Staff Report. FY21-22 Curb Gutter and Sidewalk Maintenance PREPARED BY: WooJae Kim Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 2/15/2022 ITEM NO: 8 DATE: February 4, 2022 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921): a. Approve the Plans and Specifications; b. Authorize Advertising the Project for Bid; c. Authorize the Town Manager to Award and Execute a Construction Agreement in an Amount Not to Exceed $588,500, Including Contingencies; and d. Authorize Staff to Execute Future Change Orders in an Amount Not to Exceed Ten Percent of the Contract Award Amount RECOMMENDATION: Staff recommends that the Town Council authorize the following actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921) for Fiscal Year (FY) 2021/22: a. Approve the Plans and Specifications; b. Authorize advertising the project for bid; c. Authorize the Town Manager to award and execute a construction agreement in an amount not to exceed $588,500, including contingencies; and d. Authorize staff to execute future change orders in an amount not to exceed ten percent of the contract award amount. BACKGROUND: The adopted Fiscal Year (FY) 2021/22-2025/26 Capital Improvement Program (CIP) Budget designates funding for the Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921). The goal of this annually funded project is to replace and improve damaged or outdated curbs, gutters, sidewalks, driveways, and curb ramps within the Town’s jurisdiction to address safety and operational issues and to improve accessibility. Project locations are primarily based on PAGE 2 OF 3 SUBJECT: Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921) DATE: February 4, 2022 BACKGROUND (continued): where concrete infrastructure improvements are needed prior to the annual Street Repair and Resurfacing (CIP No. 811-9901). The project is consistent with the Town’s goals to improve public safety and the quality of the Town’s infrastructure. DISCUSSION: For the FY 2021/22 Curb, Gutter, and Sidewalk Maintenance (Concrete) Project, a large portion of the work focuses on replacing or retrofitting curb ramps for compliance with the Americans with Disabilities Act (ADA) and other accessibility requirements. Title II of the ADA obligates jurisdictions to upgrade non-conforming curb ramps when streets are resurfaced from one intersection to another. The United States Department of Justice has determined that surface treatments such asphalt overlay and rubber cape seal trigger the requirement for ADA compliant curb ramps on associated streets. On December 21, 2021, the Town Council approved the street list for the Fiscal Year 2021/22 Street Repair and Resurfacing Project (CIP 811-9901). Based on this list, staff identified a total of 57 curb ramps that are anticipated to be replaced or retrofitted with this year’s Concrete Project. The Concrete Project also includes approximately 250 square feet of sidewalk and 75 linear feet of curb and gutter. The engineer’s estimate for this project is $588,500, which includes a 10% contingency. The Plans and Specifications for the FY 2021/22 Curb, Gutter, and Sidewalk Maintenance Project can be viewed on the Town website at https://www.losgatosca.gov/108/Capital- Improvement-Program. Once authorized by the Town Council to advertise for bid, the following is the anticipated schedule for the Concrete Project: Milestones Anticipated Timeline Advertise the Project for Bid February 18, 2022 Bids Due March 10, 2022 Award and Execute Agreement April 2022 Start Construction May 2022 Anticipated Completion August 2022 CONCLUSION: Approval of the recommendations would allow staff to move forward with bidding and contract award for the FY 2021/22 Curb, Gutter, and Sidewalk Maintenance Project. This project would be constructed in advance of this year’s Street Repair and Resurfacing Project. PAGE 3 OF 3 SUBJECT: Annual Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921) DATE: February 4, 2022 COORDINATION: This project has been coordinated with the Finance Department. FISCAL IMPACT: The FY 2021/22 – 2025/26 CIP Budget for the Curb, Gutter, and Sidewalk Maintenance Project (CIP No. 813-9921), with the FY 2021/22 approved allocation of the Transportation Development Act (TDA) funds from the Metropolitan Transportation Commission in an amount of $62,884, would be sufficient for the construction contract, including contingency and project delivery costs. Curb, Gutter, and Sidewalk Maintenance Project CIP No. 813-9921 Budget Costs GFAR $ 581,550 TDA Fund Allocation $ 62,884 Total Budget $ 644,434 Construction $ 535,000 Construction Contingency (10%) $ 53,500 Temporary/Part-Time Staff $ 30,000 Material Testing $ 20,000 Other Project Delivery Costs $ 5,934 Total Expenditures $ 644,434 Available Balance $ 0 Staff costs are tracked for all projects. Tracking of staff costs allows for accountability in the costs of projects, recovery of costs from grant funded projects, and identification of future staffing needs. This project utilizes a combination of full-time budgeted staff and temporary staff that support fluctuating workloads. The costs for temporary staff will be directly associated with this project while full-time staff are accounted for in the department’s operating budget. ENVIRONMENTAL ASSESSMENT: This is a project defined under CEQA as being Categorically Exempt [Section 15301(c) Existing streets, sidewalks, trails, and similar facilities]. A Notice of Exemption will be filed with the County.