Loading...
03 Staff Report - Los Gatos Creek Trail Bridge Deck Replacement,~pW N O,c MEETING DATE: 4/3/06 ITEM NO. !ps•Gp.~pS COUNCIL AGENDA REPORT DATE: MARCH 28, 2006 TO: MAYOR AND TOWN COUNCIL FROM: DEBRA J. FIGONE, TOWN MANAGER SUBJECT: PROJECT NO. 05-06 - AWARD OF CONSTRUCTION CONTRACT FOR LOS GATOS CREEK TRAIL BRIDGE DECK REPLACEMENT A. ADOPT RESOLUTION DECLARING ANDERSON PACIFIC ENGINEERING CONSTRUCTION, INC. TO BE THE LOWEST RESPONSIBLE BIDDER ON THE PROJECT AND AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $53,500 B. AUTHORIZE STAFF TO ISSUE CHANGE ORDERS TO THE CONSTRUCTION CONTRACT UP TO AN AMOUNT OF $5,000 RECOMMENDATION: 1. Adopt Resolution (Attachment 1) declaring Anderson Pacific Engineering Construction, Inc. to be the lowest responsible bidder on the project and awarding a construction contract (Exhibit A) in the amount of $53,500. 2. Authorize staff to issue change orders to the construction contract up to an amount of $5,000. BACKGROUND: This project will repair the wooden deck of the Los Gatos Creek Trail bridge and elevated pathway located between Miles Avenue and the Highway 17 pedestrian overcrossing, directly behind the Old Town Center. The deck has deteriorated due to normal aging, weather, and poor drainage of the deck, compounded with the very high use of this trail section by bicyclists and pedestrians. The bolts that hold the deck to the structure are rusted, have become loose, and have caused trip and fall accidents for pedestrians and flat tires for some bicyclists. In 2005, staff applied for two different grant sources to fund this deck replacement project: TDA Article-3 and State Hazardous Elimination Safety (HES) grant. The TDA funds were recently approved for $10,000, but the HES grant was not approved, due to the competitive nature of those funds. PREPARED BY: JOHN E. CURTIS Director of Parks and Pub1iglWorks Reviewed by: YS\\_Assistant Town Manager Attorney Clerk Administrator IVY- Finance Community Development Revised: 3/30/06 1:03 pm Reformatted: 5/30/02 N:\B&E\C0UNCILREPORTS\05-06.LG.Creek.Trail.Bridge.Deck.Replace.award.wpd PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: PROJECT NO. 05-06 - AWARD OF CONSTRUCTION CONTRACT FOR LOS GATOS CREEK TRAIL BRIDGE DECK REPLACEMENT MARCH 28, 2006 Seeking the additional $55,000 needed to complete this project, staff then applied for Proposition 12 State Bond funds, as the trail is part of the town's park system. That proposal was approved by the State in February, 2006, for $55,000. Together, the approved grant proposals total $65,000 to fund this project. Mid-year budget approved this revised funding source and use of grant funds. DISCUSSION: The new deck will be made of pressure treated lumber and will be fastened to the structure by new bolts that are sunk into the lumber and therefore will eliminate tripping accidents for walkers and joggers, as well as incidents causing flat tires to bicycle riders. The structure will be closed to all trail users during the construction days, while the old deck is removed and the new deck placed in sections. However, we will keep the bridge open after hours for safety purposes, and to accommodate users of the trail who access the Miles Avenue parking lot in the evening. This approach provides a safe condition for the contractor to do his work and will also provide partial use of the bridge for the public. For projects under $75,000 construction costs, the Town's informal bid process does not require public advertising and the preparation of a set of complete plans and specifications for a project. This informal bid process allows staff to prepare a scope of work, solicit bids from four (4) contractors, and award the contract to the lowest bidder. The Town uses this process for small and uncomplicated projects. Bids for the Los Gatos Creek Trail Bridge Deck Replacement were received by the Town Engineer on March 27, 2006. The following contractors submitted bids for this project: GKI Construction $96,000 Duran and Venables $63,560 Anderson Pacific Engineering Construction, Inc. $53,500 It is recommended that the Council adopt the attached Resolution that would declare Anderson Pacific Engineering Construction, Inc. to be the lowest responsible bidder on the project and award a construction contract to this company in the amount of $53,500. Staff has checked all of the bids received and has determined that Anderson Pacific Engineering Construction, Inc. is responsible and that its bid is responsive to the Town's informal bid process. It is recommended that the Council authorize staff to execute future Change Orders to the construction contract up to an amount of $5,000. Given the variables associated with this type of construction, staff should be able to manage the construction work and the change order amount is adequate to cover the cost of unforeseen circumstances that may arise during the course of construction, and/or for additional quantities of work that may exceed those included in the awarded contract. The construction of this project is anticipated to take place in May 2006. Notification of trail closure including signs and notices to alert and inform trail users and public will be a part of this project. PAGE 3 MAYOR AND TOWN COUNCIL SUBJECT: PROJECT NO. 05-06 - AWARD OF CONSTRUCTION CONTRACT FOR LOS GATOS CREEK TRAIL BRIDGE DECK REPLACEMENT MARCH 28, 2006 CONCLUSION: Staff recommends that the Council accept the staff recommendations noted above. