consultants who evaluated site
infrastructure, building structure and mechanical, electrical and
plumbing systems There full reports are included as support material to
the summary information contained below.
The Los Gatos Existing Conditions Walk-through occurred on Monday,
September 9th from 9:00 - 1:00 with Bruce Smith, a Facilities
Coordinator with the Parks and Public Works Department, who toured
the team through the facilities and provided input. A site walk-through
with the Landscape Architect, Parks and Forestry Superintendent, Tim
th
Boyer, and Bruce Smith took place on Tuesday November 26.
The facilities examined were located on two sites within the Town of
Los Gatos. These included the Civic Center Complex, to include the
Neighborhood Center and the leased Recreation Building on East Main
Street, as well as the R. J. Bryant Service Center located on Miles
Avenue.
[[225,1948,623,2005][12][B,I,][Times New Roman]]Civic Center Site
[[224,2006,823,2063][12][,I,][Times New Roman]]Architectural Observations [[847,2006,922,2063][12][,,][Times New Roman]]1. [[922,2006,1681,2063][12][,,][Times New Roman]]The Civic Center
is located on East [[1643,2006,2341,2063][12][,,][Times New Roman]]Main Street, to the East of Santa
Cruz Avenue, near Los Gatos High School. The complex is located
to the rear of the site, with a park and dense landscaping separating it
from the street. The Complex has mature trees located on the site and
has a main parking lot located to the East and a smaller parking area
located to the West. Pedestrian access is from East Main Street,
through the landscaped area or from the side parking areas.
2.The Civic Center Complex was designed by Stickney A. Hull, AIA,
constructed in 1965 and received recognition as an award winning
design.
3.The Civic Center Complex contains three buildings: City
Administration, the Police Station and the Library. All three
buildings have been constructed around a central raised courtyard
plaza with a fountain at the center. The Town Council Chambers are
located below this plaza, with stairs and ramps leading down from the
surrounding walkways and parking.
4.The Civic Center is constructed of reinforced concrete and is
3
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
interconnected with corridors below grade in the basement level. The
first floor elevation and public entrances of the three buildings are
slightly below the courtyard level. The roof construction of all three
buildings is reinforced concrete. It includes an interior partial raised
roof, approximately six feet above the main roof with clerestory
windows around its perimeter.
5.Building construction type by current 1997, California Building Code
would be Type B & B-2 Type III non-rated. The buildings are
currently not sprinklered nor do they have fire alarm systems.
6.The buildings were upgraded for accessibility in 1996.
7.General Observations:
a.There have been significant changes to seismic and structural
requirements from the time the building was constructed.
Changes include the amount of seismic force that the building
must resist, the details of the column and beam connections,
and openings. Significant renovation or expansion of the
facility could require significant upgrades to the building
structure.
b.Installation of fire sprinklers and fire alarm systems may be
required based on the scope of new work proposed for the
facility.
c.The existing building infrastructure is generally functioning,
but in many cases is reaching the end of its anticipated life
expectancy. The existing mechanical systems do not meet
current energy requirements.
d.The existing concrete construction does not allow upgrades or
retrofits for heating, ventilation, plumbing, electrical, data
communications, systems, except at a high cost.
e.Way finding and orientation is difficult within the facility due
to the large number of entrance points and difficult sightlines.
f.There are ongoing problems with leaks at the roof decks and
plaza level.
g.The Police facility is currently being modified to reduce the
number of holding cells from two to one to conform to current
holding cell requirements.
h.General and specific storage for the Library is currently
located in a house across the parking lot from the Civic
Center.
The subject complex contains three buildings, which include the
[[290,2811,822,2868][12][,I,][Times New Roman]]Structural Observations
administration building, the police station, and the library. All three
buildings have been constructed so that they surround a central raised
4
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
courtyard plaza with a fountain at the center. The civic center was
constructed in 1965 and the three buildings are constructed of reinforced
concrete. All three buildings contain below grade concrete basements.
Foundations consist of spread and continuous footings and the basement
and plaza courtyard is a reinforced concrete slab-on-grade. The first
floor elevation of the three buildings is approximately at the courtyard
level. The roof construction of all three buildings is also reinforced
concrete. It includes an inner partial raised roof, approximately six feet
above the main roof, and contains clerestory windows at its perimeter.
This upper roof slab is square in shape and is supported by a concrete
column at each of its corners (a total of four columns).
The complex is generally in a good state of repair, with few defects of
[[378,1219,823,1276][12][,I,][Times New Roman]]Structural Site Visit
note. However, the team was unable to observe large areas of the
building structure because of the architectural finishes. The following
items were observed:
1.The structural concrete slab above the basement (first floor level)
exhibited a minor amount of cracking. The majority of the
cracking occurs at the police station and library buildings
accompanied by signs of water penetration. The cracks are
typically hairline in width.
