Attachment 4 - Proposed FY 2022-23 Summary of Fee Adjustments, Reclassifications, and DeletionsFee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
Address Processing Fee - per address $160.00 $165.00 $169.00 $174.00
BMP Document Processing Fee $575.00 $595.00 $609.00 $624.00
1 Lot $3,010.00 $3,112.00 $3,188.00 $3,266.00
2 Lots $1,505.00 $1,556.00 $1,594.00 $1,633.00
3 Lots $1,005.00 $1,039.00 $1,064.00 $1,090.00
4 Lots $755.00 $781.00 $800.00 $819.00 5 Lot or more $600.00 $620.00 $635.00 $651.00
Fee for issuing/reinstating a Building Permit $55.00 $57.00 $58.00 $60.00
Additional Building Permit Fee $30.00 $31.00 $32.00 $33.00
Demolition Permit Residential: $265.00 Residential: $274.00 Residential: $281.00 Residential: $288.00
Commercial: $465.00 Commercial: $481.00 Commercial: $492.00 Commercial: $505.00
Construction Valuation
$1.00 to $500.00 $32.99 $34.00 $35.00 $36.00 $501.00 to $2,000.00 $32.99 for the first $500.00 plus $4.28
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$34.00 for the first $500.00 plus $4.42
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$35.00 for the first $500.00 plus $4.53
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$36.00 for the first $500.00 plus $4.64
for each additional $100.00 or fraction
thereof, to and including $2,000.00
$2,001.00 to $25,000.00 $97.23 for the first $2,000.00 plus
$19.66 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$101.00 or the first $2,000.00 plus
$20.29 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$103.00 or the first $2,000.00 plus
$20.82 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$105.00 or the first $2,000.00 plus
$21.33 for each additional $1,000.00 or
fraction thereof, to and including
$25,000.00
$25,001.00 to $50,000.00 $549.32 for the first $25,000.00 plus
$14.18 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$568.00 for the first $25,000.00 plus
$14.63 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$582.00 for the first $25,000.00 plus
$15.02 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$596.00 for the first $25,000.00 plus
$15.39 for each additional $1,000.00 or
fraction thereof, to and including
$50,000.00
$50,001.00 to $100,000.00 $903.83 for the first $50,000.00 plus
$9.83 for each additional $1,000.00 or
fraction thereof, to and including $100,000.00
$935.00 for the first $50,000.00 plus
$10.14 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$957.00 for the first $50,000.00 plus
$10.41 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$981.00 for the first $50,000.00 plus
$10.67 for each additional $1,000.00 or
fraction thereof, to and including
$100,000.00
$100,001.00 to $500,000.00 $1,395.23 for the first $100,000.00 plus
$7.86 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,443.00for the first $100,000.00 plus
$8.11 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,478.00 for the first $100,000.00 plus
$8.32 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00
$1,514.00 for the first $100,000.00 plus
$8.53 for each additional $1,000.00 or
fraction thereof, to and including
$500,000.00$500,001.00 to $1,000,000.00 $4,540.19 for the first $500,000.00 plus
$6.67 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,695.00 for the first $500,000.00 plus
$6.88 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,808.00 for the first $500,000.00 plus
$7.06 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00
$4,926.00 for the first $500,000.00 plus
$7.24 for each additional $1,000.00 or
fraction thereof, to and including
$1,000,000.00$1,000,001.00 and over $7,874.69 for the first $1,000,000.00
plus $4.42 for each additional $1,000.00
or fraction thereof
$8,142.00 for the first $1,000,000.00
plus $4.56 for each additional $1,000.00
or fraction thereof
$8,339.00 for the first $1,000,000.00
plus $4.68 for each additional $1,000.00
or fraction thereof
$8,544.00 for the first $1,000,000.00
plus $4.80 for each additional $1,000.00
or fraction thereof
Inspection outside normal business hours (4 hr.
minimum)
$192.00/hr.$199.00/hr.$203.00/hr.$208.00/hr.
Re-inspection fees $160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Inspections for which no fee is specifically indicated (2
hr. minimum)
$160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Additional plan review required by changes, additions or
revisions to plans (1 hr. minimum)
$152.50/hr.$158.00/hr.$161.00/hr.$165.00/hr.
