Loading...
13 Staff Report - Ross Creek Bridge ADA Improvements DATE: TO: FROM: COUNCIL AGENDA REPORT MAY 26, 2004 􀁍􀁁􀁙􀁏􀁒􀁁􀁎􀁄􀁔􀁏􀁗􀁎􀁃􀁏􀁕􀁎􀁃􀁾 DEBRA J. FIGONE, TOWN MANAGER MEETING DATE: 6/7/04 ITEM NO. 1j SUBJECT: PROJECT 04-08 -ROSS CREEK BRIDGE ADA IMPROVEMENTS ADOPT RESOLUTION TO REJECT BIDS FOR PROJECT 04-08 -ROSS CREEK BRIDGE ADA IMPROVEMENTS AND AUTHORIZE STAFF TO REBID THE PROJECT RECOMMENDATION: Adopt resolution to reject bids for Project 04-08 -Ross Creek Bridge ADA hnprovements and authorize staffto rebid the project. BACKGROUND: On April 19, 2004 Council approved the plans and specifications and authorized staff to advertise the proj ect for bids. On May 26,2004, the Town Clerk received one sealed bid for the Ross Creek Bridge ADA hnprovements from Joseph J. Albanese, Inc. The bid summary is attached. The one bid submitted was-judged: by staff to-be-too high and not reflective of the anticipated pl'oject-co-st.--StafLhas determined that it would be prudent to rebid this project again to receive a better cost, andthat once more contractors participate in the bidding process, the Town will receive muchmore competitive pricing. Staffwill continue to solicit bids from various contractors forthis project. DISCUSSION: The adopted Capital hnprovement Program designates funding for the Ross Creek Bridge ADA hnprovements and is consistent with the Town's goals to improve public safety. This project funds the construction ofADA ramps at this bridge and replacing the bridgedeck surface and railing to make it ADA usable. If authorized by Council, this project will be re-advertised for a construction contract. Staff anticipates that the actual construction will start in July and be completed in August. PREPARED BY: Reformatted: 5/30102 JOHNE. CURTIS 􀁾􀁾 Director of Parks and :p1J.blic Works -N:\B&E\COUNCIL REPORTS\04-08.ross.crk.bridge.ada.reject.bids.wpd PAGE 2 􀁍􀁁􀁙􀁏􀁒􀁁􀁎􀁄􀁔􀁏􀁗􀁎􀁃􀁏􀁕􀁎􀁃􀁾 SUBJECT: PROJECT 04-08 -ROSS CREEK BRIDGE ADA IMPROVEMENTS MAY 26, 2004 CONCLUSION: Staffrecommends that the bid received on May 26th be rejected and the project re-advertised. ENVIRONMENTAL ASSESSMENT: This project is defined under CEQA but is Categorically Exempt (Section 15301@). A Notice of Exemption will not be filed. FISCAL IMPACT: The estimated construction cost for this project is $50,000, with a $10,boo contingency. Thisproject will be funded in project 410-0408 with CDBG funds, per the approved FY2003/04 Capital Improvement Program as illustrated below: ctual 50,000 10,000 nded/Encumber Or PlannedTo Dat FY2003/04 FY2003/04 New:Allocation :AImrovements Ross Creek410-0408 Pro sed Conti enc Pro sed Contract Attachments: 1. Resolution to Reject Bids 2. Bid Tabulation Sheet RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS TO REJECT BIDS FOR PROJECT 04-08 ROSS CREEK BRIDGE ADA IMPROVEMENTS WHEREAS,bids were sought in confonnancewith State andTown law for Project #04-08 .. Ross Creek Bridge ADA Improvements; and WHEREAS, Joseph J. Albanese, Inc. submitted a bid to the Town Clerk's Office on May 26,2004; and WHEREAS, the bid submitted was too costly and not reflective of anticipated costs; NOW, THEREFORE, BE IT RESOLVED, by the Town Council of the Town of Los Gatos, County ofSanta Clara, State ofCalifornia, that Council reject the bid and authorize staffto rebid Project #04-08 -Ross Creek Bridge ADA Improvements. PASSED ANDADOPTED, at a regular meeting ofthe Town Council ofthe Town ofLos Gatos, California, held on the COUNCIL MEMBERS: AYES: NAYS: ABSENT: ABSTAJN: day of 2004 bythe following vote: ATTEST: SIGNED: MAYOR OF THE TOWN OF LOS GATOS/CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Attachment 1 Town ofLos Gatos Parks and Public Works Department ADA Improvements to Ross Creek Pedestrian Bridge Project #04-08 Certified Bid Tabulation Bid opening: May 26, 21P04 at 10:00 A.M. at the Civic Center Engineers Estimate Joseph J. Albanese, Inc. PO Box 667 Santa Clara, CA 95052-0667 Ite11lN"O•..· BASE BID SUMMARY 1 R&R Wooden Brid e Install Two New Wood Ramps (One with 2 Stairs) 11 LS LS 25,000.00 25,000.00· 28,513.00 28,513.00 30,000.00 30,000.00 36,116.00 36,116.00 T011AL BASE $55,000.00 $64,629.00 Ite111No. ALTERNATE BID SUMMARY Install New Concrete Pad, Sidewalk, Curb & 1 Gutter, and ADA Ramp 1 LS 10,000.00 10,000.00 $10,000.00 16,222.00 16,222.00 $16,222.00. TOTAL BID $65,000.00 $80,851.00 􀁾 This certifies that all bids were received sealed and opened on May 26, 2004, and that thispa co'Sy of the 􀁾􀀮 bid tabulation with bids corrected for errors in addition & multiplication. By:􀁾 3/. I CD ::; IT N 1