2.At the raised concrete roof with the clerestory windows in the
police station building, it was noted that there is a crack with
signs of efflorescence at the column to beam interface at the low
roof level. This crack was apparently caused by movement
during past seismic events and should be more thoroughly
investigated.
3.In the mechanical room at the basement level adjacent to the
building department, mechanical equipment is hanging from the
main floor concrete slab. The equipment has no diagonal bracing
as required to resist earthquake forces. Additionally, a pipe from
a mechanical unit is supported by a 4" diameter column and the
column base plate is not bolted to the concrete slab.
In general, the buildings were well designed and seem to meet the
[[351,2514,822,2571][12][,I,][Times New Roman]]Structural Document
requirements of the 1961 Uniform Building Code. The seismic systems
[[626,2572,789,2629][12][,I,][Times New Roman]]Review
are fairly defined, with load paths to the resisting elements. However
important changes in the building codes subsequent to when the
buildings were designed have occurred. One important change is the
requirement for providing ductile connection design and detailing for the
special moment resisting concrete frames. This requirement would
pertain to the raised roof described in the "Site Visit" section, item no. 2.
5
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
As previously mentioned, important changes to the Uniform Building
[[337,623,822,680][12][,I,][Times New Roman]]Structural Discussion
Code have occurred since the design of these buildings. The special
moment resisting frame has been mentioned. Other important changes
include:
1.An increase in the seismic design base shear coefficient of
approximately 139%. This increase would affect the overall
design of the building's seismic resisting system.
2.Detailing requirements for collector beams to account for
earthquake forces.
3.Diaphragms are now required to be detailed to transfer shear
forces at openings, corners, and changes in elevations.
[[640,1377,789,1434][12][,I,][Times New Roman]]HVAC [[847,1377,2219,1434][12][,,][Times New Roman]]The civic center site is currently served by multiple multi-zone air
handling units located throughout the site. Each air handling system
consists of a central air handler with supply air fan and cooling coil.
Each temperature control zone is served with a dedicated constant
volume supply duct and hot water reheat coil. The cooling and heating
sources are provided by a central 150 ton chilled water system and 2,200
MBH heating water plant with a remote cooling tower. The temperature
control system is standard pneumatic type. A pad mounted packaged air
conditioning unit is serving part of the police building. Several small-
dedicated split-dx type systems have been added to serve the police
dispatch and various server rooms on site.
The systems appear to be adequate for the existing application. The
systems are original and are reaching the end of their expected life. The
existing system is not energy efficient and does not meet current Title 24
energy efficiency requirements. Title 24 does not allow constant volume
reheat systems.
The existing systems include large quantities of dedicated ductwork
located in tight spaces. It would be difficult and costly to incorporate
significant modifications to the existing systems. If significant expansion
or remodel of the existing civic center were undertaken, one would
expect to have to replace the majority of the existing HVAC systems.
Once future use options are defined, additional intensive field
investigation will be required to define the actual HVAC requirements.
[[576,2872,798,2929][12][,I,][Times New Roman]]Plumbing [[847,2872,1583,2929][12][,,][Times New Roman]]The buildings are currently served [[1546,2872,2282,2929][12][,,][Times New Roman]]by
a 2-1/2 domestic water and 4
sanitary waste line. A central gas fired water heater serves the entire site.
6
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
The existing systems appear to be in good working order. The systems
likely can be modified as necessary to accommodate expansion or
revisions to the existing buildings depending on the actual scope. The
existing concrete construction of the buildings will add difficulty to
making modifications.
[[573,935,823,992][12][,I,][Times New Roman]]Electrical [[847,935,1587,992][12][,,][Times New Roman]]The existing facility is serviced by [[1550,935,2354,992][12][,,][Times New Roman]]PG&E
via pad-mounted transformer.
The main service switchboard is at 2000 ampere, 208 volt, 3-phase, 4-
wire, located in the basement of Town Hall building. Power to the Police
department and Library buildings originate from this switchboard.
Distribution panel boards and branch circuit panel boards provide power
to mechanical equipment and all devices and equipment requiring power.
An existing 60 KW diesel engine emergency generator provides
emergency power for selected loads and areas throughout the facility.
The existing lighting is generally provided by fluorescent light fixtures,
lighting control is provided by local light switches in some areas and
occupancy sensors in other areas. There are no exit lights in some areas
and minimum exit lights in other areas. Additional exit lights and
emergency lights should be added in the path of exit. The mounting
height of some of existing devices does not meet ADA requirements.
The buildings presently do not have any fire alarm system. Modification
and addition of devices to the facility is very difficult because of the
building construction. Most additions have been provided by surface
mounted raceway system. The electric service capacity is sufficient for
operation of the existing facility and minor future modifications.
