Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Attachment 2 - 2021-22 Unfunded Project List
Rank Project Program GFAR Add Amount Safety Equity Quality of lIfe Mandate Maintenance Improvement 1 Neighborhood Traffic Calming Streets $250,000 2 Blossom Hill Road Traffic Calming Streets $950,000 3 Shannon Road Repair Streets $4,500,000 3Sports Park Snack Shack Roof Repair Parks $45,000 3Heritage Grove AC Sidewalks Streets $150,000 3Sidewalk Infill Across from Fisher Middle School Streets $250,000 3CNG station decommission Facilities $100,000 3Balzer Field Irrigation Replacement Parks $75,000 3La Rinconada play structure Parks $200,000 3Oak Meadow Air Force Plane Coating Parks $55,000 4 Lynne Ave Community Garden Parks $500,000 4Townwide drinking fountain to hydration station Parks $50,000 4 Public Art Gateway #2 Arts Commission $28,000 4 Public Art ‐ Santa Cruz Ave @ Highway 9Arts Commission $21,000 4 Downtown Streetscape Streets $10,000,000 4Highway 17 BPOC (local match funds)Streets $1,800,000 4Oak Hill Play Lot and Hardscape Parks $200,000 4Roberts Road West Trail Connector ‐ 30% Design Parks $100,000 4Charter Oaks Trail Project Parks $750,000 4Union Avenue Sidewalks Streets $1,500,000 4Oak Meadow Fencing Replacement Parks $125,000 4 Lynne Ave Pedestrian Path Design Parks $75,000 4Los Gatos Almaden Road Improvments Streets $6,000,000 4 Civic Center Irrigation System Replacement Parks $200,000 4La Rinconada Park Turf Renovation Parks $200,000 4Oak Meadow Restroom Expansion Parks $750,000 4Live Oak Manor Park Turf Rehab Parks $200,000 4 Blossom Hill Park Turf Rehab Parks $200,000 4North SC Sidewalk Repair north of Hwy 9 Streets $1,000,000 TOTALS $30,274,000 Fiscal Year 2021/22 CIP Unfunded Project List Rank‐ 1 ‐Safety 2 ‐Economic Vitality 3 ‐Critical Cap Maintenance 4 ‐Infrastructure Improvements ATTACHMENT 2