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
General Development Fees
Annexation Fees
Building Permit Fees
New Construction and Addition
Special Services & Inspections
ATTACHMENT 4
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Services for which no fee is specifically indicated (1/2 hr.
minimum)
$160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Permit/Plan check time extension (per permit) (applies
to permits that have not expired)
$78.00 $81.00 $83.00 $85.00
Express plan review or initial review (1 hr. minimum)$160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Application for the Appeals Building Board Review $273.00 $282.00 $289.00 $296.00
Temporary Certificate of Occupancy $1,095.00 $1,132.00 $1,160.00 $1,188.00
Convert Garage to habitable space $117.00/sq. ft.$121.00/sq.ft.$124.00/sq.ft.$127.00/sq.ft.Convert unfinished basement or attic to habitable $127.00/sq. ft.$131.00/sq.ft.$134.00/sq.ft.$138.00/sq.ft.
Pools/Spas (gunite)$76.00/sq. ft.$79.00/sq.ft $80.00/sq.ft $82.00/sq.ft
Siding - aluminum/vinyl/wood $32.00/sq. ft.$33.00/sq.ft.$34.00/sq.ft.$35.00/sq.ft.
Commercial Awning or Canopy Aluminum $32.00/sq. ft.$33.00/sq.ft.$34.00/sq.ft.$35.00/sq.ft.
Canvas $24.00/sq. ft.$25.00/sq.ft.$25.00/sq.ft.$26.00/sq.ft.
Fence or Freestanding Wall (over 6" high)Wood or metal $49.00/lf.$51.00/sq.ft.$52.00/sq.ft.$53.00/sq.ft.
Masonry $85.00/lf.$88.00/sq.ft.$90.00/sq.ft.$92.00/sq.ft.Decks/Balcony $47.00/sq. ft.$49.00/sq.ft.$50.00/sq.ft.$51.00/sq.ft.Wood Deck $20.00/sq. ft $21.00/sq.ft.$21.00/sq.ft.$22.00/sq.ft.
Re-roofs $3.00/sq. ft.$3.00/sq.ft.$3.00/sq.ft.$3.00/sq.ft.
Retaining Walls $107.00/lf.$111.00/sq.ft.$113.00/sq.ft.$116.00/sq.ft.
Emergency generation, wind power, special HVAC
systems, etc.
Plan Review (1 hr. minimum)
$152.50/hr.
Plan Review (1 hr. minimum)
$158.00/hr.
Plan Review (1 hr. minimum)
$161.00/hr.
Plan Review (1 hr. minimum)
$165.00/hr.Field Inspection (2 hr. minimum)
$160.00/hr.
Field Inspection (2 hr. minimum)
$165.00/hr.
Field Inspection (2 hr. minimum)
$169.00/hr.
Field Inspection (2 hr. minimum)
$174.00/hr.Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum)
$152.50/hr.
Plan Review (1/4 hr. minimum)
$158.00/hr.
Plan Review (1/4 hr. minimum)
$161.00/hr.
Plan Review (1/4 hr. minimum)
$165.00/hr.
Field Inspection (1 hr. minimum)
$160.00/hr.
Field Inspection (1 hr. minimum)
$165.00/hr.
Field Inspection (1 hr. minimum)
$169.00/hr.
Field Inspection (1 hr. minimum)
$174.00/hr.
Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum)
$152.50/hr.
Plan Review (1 hr. minimum)
$158.00/hr.
Plan Review (1 hr. minimum)
$161.00/hr.
Plan Review (1 hr. minimum)
$165.00/hr.Field Inspection (2 hr. minimum)
$160.00/hr.
Field Inspection (2 hr. minimum)
$165.00/hr.
Field Inspection (2 hr. minimum)
$169.00/hr.
Field Inspection (2 hr. minimum)
$174.00/hr.
Other Miscellaneous Factors to Determine Construction Valuation
Special Systems Fees
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Fee for issuing/reinstating an Electrical Permit $55.00 $57.00 $58.00 $60.00
Additional Electrical Permit Fee $25.00 $26.00 $26.00 $27.00
Plan review fee 25% of Electrical Permit Fee
Additional plan review $152.50/hr.$158.00/hr.$161.00/hr.$165.00/hr.