However, any major future additions or modifications may require the
service to be upgraded. Based on the information gathered, the electrical
equipment is presently in good working condition however; they are
reaching their life expectancy.
[[449,2315,823,2372][12][,I,][Times New Roman]]Storm Drainage [[847,2315,2365,2372][12][,,][Times New Roman]]The Civic Center and adjacent developments drain to a bubbler system in
East Main Street. A local system collects drainage from adjacent roads
and the landscaped areas prior to entering the East Main system. A new
pump was recently installed for the depressed area to the rear of the
police facility, and is reportedly functioning well.
The possibility of minor water intrusion to the behind the walls of the
lower part of the building was discussed. If this was the case and the
building was to remain, then new foundation sub drains could be installed
and tied to the local storm drain system.
7
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
The Civic Center sewer flows to the 10 main in East Main Street. No
[[317,569,823,626][12][,I,][Times New Roman]]Sanitary Sewer System
problems were reported for this site. Any required upgrades to the
system would depend on future building occupancy.
The Civic Center is fed from an 8 main in East Main Street, as shown on
[[313,799,823,856][12][,I,][Times New Roman]]Water System and Fire
[[254,856,823,913][12][,I,][Times New Roman]]Protection Water Systems [[847,856,1599,913][12][,,][Times New Roman]]the San Jose Water Company system [[1587,856,2302,913][12][,,][Times
New Roman]] map. No water supply problems
were reported for this site.
The age of the Civic Center is an advantage to the prevalent tree growth.
[[468,1029,822,1086][12][,I,][Times New Roman]]Site Landscape
[[506,1086,823,1143][12][,I,][Times New Roman]]Observations [[847,1086,1569,1143][12][,,][Times New Roman]]There are a number of specimen tr [[1536,1086,2253,1143][12][,,][Times New
Roman]]ees that should require protection
during any new construction. In general the landscape is very well
maintained and the plants are healthy and attractive.
The front lawn area is very inviting, creating a park like setting. The
exposed aggregate sidewalk is in good shape. Algerian ivy is used as a
ground cover on planting beds along the redwood walk. The ivy can
harbor rodents and is very aggressive towards other plants. The parking
area is screened from East Main Street with a 4 hedgerow that is well
trimmed and very effective in screening cars from Main Street views.
The parking islands are typically planted with Star Jasmine, which seems
to work. Some areas are thinned by either pedestrian traffic or shade
from mature trees. The Villa Avenue/Fiesta Way planting corner at the
parking lot is bare, probably due to the Eucalyptus trees.
The entrance to the Civic Center from the parking lot is awkward with
the planting strip/tree wells between the parking and the sidewalk. Pavers
have been installed between trees but have settled or were installed below
top of curb. The current situation may pose a tripping hazard.
The globe-style lighting throughout the site maintains the complexs
connections to the early days, however they are not energy efficient, have
limited effectiveness and are breakable.
There is a rose garden along the pathway to the center and some roses in
the terraced planters up to the brick plaza. Roses in a public landscape
can be problematic with the thorns (safety) and their winter appearance.
The brick plaza is expansive and warm due to the sun it receives. Some
planter pots have been located in the plaza area. The brick paving is
experiencing efflorescence.
The dirt area exiting the brick plaza to the West was apparently a by-
8
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
product of an Oak that was removed from this area in the recent past and
paving has not been reinstalled. The current dirt surface in this area is
also contributing to drainage problems at an area drain located near the
plaza entry. The redwoods in this area are smaller and less full than on
the north side of the Library. It is understood that the ivy had been
choking them prior to its recent removal.
A specimen Cork Oak resides in the West lot completely surrounded by
paving with a makeshift bumper guard protecting it. This tree is unique
to this area and appears to be in good condition.
Pageant Park is located immediately to the South of the civic center,
across the police vehicular drive. Currently, its location and entrance is
difficult to distinguish, the access is steep and it appears to be under
utilized. A screened enclosure for mechanical equipment is located
adjacent to the entrance. The park is surrounded by mature trees and
includes a large terraced rock wall and waterfall constructed by Town
residents. There are informal trails traversing the slope above the park.
The slope behind the Villa house lots and Pageant Park has been left in a
natural (wild) state. This makes the most sense due to the steep areas and
difficulty in any kind of maintenance approach. Remnant walls from an
old winery are built into the steep slope located behind the western
residential structure and adjacent parking area on Villa. The residential
structures on Fiesta Way have a cottage type landscape and are quite
nicely kept.
The dumpsters for the Civic complex are exposed and are sitting on the
pavement at the end of Villa Avenue on the east side of the
Administration Building.
The following is a general list of the tree species on the Civic Center site.