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. FISCAL IMPACT: This project's revised funding was approved at mid-year budget adjustment. Staff recommends utilizing the Proposition 12 State Bond funding first, then the TDA grant funding, due to time restrictions for the State Bond funds. The following chart details the project funding: Los Gatos Creek Trail Deck Replacement Project Revised Project FY 2005/06 Fiscal Impact Funding 410-0602: Proposition 12 funds 55,000 410-0602: TDA Article-3 funds 10,000 TOTALS 65,000 Award Contract 55,000 3,500 58,500 Remaining Balance 6,500 6,500 'OTAL EXPENDITURES BY CATEGORY: taff Labor Engineering Design - Construction Management - Construction 53,500 Construction Contingency 5,000 TOTALS 58,500 Attachments: 1. Resolution declaring Anderson Pacific Engineering Construction, Inc. the lowest responsible bidder (with Exhibit A) Construction Contract 2. Bid Summary RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AWARDING A CONSTRUCTION CONTRACT TO ANDERSON PACIFIC ENGINEERING CONSTRUCTION, INC. FOR PROJECT 05-06 - LOS GATOS CREEK TRAIL BRIDGE DECK REPLACEMENT WHEREAS, bids were sought in conformance with State and Town law for Project 05-06 - Los Gatos Creek Trail Bridge Deck Replacement; and WHEREAS, Anderson Pacific Engineering Construction, Inc. submitted the lowest bid which the Town Council deems to be responsive to the Town's solicitation. NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that Anderson Pacific Engineering Construction, Inc. is declared to be the lowest responsible bidder for Project 05-06 - Los Gatos Creek Trail Bridge Deck Replacement. BE IT FURTHER RESOLVED that the Town Manager is hereby authorized and directed to execute a construction contract (Attached as Exhibit A) for said project on behalf of the Town in the amount of $53,500. BE IT FURTHER RESOLVED, that staff is authorized to execute future change orders, as necessary, up to an amount of $5,000. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 3rd day of April, 2006, by the following vote: COUNCIL MEMBERS: AYES: NAYS ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Attachment 1 CONTRACT THIS AGREEMENT is between the Town of Los Gatos (hereinafter referred to as "Owner") and Anderson Pacific Engineering Construction, Inc. (hereinafter referred to as "Contractor"). Owner and Contractor, for the consideration hereinafter named, agree as follows: A. SCOPE OF WORK Contractor shall furnish all materials and perform all of the work for the construction of Project 05- 06 - Los Gatos Creek Trail Bridge Deck Replacement in accordance with the Contract Documents. B. CONTRACT PRICE As full compensation for furnishing all materials and for doing all the work contemplated and embraced in this Contract, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the Work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay (fifty three thousand five hundred dollars), ($53,500), which shall supersede any other amount specified in the Contract Documents. C. CONTRACT DOCUMENTS All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same 'as if mentioned in all said documents. D. BEGINNING OF WORK Following the execution of this Contract and the approval of bonds and insurance policies and certificates, Owner shall issue aNotice to Proceed with the Work. Commencing work or the entrance of equipment or materials on the site of the Work by Contractor before receipt of the Notice to Proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. E. TIME OF COMPLETION The Work called for herein shall be fully completed within Thirty (30) working days of Contractor's receipt of the Notice to Proceed. Exhibit A F. CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN Contractor shall remedy any defects due to faulty materials and/or workmanship and pay for any damages to other work and/or existing facilities resulting therefrom which shall appear within a period of 2 years from the date of recording of the Notice of Completion. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of day of , 20 TOWN OF LOS GATOS, by: Debra J. Figone Town Manager RECOMMEND BY: John E. Curtis Director of Parks and Public Works APPROVED AS TO FORM: Orry P. Korb Town Attorney by: Anderson Pacific Engineering Construction, Inc. (Signature) (Contractor's License Number) ATTEST: Marlyn Rasmussen Clerk Administrator P-q N O ~ O N U ~ O O m Q O ~ U 'O O ~ N y N U .v U U Q N ~ bo b0 ~ l1 /V1 Qt r~ V j4 a ~N o C7 H n O O O N CO , O O C Q O N O w O O 0 6 i i E U in m d o U o o n U LLJ o O _ Y m C7 Lo U o O °o U' (o LO (0 N CO C ¢ O ~ O U O Q > = U o o° 06 ui o m m.ro v' ~ _a Co ~o 04 d v p o O LO V O 0 C) > 0) U Q U ' LD Cli ~ Co ti ; `n aEco ° c m NZU ~ o 0 CD O m 0 Lr! a rn c Qr o C 0 0 0 0 U 0 ° 0 ° o • o N E ti. O Co E{} N W - o O L ; L O O uwj ~-Z ss J Y U N m a m LL Q Cl) 0 m w V) a M 0 p. 0 V 0 O O N q N v Cd 0 0 N 'G 5 Pi O . co CCC O H N N o 'v w U rL+ N O v 3 0 O e9 cd co 3 o d V i u Attachment 2