Re-inspection fee $160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Private swimming pools $63.00 $65.00 $67.00 $68.00 Public swimming pools $114.00 $118.00 $121.00 $124.00 Temporary power poles $78.00 $81.00 $83.00 $85.00
Temporary distribution system & temporary lighting $38.00 $39.00 $40.00 $41.00
Installation of illuminated signs (each)$101.00 $104.00 $107.00 $110.00
Receptacle, switch and lights $2.00 $2.00 $2.00 $2.00
Residential appliances/new circuits (cook top, oven,
range, disposals, clothes dryers, or other motor operated
appliances not exceeding one horsepower)
$6.00 $6.00 $6.00 $7.00
Nonresidential appliances/new circuits (medical & dental
devices, food, beverage, drinking fountains, laundry
machines, or other similar equipment) NOTE: for other
types of air conditioners and other motor-driven
appliances having larger electrical ratings, see Generators/Motors
$8.00 $8.00 $8.00 $9.00
Power apparatus (generators, transformers, A/C, heat
pumps, baking equipment)
Up to 10 KV, each $16.00 Up to 10 KV, each $17.00 Up to 10 KV, each $17.00 Up to 10 KV, each $17.00
Over 10 KV not over 50 KV, each $32.00 Over 10 KV not over 50 KV, each $33.00 Over 10 KV not over 50 KV, each $34.00 Over 10 KV not over 50 KV, each $35.00
Over 50 KV and not over 100 KV, each
$63.00
Over 50 KV and not over 100 KV, each
$65.00
Over 50 KV and not over 100 KV, each
$67.00
Over 50 KV and not over 100 KV, each
$68.00Over 100 KV, each $84.00 Over 100 KV, each $87.00 Over 100 KV, each $89.00 Over 100 KV, each $91.00MotorsUp to 10 hp $16.00 Up to 10 hp $17.00 Up to 10 hp $17.00 Up to 10 hp $17.00Up to 25 hp $32.00 Up to 25 hp $33.00 Up to 25 hp $34.00 Up to 25 hp $35.00
Up to 55 hp $63.00 Up to 55 hp $65.00 Up to 55 hp $67.00 Up to 55 hp $68.00
Over 55 hp $92.00 Over 55 hp $95.00 Over 55 hp $97.00 Over 55 hp $100.00
Transformers Up to 5 KVA $16.00 Up to 5 KVA $17.00 Up to 5 KVA $17.00 Up to 5 KVA $17.00
Up to 10 KVA $32.00 Up to 10 KVA $33.00 Up to 10 KVA $34.00 Up to 10 KVA $35.00
Up to 50 KVA $53.00 Up to 50 KVA $55.00 Up to 50 KVA $56.00 Up to 50 KVA $58.00
Over 50 KVA $77.00 Over 50 KVA $80.00 Over 50 KVA $82.00 Over 50 KVA $84.00Busways/conduits (per 100 ft)$8.00 $8.00 $8.00 $9.00 Service equipment 200 amps or less $78.00 200 amps or less $81.00 200 amps or less $83.00 200 amps or less $85.00
201 to 999 amps $108.00 201 to 999 amps $112.00 201 to 999 amps $114.00 201 to 999 amps $117.00
Sub-panels $38.00 Sub-panels $39.00 Sub-panels $40.00 Sub-panels $41.00
Installation of spas or saunas $38.00 $39.00 $40.00 $41.00
Electrical Permit Fees
Plan Review & Re-inspection Fees
System Fee Schedule
Unit Fee Schedule
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Duplicate job card $25.00 $26.00 $26.00 $27.00
Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Fee for issuing/reinstating a Mechanical Permit $55.00 $57.00 $58.00 $60.00
Additional Mechanical Permit Fee $25.00 $26.00 $26.00 $27.00
Plan review fee 25% of Mechanical Permit FeeAdditional plan review $152.50/hr.$158.00/hr.$161.00/hr.$165.00/hr.Re-inspection fee $160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Installation, of each heating system, A/C, boiler,
compressor or air handler
$38.00 $39.00 $40.00 $41.00
Each duct repair or alteration $11.00 $11.00 $12.00 $12.00
Each fireplace appliance $32.00 $33.00 $34.00 $35.00
Each ventilating fan $11.00 $11.00 $12.00 $12.00 Installation of separate flue or vents not included with
the installation of an appliance
$11.00 $11.00 $12.00 $12.00
Installation of each hood with mechanical exhaust Residential $32.00 Residential $33.00 Residential $34.00 Residential $35.00
Commercial $114.00 Commercial $118.00 Commercial $121.00 Commercial $124.00
Each new or repair of gas piping system $70.00 $72.00 $74.00 $76.00
Each additional gas outlet $23.00 $24.00 $24.00 $25.00
Installation of evaporative cooler $32.00 $33.00 $34.00 $35.00
Duplicate job card $25.00 $26.00 $26.00 $27.00 Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Fee for issuing/reinstating a Plumbing Permit $55.00 $57.00 $58.00 $60.00
Additional Plumbing Permit Fee $25.00 $26.00 $26.00 $27.00
Additional plan review $152.50/hr.$158.00/hr.$161.00/hr.$165.00/hr.
