Loading...
Staff Report. FY2021-22 Annual Street Repair and Resurfacing PREPARED BY: WooJae Kim Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 2/15/2022 ITEM NO: 7 DATE: February 4, 2022 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Annual Street Repair and Resurfacing Project (CIP No. 811-9901): a. Approve the Plans and Specifications; and b. Authorize Advertising the Project for Bid; and c. Authorize the Town Manager to Award and Execute a Construction Agreement in an Amount Not to Exceed $2,981,000, Including Contingencies; and d. Authorize Staff to Execute Future Change Orders in an Amount not to Exceed Ten Percent of the Contract Award Amount; and e. Authorize Revenue and Expenditure Increase for the Project in the Amount of $45,844 to Recognize an Increase in Gas Tax Revenues Anticipated for the Fiscal Year 2021/22 RECOMMENDATION: Staff recommends that the Town Council authorize the following actions for the Annual Street Repair and Resurfacing Project (CIP No. 811-9901): a. Approve the Plans and Specifications; and b. Authorize advertising the project for bid; and c. Authorize the Town Manager to award and execute a construction agreement in an amount not to exceed $2,981,000, including contingencies; and d. Authorize staff to execute future change orders in an amount not to exceed ten percent (10%) of the contract award amount; and e. Authorize revenue and expenditure increase for the project in the amount of $45,844 to recognize an increase in Gas Tax revenues anticipated for the Fiscal Year (FY) 2021/22. BACKGROUND: The adopted Fiscal Year (FY) 2021/22-2025/26 Capital Improvement Program (CIP) Budget designates funding for the Town’s Street Repair and Resurfacing Project (CIP No. 811-9901). PAGE 2 OF 4 SUBJECT: Annual Street Repair and Resurfacing Project (CIP No. 811-9901) DATE: February 4, 2022 BACKGROUND (continued): This is a recurring annual project for street rehabilitation activities throughout the Town to enhance safety for all travel modes and maintain the roadway infrastructure. It is important for the Town to keep up with the annual street maintenance projects each year to improve the Town’s roadways and prevent street pavements from deteriorating to more extensive and costly repair conditions. On December 21, 2021, the Town Council approved the proposed street list for the FY 2021/22 Street Repair and Resurfacing Project (Attachment 1), and authorized staff to move forward with the final design. The proposed street list was shared with utility companies, applicants of potential or approved developments, and neighboring agencies to coordinate and minimize potential conflicts. Once streets are paved, the Parks and Public Works Department (PPW) imposes a five-year moratorium on future street work. DISCUSSION: For the FY 2021/22 Street Repair and Resurfacing (Street) Project, the focus will be on preventive maintenance through rubber cape seal, slurry seal, and crack seal treatments of locations identified in the proposed street list. Due to conflicts with utility company projects and others, the following street segments on the Proposed Street List are deferred to a future year: STREET FROM TO CARLESTER DR CARLTON AV LESTER LN CARLTON AV LOS GATOS-ALMADEN RD LESTER LN CARLTON CT CARLTON AV END CARLTON WY CARLTON AV END CLEARVIEW DR LA RINCONADA DR WIMBLEDON DR CORINNE DR SUNRAY DR CHIRCO DR DOWNING OAK CT UNION AV END EASTVIEW DR LA RINCONADA DR CLEARVIEW DR HANCOCK CT EASTVIEW DR END SAN BENITO WY BRUCE AV END OF #17641 The updated Street List for the FY 2021/22 Street Project is included as Attachment 2. The engineer’s estimate to complete the proposed work for FY 2021/22 Street Project is $2,981,000, which includes ten percent for contingencies. The project will include 155,760 square yards of recycled rubberized asphalt cape seal work, 24,780 square yards of slurry seal, and 32,500 square feet of asphalt base failure repair work at various project locations. The PAGE 3 OF 4 SUBJECT: Annual Street Repair and Resurfacing Project (CIP No. 811-9901) DATE: February 4, 2022 DISCUSSION (continued): plans and specifications for the project are available for review on the PPW capital improvement webpage at www.losgatosca.gov/108/Capital-Improvement-Program. Once authorized by the Town Council to advertise for bid, the following is the anticipated schedule for the project: Milestones Anticipated Timeline Advertise the Project for Bid February 18, 2022 Bids Due March 15, 2022 Award and Execute Agreement April 2022 Start Construction May 2022 Anticipated Completion September 2022 Staff will conduct project outreach via social media platforms and distribute project notifications to inform the affected communities of the upcoming project. CONCLUSION: Approval of the recommendations allows the Town’s Annual Street Repair and Maintenance Project to move forward for bidding and award. It is important for the Town to complete their annual street maintenance project each year to prevent Town streets succumbing to more extensive and costly repair categories. COORDINATION: This project has been coordinated with the Finance Department. FISCAL IMPACT: There are sufficient funds in the FY 2021/22 – 2025/26 CIP budget for this year’s Street Repair and Resurfacing Project (CIP No. 811-9901). Also, a revenue and expenditure budget increase is recommended to recognize an increase of $45,844 in Gas Tax revenues for FY 2021/22 receipts. On December 21, 2021, the Town Council approved a reimbursement cost share agreement with the City of Campbell in an amount not to exceed $335,000 to be funded from the FY 2021/22 Repair and Resurfacing Project budget. The Town would reimburse the City of Campbell for the resurfacing related work completed on the Town’s right of way through their project. PAGE 4 OF 4 SUBJECT: Annual Street Repair and Resurfacing Project (CIP No. 811-9901) DATE: February 4, 2022 FISCAL IMPACT (continued): Staff costs are tracked for all projects. Tracking of staff costs allows for accountability in the costs of projects, recovery of costs from grant funded projects, and identification of future staffing needs. This project utilizes a combination of full-time budgeted staff and temporary staff that support fluctuating workloads. The costs for temporary staff will be directly associated with this project while full-time staff are accounted for in the department’s operating budget. Available project balance funds would be applied or carry forwarded to future Street Repair and Resurfacing Projects. ENVIRONMENTAL ASSESSMENT: This is a project defined under CEQA as being Categorically Exempt [Section 15301(c) Existing streets, sidewalks, trails and similar facilities]. A Notice of Exemption is filed with the County. Attachments: 1. Proposed Street List for FY 2021/22 dated 12/14/2021 2. Updated Street List for FY 2021/22 dated 2/4/2022 Budget Costs GFAR $2,471,318 Gas Tax $1,676,361 Gas Tax Increase $45,844 Total Budget $4,193,523 FY 2020/21 Street Project Closeout $200,000 FY 2021/22 Street Project Construction Estimate $2,710,000 10% Contingency $271,000 Cost Share - City of Campbell $335,000 Material Testing $30,000 Temporary Staff Costs $40,000 Other Project Related Costs $10,000 Total Expenditures $3,596,000 Remaining Budget $597,523 FY 2021/22 Street Repair and Resurfacing Project 811-9901