This is not intended to be complete. There are several unique species or
significant specimens, which deserve special consideration in future
planning and have been noted with an asterisk.
Magnolias*
Sweet Gums
Crepe Myrtle
Coast Redwood*(the stand located to the south of the library has been
impacted by the ivy growth)
Giant or Sierra Redwood (one)*
Ginkos
9
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[225,510,623,567][12][B,I,][Times New Roman]]Civic Center Site
Walnut (one at Main Street looks old, sidewalk damage)
Blue Cedars*
Live Oak (The two located in the planter on West side of Police Station are
relatively small and could be relocated.)*
Cork Oak*
Eucalyptus
The irrigation system at the Civic Center has reached the end of its
expected life span and will require replacement in the future. The lawn is
irrigated with small, old, brass heads that are common in residential
systems. There are also galvanized rises sticking up in the planter areas,
which are tripping hazards. The backflow preventer at the Civic Center
along Villa is enclosed in an old makeshift enclosure.
[[562,1325,822,1382][12][,I,][Times New Roman]]Site Issues [[847,1325,922,1382][12][,,][Times New Roman]]1. [[922,1325,1658,1382][12][,,][Times New Roman]]There are a large number of
mature [[1630,1325,2276,1382][12][,,][Times New Roman]] trees on the site, which could
affect the potential development options.
2.Site infrastructure is adequate for the current uses; significant
changes in use would likely require upgrading of theses systems.
3.Site accessibility is limited due to the number and location of steps
and grade changes. Access ramps have been constructed, but do not
always provide direct paths of travel from parking to building
entrances.
4.Increased use of the site would require an analysis to determine the
number of parking spaces for the intended use, modifications to
provide accessibility parking for all primary entrances and
availability and accessibility of off-site parking.
5.Recently purchased houses adjacent to the Civic Center are currently
being rented out or used for storage and were not included in our
evaluation.
[[223,2302,724,2359][12][B,I,][Times New Roman]]Neighborhood Center
[[243,2360,822,2417][12][,I,][Times New Roman]]Architectural Observation [[847,2360,922,2417][12][,,][Times New Roman]]1. [[922,2360,1565,2417][12][,,][Times New Roman]]This is a two-story
concrete bl [[1529,2360,2239,2417][12][,,][Times New Roman]]ock building with a wood roof of
approximately 12,000 square feet. The structure currently houses
offices, meeting rooms and multi-purpose spaces
2.The building has a small frontage on Main Street with the long side
facing the civic center. The building configuration orients the main
entrance toward the civic center, but has limited frontage on East
Main Street.
3.This building has its own parking but it also shares parking with the
civic center complex across Fiesta Way.
4.General Observations:
a.The existing building structure does not meet current seismic
10
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[223,510,724,567][12][B,I,][Times New Roman]]Neighborhood Center
codes although it was upgraded in 1993. Upgrades to the
building structure could be required depending on the extent
of remodeling or additions proposed.
b.Current building systems are adequate and could be reused in
a remodel scenario. Electrical service may need to be
upgraded if more than minor modifications are proposed.
The subject building is a partial two-story structure of approximately
[[385,971,823,1028][12][,I,][Times New Roman]]Structural Building
12,000 square feet. The walls of the structure are concrete block and the
[[534,1029,822,1086][12][,I,][Times New Roman]]Description
roof is wood construction with plywood sheathing. The foundations
consist of spread and continuous footings. The first floor slab is a 4"
concrete slab-on-grade reinforced with #4 at 24" o.c. each way. The
second floor is wood construction with plywood sheathing. Our review
of this building consisted of a walk-through observation of the building
on September 9, 2002, a review of the original drawings prepared by
William W. Hedley Architects dated July 1978 and a review of the
seismic upgrade drawings by the Town of Los Gatos dated April 1993.
Original calculations, a soils report and specifications were not available
for our use.
The building is generally in a good state of repair. However, the team
[[378,1675,823,1732][12][,I,][Times New Roman]]Structural Site Visit
was unable to observe large areas of the building because of
architectural finishes. There were no items of note observed during the
site visit.
In general, the building was well designed and seems to meet the
[[351,1949,822,2006][12][,I,][Times New Roman]]Structural Document
requirements of the 1976 Uniform Building Code. The seismic systems
[[626,2007,789,2064][12][,I,][Times New Roman]]Review
are fairly defined with load paths provided for resisting lateral forces.
However, several important changes in the building codes subsequent to
when this building was designed have occurred. Primary of these are
the requirements for providing anchorage of the concrete block walls to
the roof structure and providing a method for distributing these
anchorage forces into the roof diaphragm. The Town of Los Gatos
upgraded the building in 1993 as indicated in the seismic upgrade
drawings to take care of these conditions. However, in the 1997
Uniform Building Code anchorage forces again increased and it is likely
that the work done in 1993 does not meet these requirements.