Re-inspection fee $160.00/hr.$165.00/hr.$169.00/hr.$174.00/hr.
Private swimming pools (including heater, water piping,
gas piping)
$92.00 $95.00 $97.00 $100.00
Public swimming pools (including heater, water piping,
gas piping)
$138.00 $143.00 $146.00 $150.00
Lawn sprinkler system on one meter $38.00 $39.00 $40.00 $41.00
Each new or repair of gas piping system $70.00 $72.00 $74.00 $76.00
Each drainage, sewer system $38.00 $39.00 $40.00 $41.00 Radiant floor heating system $114.00 $118.00 $121.00 $124.00
Plan Review & Re-inspection Fees
System Fee Schedule
Plan Review & Re-inspection Fees
Unit Fee Schedule
Plumbing Permit Fees
Other Mechanical Fees
Other Electrical Fees
Mechanical Permit Fees
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Each plumbing fixture or trap or set of fixtures on one
trap
$11.00 $11.00 $12.00 $12.00
Each sewer cleanout, backflow device $11.00 $11.00 $12.00 $12.00
Each septic system abatement $114.00 $118.00 $121.00 $124.00
Rainwater systems - per drain (inside building)$11.00 $11.00 $12.00 $12.00
Each water heater, water softener $32.00 $33.00 $34.00 $35.00
Each grease interceptor (750 gallon capacity)$78.00 $81.00 $83.00 $85.00 Each grease trap (1-4 fixtures)$44.00 $45.00 $47.00 $48.00 Residential water re-piping $114.00 $118.00 $121.00 $124.00 Each ejector/sump pump $38.00 $39.00 $40.00 $41.00
Each vacuum breaker/hose bib $11.00 $11.00 $12.00 $12.00
Each water piping system repair or replacement $24.00 $25.00 $25.00 $26.00
Each additional gas outlet $24.00 $25.00 $25.00 $26.00
Duplicate job card $25.00 $26.00 $26.00 $27.00
Permit extension (applies to permits that have not
expired)
$78.00 $81.00 $83.00 $85.00
Duplicate Inspection Card $30.00 $31.00 $32.00 $33.00
NPDES Inspection Fee (Charged on all building permits
with the potential to generate non-point source storm
water runoff during construction)
$70.00 $72.00 $74.00 $76.00
New single family detached (HR and RC zones)$8,978.00 $9,283.00 $9,508.00 $9,741.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00
New non-custom single family detached (HR and RC
zones) per unit/model, as part of a Planned
Development**
$6,235.00 $6,447.00 $6,603.00 $6,765.00
Engineering Development Review Service Fee $4,148.00 $4,289.00 $4,393.00 $4,501.00
New single family or two family units $6,187.00 $6,397.00 $6,552.00 $6,713.00 Engineering Development Review Service Fee $4,149.00 $4,290.00 $4,394.00 $4,502.00 New single family or two family (any other zone) per
unit/model new nonresidential or multiple family per
building as part of a Planned Development**
$4,421.00 $4,571.00 $4,682.00 $4,797.00
Engineering Development Review Service Fee $4,153.00 $4,294.00 $4,398.00 $4,506.00
Minor projects (a development proposal that does not
significantly change the size, mass, appearance or
neighborhood impact of a structure, property or parking
lot
$2,243.00 $2,319.00 $2,375.00 $2,434.00
Engineering Development Review Service Fee $3,186.00 $3,294.00 $3,374.00 $3,457.00
Unit Fee Schedule
Other Plumbing Fees
Other Fees
Architecture and Site Applications - Development Review Committee (DRC) Approval*
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Supplemental fee DRC applications as determined with
fee #146 or minor residential development applications
or applications that are part of a Planned Development that require Planning Commission approval
$3,168.00 $3,276.00 $3,355.00 $3,437.00
Engineering Development Review Service Fee $1,157.00 $1,196.00 $1,225.00 $1,255.00 New two family unit $9,437.00 $9,758.00 $9,994.00 $10,239.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00 New nonresidential (includes conceptual Planned
