Loading...
Attachment 1 - SB 1 Resolution1 of 3 Resolution 2022- May 3, 2022 ATTACHMENT 1 RESOLUTION 2022- RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2022/23 FUNDED BY THE STATE SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the Town are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS, the Town must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the Town, will receive an estimated $669,856 in RMRA funding in Fiscal Year 2022/23 from SB 1; and WHEREAS, this is the sixth year in which the Town is receiving SB 1 funding and will enable the Town to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the Town used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities’ priorities for transportation investment; WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the Town’s streets and roads are in a fair condition and this revenue will help 2 of 3 Resolution 2022- May 3, 2022 ATTACHMENT 1 increase the overall quality of the road system and over the next decade will bring Town streets and roads into a good condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. NOW, THEREFORE, BE IT RESOLVED: The foregoing recitals are true and correct, and the following list of projects previously adopted and newly proposed will be funded in-part or solely with Fiscal Year 2022/23 Road Maintenance and Rehabilitation Account revenues: Location Description Scheduled Start and Completion Estimated Useful Life Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Spring 2022 to Fall 2023 10 - 25 years Pollard Road from Quito Road to W. Parr Avenue Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Spring 2022 to Fall 2023 10 - 25 years E. Main Street from Jackson Street to Maple Place Placement of rubber cape seal or overlay to maintain pavement surface. This is a collector road and is critical for transit needs in the Town. Fall 2022 to Fall 2023 10 - 25 years 3 of 3 Resolution 2022- May 3, 2022 ATTACHMENT 1 PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 3rd day of May of 2022 by the following vote: COUNCIL MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA DATE: __________________ ATTEST: TOWN CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA DATE: __________________