Another item of concern is the presence of vertical irregularity of the
second floor shear walls in relation to the first floor shear walls, and the
lack of shear transfer of the lower roof elements to the abutting higher
shear walls extending to the upper roof. Another concern is the lack of
shear transfer blocking below wood shear walls that bear on the second
floor joists. Another item of concern is the lack of diaphragm ties at the
11
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[223,510,724,567][12][B,I,][Times New Roman]]Neighborhood Center
re-entrant corners of the structure.
Several changes to the Uniform Building Code have occurred since the
[[337,680,822,737][12][,I,][Times New Roman]]Structural Discussion
design of this building. The requirements for wall anchorage have
already been discussed. Other important changes include:
1.An increase in the seismic design base shear coefficient of
approximately 70%. This increase would affect the overall
design of the building's seismic resisting system.
2.An increase of approximately 100% for the out-of-plane seismic
design of the concrete block walls and floor/roof to wall
anchorage.
3.Detailing requirements for concrete block wall reinforcing to
take into account larger shear and bending forces.
4.Diaphragms are now required to be detailed to transfer shear
forces at openings, corners, and changes in elevation.
[[640,1568,789,1625][12][,I,][Times New Roman]]HVAC [[847,1568,1599,1625][12][,,][Times New Roman]]The building is currently served by [[1561,1568,2306,1625][12][,,][Times New Roman]]two
constant volume fan-coil units
and ductwork serving the multi-purpose rooms, and ductless wall
mounted fan-coils in the remaining spaces. The cooling and heating is
provided by a central 30-ton air-cooled chiller and gas fired heating
water boiler.
The systems appear to be adequate for the existing application and are
in good operating condition. The existing central chilled and heating
water systems may be re-used if the building is remodeled. If the
building is expanded, the existing chilled and heating water systems
could be expanded to accommodate the increased loads and the existing
fan-coil and duct systems will likely need to be replaced. Once future
use options are defined, additional intensive field investigation will be
required to define the actual HVAC requirements.
[[576,2430,798,2487][12][,I,][Times New Roman]]Plumbing [[847,2430,1536,2487][12][,,][Times New Roman]]The building is currently served [[1499,2430,2200,2487][12][,,][Times New Roman]]by
2-1/2 domestic water and 4
sanitary waste lines. A 1,000-gallon grease interceptor is installed for
the kitchen waste. A gas fired water heater serves the building. The
existing systems appear to be in good working order. The systems
likely can be modified as necessary to accommodate expansion or
revisions to the existing building.
Building is served by PG&E via a pad-mounted transformer located at
[[573,2833,823,2890][12][,I,][Times New Roman]]Electrical
the southwest corner of the building. The main service switchboard is
12
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[223,510,724,567][12][B,I,][Times New Roman]]Neighborhood Center
800 ampere, 208 volt, 3-phase, and 4-wire. Distribution panel boards
and branch circuit panel boards provide power to mechanical equipment
and all devices and equipment requiring power. An existing receptacle
at the exterior of the building is setup for connection to a temporary
portable generator to provide backup power for selected loads in the
building. The existing lighting is generally provided by fluorescent
light fixtures. Local light switches provide lighting control. There is no
automatic shut-off system for lights in the building. There is an existing
lighting control panel in auditorium that provides lighting control and
dimming for the space. There are exit lights and emergency lights
throughout the building. The building does not have any fire alarm
system. The electric service capacity is sufficient for operation of the
existing facility and minor future modifications. However, any major
future additions or modifications may require the service to be
upgraded. Based on the information gathered, the electrical equipment
is presently in good working condition however; they are reaching their
life expectancy.
The landscape at this site is holding up well, with the exception of the
[[468,1604,822,1661][12][,I,][Times New Roman]]Site Landscape
[[506,1661,823,1718][12][,I,][Times New Roman]]Observations [[847,1661,1643,1718][12][,,][Times New Roman]]planting strip along the Fiesta sidewal [[1607,1661,2311,1718][12][,,][Times
New Roman]]k. The planting strip is similar to
some of the problems at the Civic Center site with pedestrian traffic
flows in conflict with the landscape. Again, finish grade may need to be
adjusted to reduce tripping hazards. The landscape along the west
(parking lot side) against the building is particularly dense and could
benefit from some thinning out of the plant materials, especially the
trees. The trash enclosure structure is in an awkward location and in
need of repair.