Development elevations)
$10,832.00 $11,200.00 $11,471.00 $11,753.00
Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00
New multiple family (includes conceptual Planned
Development elevations)
$9,847.00 $10,182.00 $10,428.00 $10,684.00
Engineering Development Review Service Fee $4,149.00 $4,290.00 $4,394.00 $4,502.00
All other (i.e. exceed FAR, major grading, etc.)$5,491.00 $5,678.00 $5,815.00 $5,958.00 Engineering Development Review Service Fee $4,151.00 $4,292.00 $4,396.00 $4,504.00
Conditional Use Permit $6,351.00 $6,567.00 $6,726.00 $6,891.00
Engineering Development Review Service Fee $1,351.00 $1,397.00 $1,431.00 $1,466.00
Conditional Use Permit (when consolidated with another
application for new development)
$1,056.00 $1,092.00 $1,118.00 $1,146.00
Engineering Development Review Service Fee $774.00 $800.00 $820.00 $840.00
Conditional Use Permit for Minor Restaurant (DRC
Approval)
$3,865.00 $3,996.00 $4,093.00 $4,194.00
Engineering Development Review Service Fee $1,160.00 $1,199.00 $1,228.00 $1,259.00
Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
$6,351.00 $6,567.00 $6,726.00 $6,891.00
Engineering Development Review Service Fee $1,736.00 $1,795.00 $1,838.00 $1,884.00
Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or entertainment
(must pay #159 below with this application)
$7,506.00 $7,761.00 $7,949.00 $8,144.00
Engineering Development Review Service Fee $1,735.00 $1,794.00 $1,837.00 $1,882.00
Applications that require Town Council Approval (these
fees supplement the above established fees)
$3,012.00 $3,114.00 $3,190.00 $3,268.00
Engineering Development Review Service Fee $1,158.00 $1,197.00 $1,226.00 $1,256.00
Change of use $230.00 $238.00 $244.00 $250.00
Change of occupancy (excluding change of proprietor of
a continuing business enterprise)
$155.00 $160.00 $164.00 $168.00
New permanent sign $310.00 $321.00 $328.00 $336.00
Temporary nonresidential sign $99.00 $102.00 $105.00 $107.00
Change of face only $155.00 $160.00 $164.00 $168.00
Sign program $2,075.00 $2,146.00 $2,197.00 $2,251.00
Planning Division Certificates of Use and Occupancy
Architecture and Site Applications - Planning Commission Approval
Conditional Use Permits
Sign Application
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Minor telecommunications facility (i.e. microcell, 8,021
lb. or equivalent)
$1,535.00 $1,587.00 $1,626.00 $1,665.00
Major telecommunications facility which do not require
a Conditional Use Permit
$3,681.00 $3,806.00 $3,898.00 $3,994.00
Variance $4,671.00 $4,830.00 $4,947.00 $5,068.00
Engineering Development Review Service Fee $1,351.00 $1,397.00 $1,431.00 $1,466.00 Minor Residential Development (see #151)$2,243.00 $2,319.00 $2,375.00 $2,434.00 Agricultural Preserve Withdrawal $3,810.00 $3,940.00 $4,035.00 $4,134.00 Home Occupation Permit $155.00 $160.00 $164.00 $168.00
Accessory Dwelling Unit $1,340.00 $1,386.00 $1,419.00 $1,454.00
Lot Line Adjustment (DRC Approval)$2,128.00 $2,200.00 $2,254.00 $2,309.00
Engineering Development Review Service Fee $3,571.00 $3,692.00 $3,782.00 $3,875.00
4 Lots or Less (DRC Approval)$8,575.00 $8,867.00 $9,081.00 $9,304.00
Engineering Development Review Service Fee $3,960.00 $4,095.00 $4,194.00 $4,297.00 4 Lots or Less (as part of a Planned Development) (DRC
Approval)
$3,541.00 $3,661.00 $3,750.00 $3,842.00
Engineering Development Review Service Fee $4,153.00 $4,294.00 $4,398.00 $4,506.00
5 Lots or More $9,660.00 $9,988.00 $10,230.00 $10,481.00
