Attachment 1 - SB 1 Resolution1 of 3
Resolution 2022- May 3, 2022
ATTACHMENT 1
RESOLUTION 2022-
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022/23 FUNDED BY THE STATE
SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the Town are aware of the projects proposed for funding in the community and
which projects have been completed each fiscal year; and
WHEREAS, the Town must adopt a list of all projects proposed to receive funding from
the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution,
which must include a description and the location of each proposed project, a proposed
schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the Town, will receive an estimated $669,856 in RMRA funding in Fiscal Year
2022/23 from SB 1; and
WHEREAS, this is the sixth year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the communities’ priorities for transportation investment;
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the Town’s streets and roads are in a fair condition and this revenue will help
2 of 3
Resolution 2022- May 3, 2022
ATTACHMENT 1
increase the overall quality of the road system and over the next decade will bring Town streets
and roads into a good condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW, THEREFORE, BE IT RESOLVED: The foregoing recitals are true and correct, and
the following list of projects previously adopted and newly proposed will be funded in-part or
solely with Fiscal Year 2022/23 Road Maintenance and Rehabilitation Account revenues:
Location Description Scheduled
Start and
Completion
Estimated
Useful Life
Union Avenue from Blossom Hill
Road to Los Gatos-Almaden Road
Placement of rubber cape seal or overlay
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
Spring 2022
to Fall 2023
10 - 25 years
Pollard Road from Quito Road to
W. Parr Avenue
Placement of rubber cape seal or overlay
to maintain pavement surface. This is an
arterial road and is critical for transit
needs in the Town.
Spring 2022
to Fall 2023
10 - 25 years
E. Main Street from Jackson
Street to Maple Place
Placement of rubber cape seal or overlay
to maintain pavement surface. This is a
collector road and is critical for transit
needs in the Town.
Fall 2022 to
Fall 2023
10 - 25 years
3 of 3
Resolution 2022- May 3, 2022
ATTACHMENT 1
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los
Gatos, California, held on the 3rd day of May of 2022 by the following vote:
COUNCIL MEMBERS:
AYES:
NAYS:
ABSENT:
ABSTAIN:
SIGNED:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: __________________
ATTEST:
TOWN CLERK OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
DATE: __________________