[[224,2178,693,2235][12][B,I,][Times New Roman]]Recreation Building
[[243,2236,822,2293][12][,I,][Times New Roman]]Architectural Observation [[847,2236,922,2293][12][,,][Times New Roman]]1. [[922,2236,1532,2293][12][,,][Times New Roman]]This is a one-story
hollow bl [[1496,2236,2120,2293][12][,,][Times New Roman]]ock construction structure of
approximately 5,500 square feet of offices and classrooms located
on East Main Street across from the Civic Center. This facility is
leased to the Los Gatos Saratoga Community Education Recreation
for their construction and administration actives
2.General Observations:
a.The building structure may be deficient in a number of areas
related to the masonry walls and the roof connections.
Significant structural work would be required to upgrade this
structure to meet current design standards. Further
investigation would be required to determine if the masonry
walls are hollow and unreinforced or solid with reinforcing.
b.Significant remodeling or expansion of this facility would
13
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,510,693,567][12][B,I,][Times New Roman]]Recreation Building
likely require replacement or upgrades to most building
systems.
c.The parking at this location is inadequate at peak usage
events.
The subject building is a one-story structure of approximately 5,500
[[385,856,823,913][12][,I,][Times New Roman]]Structural Building
square feet. The walls of the structure seem to be concrete block
[[534,914,822,971][12][,I,][Times New Roman]]Description
construction. It is unknown at this time whether the walls are solid
grouted, partially grouted, or ungrouted and unreinforced. The roof is
wood construction. Drawings, calculations, soils report and
specifications were not available for our use since the building is very
old and original documentation apparently does not exist.
The building is generally in a good state of repair. However, the team
[[378,1289,823,1346][12][,I,][Times New Roman]]Structural Site Visit
was unable to observe large areas of the building because of
architectural finishes. There were no items of note observed during the
site visit.
Assuming the building is unreinforced and is hollow block construction,
[[337,1564,822,1621][12][,I,][Times New Roman]]Structural Discussion
the design criteria for unreinforced masonry buildings as outlined in the
Uniform Code for Building Conservation is used. The critical
requirements of this code are as follows:
1.The masonry walls must be anchored to the roof diaphragm.
2.The masonry walls are required to meet certain height to wall
thickness ratios. If this requirement is not met, then bracing
elements connected to the roof and wall may be introduced to
reduce the unsupported wall height.
3.Secondary vertical members may have to be introduced to
provide temporary support for the roof-framing members after a
major seismic event.
4.Parapets may have to be supported with bracing members if they
exceed the height limit described in the UCBC.
5.The masonry walls are required to be analyzed to make sure they
can resist the applied lateral loads described in the UCBC.
If the building walls are reinforced and either partially grouted or fully
grouted, the building still may have a number of deficiencies related to
design of the masonry walls and connection of those walls to the roof
diaphragm.
[[640,2909,789,2966][12][,I,][Times New Roman]]HVAC [[847,2909,2204,2966][12][,,][Times New Roman]]The building is currently served by multiple rooftop packaged air
14
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,510,693,567][12][B,I,][Times New Roman]]Recreation Building
conditioning units. The units were not observed in our walk-thru and
as-built drawings are not available, therefore the condition of the
equipment is unknown. One would expect minor modifications to the
building could be accommodated with the existing equipment.
Significant remodel or expansion of the building will most likely require
new HVAC systems. Once future use options are defined, additional
intensive field investigation will be required to define the actual HVAC
requirements.
[[576,1086,798,1143][12][,I,][Times New Roman]]Plumbing [[847,1086,2201,1143][12][,,][Times New Roman]]The existing plumbing utilities are not observable and no as-built
drawings are available, therefore the capacity and condition of the
existing services cannot be assessed.
[[573,1316,823,1373][12][,I,][Times New Roman]]Electrical [[847,1316,1633,1373][12][,,][Times New Roman]]The existing building electrical system [[1622,1316,2344,1373][12][,,][Times
New Roman]] is old and obsolete. The systems
were not observed in our walk-through and as-built drawings are not
available, therefore the condition of the equipment is unknown. One
would expect minor modifications to the building could be
accommodated with the existing equipment. Significant remodel or
expansion of the building will most likely require new systems. Once
future use options are defined, additional intensive field investigation
will be required to define the actual electrical requirements.
The landscape more at this facility is dominated by the adjacent parking
[[468,1834,822,1891][12][,I,][Times New Roman]]Site Landscape
[[506,1891,823,1948][12][,I,][Times New Roman]]Observations [[847,1891,1580,1948][12][,,][Times New Roman]]lot. The parking lot also serves as [[1543,1891,2287,1948][12][,,][Times
New Roman]]a traffic route for other facilities in
the area. The site configuration of the building and driveway result in
limited landscaping to screen the parking area. The dumpsters are un-
enclosed; sitting at the end of the accessible parking space, also open to
views from Main Street.