Engineering Development Review Service Fee $5,115.00 $5,289.00 $5,417.00 $5,550.00
5 Lots or More (as part of a Planned Development) (DRC
Approval)
$4,152.00 $4,293.00 $4,397.00 $4,505.00
Engineering Development Review Service Fee $5,118.00 $5,292.00 $5,420.00 $5,553.00 Lot Merger and Reversion to Acreage (DRC Approval)$1,055.00 $1,091.00 $1,117.00 $1,145.00
Engineering Development Review Service Fee $3,570.00 $3,691.00 $3,781.00 $3,873.00
Condominium $7,445.00 $7,698.00 $7,884.00 $8,078.00
Condominium (as part of a Planned Development)$3,541.00 $3,661.00 $3,750.00 $3,842.00
Certificate of Compliance (DRC Approval)$3,076.00 $3,181.00 $3,257.00 $3,337.00
Engineering Development Review Service Fee $2,219.00 $2,294.00 $2,350.00 $2,408.00 VTM applications that require Town Council approval,
Subdivision and/or DRC applications that require
Planning Commission approval. This fee supplements the
above-established fees.
$2,824.00 $2,920.00 $2,991.00 $3,064.00
Push Cart Permit $492.00 $509.00 $521.00 $534.00
Auto Dealer Events Smaller Promotional Events $82.00 Smaller Promotional Events $85.00 Smaller Promotional Events $87.00 Smaller Promotional Events $89.00
Large Promotional Events $401.00 Large Promotional Events $415.00 Large Promotional Events $425.00 Large Promotional Events $435.00News rack Permit Fee $390.00 $403.00 $413.00 $423.00
Draft Initial Study Review Fee (or actual cost if part of a
Planned Development, General Plan and/or Town Code
Amendment
$2,786.00 $2,881.00 $2,950.00 $3,023.00
Engineering Development Review Service Fee $1,931.00 $1,997.00 $2,045.00 $2,095.00
Administrative Land Use Permit
Other Zoning Approvals Fees
Subdivisions
Miscellaneous Application Fees
Environmental Assessment Fees
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
Fee to appeal Planning Commission decision to Town
Council
Per Residential $438.00 Per Residential $453.00 Per Residential $464.00 Per Residential $475.00
Per Commercial, multi-family or
tentative map $1,763.00
Per Commercial, multi-family or
tentative map $1,823.00
Per Commercial, multi-family or
tentative map $1,867.00
Per Commercial, multi-family or
tentative map $1,913.00
Fee to remand applications from Town Council to
Planning Commission
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional fees
Fully allocated hourly rate for all
personnel plus additional feesFee to appeal Director of Community Development or
Development Review Committee decision to Planning
Commission
Per Residential $221.00 Per Residential $229.00 Per Residential $234.00 Per Residential $240.00
Per Commercial $882.00 Per Commercial $912.00 Per Commercial $934.00 Per Commercial $957.00
Tree appeals $90.00 $93.00 $95.00 $98.00
Basic Zoning Letter $155.00 $160.00 $164.00 $168.00
Legal non-conforming verification $650.00 $672.00 $688.00 $705.00
Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00 $285.00 $292.00 $299.00
Fence Height Exceptions $276.00 $285.00 $292.00 $299.00
Application Fee $490.00 $507.00 $519.00 $532.00
$20,000.00 to $80,000.00 $3,100.00 plus 9% of valuation $3,205.00 plus 9% of valuation $3,283.00 plus 9% of valuation $3,364.00 plus 9% of valuation
Greater than $80,000 $8,500.00 plus 8.5% valuation $8,789.00 plus 8.5% valuation $9,002.00 plus 8.5% valuation $9,223.00 plus 8.5% valuation
$20,000.00 to $80,000.00 $1,500.00 plus 6.5% of valuation $1,551.00 plus 6.5% of valuation $1,589.00 plus 6.5% of valuation $1,628.00 plus 6.5% of valuationGreater than $80,000.00 $5,400.00 plus 4.0% of valuation $5,584.00 plus 4.0% of valuation $5,719.00 plus 4.0% of valuation $5,859.00 plus 4.0% of valuation