The front landscape is clean and simple. It is dominated by a large
Camphor tree that shades the western end of the facility. The rear
landscape is bare. The street trees at the rear of the site are specimen
Melaleuca linariifolia, or Flaxleaf Paperbark. The sidewalks are narrow
on this side, and do not meet ADA clearance standards with the trees at
the back of the curb.
[[224,2580,577,2637][12][B,I,][Times New Roman]]Service Center
[[224,2638,823,2695][12][,I,][Times New Roman]]Architectural Observations [[847,2638,922,2695][12][,,][Times New Roman]]1. [[922,2638,1624,2695][12][,,][Times New Roman]]The Service
Center is located on [[1586,2638,2224,2695][12][,,][Times New Roman]]Miles Avenue, to the West of
Highway 17 and to the East of Santa Cruz Avenue. The Service
Center contains the Administrative Offices, and Shop and
Equipment Buildings.
2.The Service Center Administrative Offices are located in a historic
building, which was moved to its present location. The building has
15
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,510,577,567][12][B,I,][Times New Roman]]Service Center
been upgraded to serve as administrative offices for the Service
Center while maintaining its historic image.
a.General Observations:
i.Some upgrades to the building structure may be
required to meet current requirements
ii.The number and location of interior bearing walls
limits the flexibility of the interior spaces.
iii.Significant remodeling or expansion of this facility
would likely require replacement or upgrades to some
building systems.
3.Shop and Equipment Buildings. These buildings are one-story
concrete block structures of approximately 4,700 square feet. They
are currently being used for shop equipment functions and building
engineering functions.
a.General Observations:
i.Some upgrades to the building structure would be
required to meet current requirements
ii.Significant remodeling or expansion of this facility
would likely require replacement or upgrades to some
building systems.
4.Site Issues:
a.Significant expansion of uses on this site would require
upgrades to the site utility infrastructure.
Service Center Office Building
[[385,1949,823,2006][12][,I,][Times New Roman]]Structural Building
The subject building is a two story wood framed structure. It was
[[534,2006,822,2063][12][,I,][Times New Roman]]Description
pointed out to us that the structure is historic and was moved to the
present site from another location. The foundation was constructed at
the present site to receive the structure and consists of spread and
continuous footings.
Shop and Equipment Building
The subject building is a one-story structure of approximately 4,700
square feet. The walls are of concrete block wall construction. The roof
consists of a wood panelized roof system with plywood roof sheathing.
The floor is a concrete slab-on-grade. Original calculations, soils report,
structural drawings and specifications were not available for our use.
Service Center Office Building
[[378,2707,823,2764][12][,I,][Times New Roman]]Structural Site Visit
The building is generally in a good state of repair. However, the team
was unable to observe large areas of the building because of
architectural finishes. There were no items of note observed during the
site visit.
16
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,510,577,567][12][B,I,][Times New Roman]]Service Center
Shop and Equipment Building
The building is generally in a good state of repair. However, the team
unable to observe large areas of the building because of architectural
finishes. There were no items of note observed during the site visit.
Service Center Office Building
[[337,849,822,906][12][,I,][Times New Roman]]Structural Discussion
As previously mentioned, several changes to the Uniform Building
Code have occurred since this building was constructed. The more
important changes include:
1.An increase in the seismic design base shear.
2.Holdown requirements attaching the shear wall panels to the
foundation.
3.Collectors and chords transferring shear forces.
4.More stringent allowable height to length shear wall ratios.
Shop and Equipment Building
Several changes to the Uniform Building Code have occurred since the
design of the building. Remodeling of this building was performed in
1977; therefore, the construction of the building seems to have been
constructed in the early 70's. The requirements of wall anchorage have
been previously discussed. Other important changes include:
1.An increase in the seismic design base shear, coefficient of
approximately 18% for this structure. This increase would affect
the overall design of the building's seismic resisting system.
2.An increase of approximately 100% for the out-of-plane seismic
design of the concrete block walls and roof to wall anchorage.
[[640,2249,789,2306][12][,I,][Times New Roman]]HVAC [[847,2249,2239,2306][12][,,][Times New Roman]]The historic administrative building is currently served by multiple
packaged air conditioning units. The systems are relatively new and in
good operating condition. Parts of the existing shop buildings are air-
conditioned with packaged air conditioning units. The remainder of the
spaces are provided with various unit heaters and ventilation systems.
Remodel or expansion of the spaces will require new HVAC systems.
[[576,2652,798,2709][12][,I,][Times New Roman]]Plumbing [[847,2652,1579,2709][12][,,][Times New Roman]]The as-built drawings for the yard [[1542,2652,2297,2709][12][,,][Times New Roman]]are
minimal and the capacity of the
existing utilities is not known. If future work is anticipated, intensive
investigation of the existing systems will be necessary.
[[573,2882,823,2939][12][,I,][Times New Roman]]Electrical [[847,2882,1562,2939][12][,,][Times New Roman]]The facility is serviced by PG&E [[1525,2882,2346,2939][12][,,][Times New Roman]]via
pole-mounted service transformers
located on site.
17
ø×Ù×ÏÚ×Ê
ìÛÕ×
÷ÄÓÉÈÓÎÕùÍÎØÓÈÓÍÎÉûÎÛÐÃÉÓÉ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
íÚÉ×ÊÆÛÈÓÍÎÉ
íÚÉ×ÊÆÛÈÓÍÎÉ
[[224,510,577,567][12][B,I,][Times New Roman]]Service Center
The main service switchboard is 600 ampere, 240 volt, 3-phase, and 4-
wire. Distribution panel boards and branch circuit panel boards provide
power to mechanical equipment and all devices and equipment requiring
power. The existing lighting in the shop and maintenance is generally
provided by fluorescent light fixtures. Lighting in the historic building
is combination of ceiling mounted fluorescent and incandescent light
fixtures. Table lamps have been used throughout the building. Lighting
control is provided by local light switches. There is no automatic shut-
off system for lights in any of the buildings. The facility does not have
any fire alarm system. The electric service capacity is sufficient for
operation of the existing facility and some future modifications.
However, any major future additions or modifications may require the
service to be upgraded. The electrical equipment is generally in good
working condition.
[[499,1431,823,1488][12][,I,][Times New Roman]]Water System [[847,1431,1550,1488][12][,,][Times New Roman]]The Service Center is fed from a [[1512,1431,2254,1488][12][,,][Times New
Roman]]3 main, as shown on the San Jose
Water Company system map. No water supply problems were reported
for this site. An expansion of facilities on the Service Center site might
require an upgrade to the size of that service in order to provide
adequate fire protection.
[[317,1776,823,1833][12][,I,][Times New Roman]]Sanitary Sewer System [[847,1776,1593,1833][12][,,][Times New Roman]]It is not clear from the system maps [[1562,1776,2337,1833][12][,,][Times
New Roman]] exactly to where the Service Center
sewer flows. However, no problems were reported for this site. Any
required upgrades to the system would depend on future building
occupancy.
[[468,2063,822,2120][12][,I,][Times New Roman]]Site Landscape [[847,2063,1691,2120][12][,,][Times New Roman]]The old farmhouse and water tower been [[1666,2063,2328,2120][12][,,][Times
New Roman]] successfully incorporated into
[[506,2121,823,2178][12][,I,][Times New Roman]]Observations [[847,2121,1566,2178][12][,,][Times New Roman]]the service center corporation yard [[1542,2121,2275,2178][12][,,][Times New
Roman]] landscape which is crisp and well
maintained. The corporation yard is effectively screened from the street
with the slated chain link fence and planted trees. The Public Works or
Engineering offices are not very noticeable, except for the signage. The
landscape is new, but will be effective for that building with what little
room was available. There is a pedestrian connection to the Los Gatos
Creek Trail through the adjacent Balzer Field.
Parking along Miles Avenue is dominated by a tree service company
that occupies the PG&E substation property. It is not clear at this time
what if any problems occur with that use.
The irrigation system at the Service Center appears to be a fairly recent
installation with Toro pop-up spray heads and is in good condition
18
ø×Ù×ÏÚ×Ê
ìÛÕ×
èÍÅÎé×ÊÆÓÙ×ûÉÉ×ÉÉÏ×ÎÈ
èÍÅÎÍÖðÍÉõÛÈÍÉùÛÐÓÖÍÊÎÓÛ
éÈÊÇÙÈÇÊÛÐíÚÉ×ÊÆÛÈÓÍÎÉ
éÈÊÇÙÈÇÊÛÐíÚÉ×ÊÆÛÈÓÍÎÉ
[[223,625,949,682][12][B,I,][Times New Roman]]Limitations of Structural Review
1.The information given in this report was based on a walk
through of the sites and a review of the drawings, which were
supplied, to our office. The site walk through was brief and was
not intended to be a comprehensive site investigation of the
structure. In most locations, architectural finishes were not
removed to allow our office to view the structure. The drawings
of the structures were sometimes incomplete or nonexistent.
2.Biggs Cardosa Associates make no warranty either expressed or
implied, as to the findings, recommendations, or professional
opinions stated in this report.
3.Biggs Cardosa Associates take no responsibility for the
conformance of the as-constructed structure with the intent of
the design documents.
4.No reliance on this report shall be made by anyone other than
the client whose name appears above.
5.Biggs Cardosa Associates has made reasonable efforts to assure
that this report is accurate; however, BCA cannot assume
liability for damages, which may result from its use, or any
conditions which this report might fail to disclose.
19
ø×Ù×ÏÚ×Ê
ìÛÕ×