Encroachment Permit - Residential Work up to $4,000.00 - $305.00 Work up to $4,000.00 - $315.00 Work up to $4,000.00 - $323.00 Work up to $4,000.00 - $331.00
Each additional $2,000.00 - $160.00 Each additional $2,000.00 - $165.00 Each additional $2,000.00 - $169.00 Each additional $2,000.00 - $174.00
Encroachment Permit - Collector/Arterial Streets**Work up to $4,000.00 - $1,580.00 Work up to $4,000.00 - $1,634.00 Work up to $4,000.00 - $1,673.00 Work up to $4,000.00 - $1,714.00
Each additional $2,000.00 - $345.00 Each additional $2,000.00 - $357.00 Each additional $2,000.00 - $365.00 Each additional $2,000.00 - $374.00
Temporary Encroachment Permit $150.00 $155.00 $159.00 $163.00
Dumpster Permit $150.00 $155.00 $159.00 $163.00 Storage Permit $150.00***$155.00***$159.00***$163.00***
Inspection Fee - Grading Permits Single Family Residential $730.00 Single Family Residential $755.00 Single Family Residential $773.00 Single Family Residential $792.00
Commercial or Multi Family Residential
$1,135.00
Commercial or Multi Family Residential
$1,174.00
Commercial or Multi Family Residential
$1,202.00
Commercial or Multi Family Residential
$1,231.00
Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00 Single Family Residential $207.00 Single Family Residential $212.00 Single Family Residential $217.00
Commercial or Multi Family Residential
$325.00
Commercial or Multi Family Residential
$336.00
Commercial or Multi Family Residential
$344.00
Commercial or Multi Family Residential
$353.00Plus $485.00 per LID facility Plus $501.00 per LID facility Plus $514.00 per LID facility Plus $526.00 per LID facility
Inspection of Storm Water Treatment Measures $500.00 per facility $517.00 per facility $530.00 per facility $543.00 per facility
Annual Stormwater/Limited Impact Development (LID)
Permit
Per Visit and 1st facility inspection
$485.00
Per Visit and 1st facility inspection
$501.00
Per Visit and 1st facility inspection
$514.00
Per Visit and 1st facility inspection
$526.00
Every additional facility inspection
$160.00
Every additional facility inspection
$165.00
Every additional facility inspection
$169.00
Every additional facility inspection
$174.00
Work In or Use of Public Right of Way
NPDES
Appeals
Zoning Research
Other Planning Division Fees
Engineering Plan Check Fee
Inspection Fee
Fee Name FY 2019/20 Adopted
FY 2022/23 Proposed at 3.4% CPI
(See Attachment 1)
FY 2022/23 Proposed at 5.9% CPI
(See Attachment 2)
FY 2022/23 Proposed at 8.5% CPI
(See Attachment 3)
FY 2022/23 Fee Consumer Price Index (CPI) and Building Cost Index (BCI) Adjustments
1-4 lots $2,855.00*$2,952.00*$3,023.00*$3,098.00*
5 or more lots $3,995.00*$4,131.00*$4,231.00*$4,335.00*
Staff Review Fee $664.00 plus 10% of the traffic
consultant report cost
$687.00 plus 10% of the traffic
consultant report cost
$703.00 plus 10% of the traffic
consultant report cost
$720.00 plus 10% of the traffic
consultant report costSite Distance Analysis $178.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
$184.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
$189.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
$193.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.Traffic Impact Mitigation Fee $958.00 per new average daily trip
generated
$991.00 per new average daily trip
generated
$1,015.00 per new average daily trip
generated
$1,039.00 per new average daily trip
generated
Development Projects Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,228.00/ac.
Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,372.00/ac.
Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,477.00/ac.
Single family lots Section 24.60.035(b)
(3): For subdivision whose lots exceed
one acre, the fee shall not exceed that
of one acre per lot $4,587.00/ac.
Multiple family dwelling units - initial
unit $4,228.00/ac.
Multiple family dwelling units - initial
unit $4,372.00/ac.
Multiple family dwelling units - initial
unit $4,477.00/ac.
Multiple family dwelling units - initial
unit $4,587.00/ac.
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $164.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $168.00
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $173.00Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00/ac.
Commercial, industrial, hospitals,
churches, schools, and others
$5,466.00/ac.
Commercial, industrial, hospitals,
churches, schools, and others
$5,598.00/ac.
Commercial, industrial, hospitals,
churches, schools, and others
$5,735.00/ac.
House Moving Fee $3,490.00*$3,609.00**$3,696.00**$3,787.00**
New Buildings and Additions Residential (per square foot added)
$1.17/sq.ft.*
Residential (per square foot added)
$1.19/sq.ft.*
Residential (per square foot added)
$1.26/sq.ft.*
Residential (per square foot added)
$1.32/sq.ft.*Non-residential (per square foot added)
$1.17/sq.ft.*
Non-residential (per square foot added)
$1.19/sq.ft.*
Non-residential (per square foot added)
$1.26/sq.ft.*
Non-residential (per square foot added)
$1.32/sq.ft.*
Engineering Reversion to Acreage $2,395.00 plus initial deposit of $2,500
for surveyor
$2,476.00 plus initial deposit of $2,500
for surveyor
$2,536.00 plus initial deposit of $2,500
for surveyor
$2,599.00 plus initial deposit of $2,500
for surveyor
Engineering Lot Merger $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor deposit
Engineering Lot Line Adjustments $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor deposit
Certificate of Compliance $3,480.00 plus surveyor deposit $3,598.00 plus surveyor deposit $3,685.00 plus surveyor deposit $3,776.00 plus surveyor depositAbandon Excess Public Right-of-Way & Public Easement $4,345.00 plus surveyor and valuation
consultant and planning services
$4,493.00 plus surveyor and valuation
consultant and planning services
$4,601.00 plus surveyor and valuation
consultant and planning services
$4,714.00 plus surveyor and valuation
consultant and planning services
Separate Instrument Dedication Fee (for dedication via
grant deeds and not maps)
$720.00 plus initial deposit of $2,500
for surveyor
$744.00 plus initial deposit of $2,500
for surveyor
$762.00 plus initial deposit of $2,500
for surveyor
$781.00 plus initial deposit of $2,500
for surveyor
Traffic Impact Analysis or Parking Study
Storm Drainage Fees
Hauling Permits
Construction Activities Mitigation Fee
Other Engineering Fees
Engineering Subdivision Map Checking
Fee Name FY 2019/20 Adopted FY 2022/23 Proposed
Community Benefit No standard schedule, as offered and
applied per project
Delete Fee
Public Art In-Lieu Fee N/A 1% of building permit valuation
Two-Unit Housing Development N/A $1,340.00
Urban Lot Split N/A $1,340.00
Administrative Fee N/A 10% of Development Fees
Sidewalks $16.00/sq.ft.$20.00/sq.ft.
Curb and Gutter $68.00/lf.$100.00/lf.
Tree Removal Permit Application One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
Initial Application for each Therapist $213.00 Delete Fee
Annual Renewal for each Therapist $107.00 Delete Fee
Massage Permit Fees
FY 2022/23 Fee Adjustments, Reclassifications, Deletions and Additions
General Development Fees
Tree Related Fees
Add a note that fee will be waived when
tree removal is done to implement or
maintain Defensible Space