Loading...
FY 22-23 CIP PPT1 Town of Los Gatos Proposed FY 2022/23 –2026/27 Capital Improvement Program Budget Planning Commission -April 28, 2022 1 2Planning Commission Role Review the Proposed FY 2022/23 –2026/27 CIP Budget and make associated findings: o That this project is Categorically Exempt per Section 15061(b)(3) of California Environmental Quality Act Guidelines; and o That the projects in the Proposed FY 2022/23 -2026/27 CIP Budget are consistent with the General Plan, North 40 Specific Plan, Albright Specific Plan, and Hillside Specific Plan. 2 32022-24 Council Strategic Priorities 3 Council (CIP) Priorities: o Fire Protection –Vegetation Management o Comprehensive Parking Study Implementation o Develop Measure B Transportation Projects o Install Bicycle and Pedestrian Improvements o Address Summer/Rush Hour/School Traffic o Regional Transportation Issues o Community Engagement o Environmental Sustainability/Climate 4Flow of Town General Funds 4 5CIP Funding Sources 5 New Projects and Multiyear Projects (carryforward) All Other Funds • Traffic Mitigation • Grant • Storm Drain • Utility Underground 6Proposed FY 2022/23 –2026/27 Capital Improvement Program FY 2022/23 –2026/27 CIP Budget Proposed -$49.6M ❑Street Program •Street Reconstruction & Resurfacing •Maintenance and Safety •Street Improvements •Bridges ❑Parks and Trails Program •Park Improvement Projects •Trail Improvement Projects ❑Public Facilities Program •Infrastructure Projects •Equipment Projects 6 7CIP Categories and FY 2022/23 Budget 7 8General Plan Compliance Transportation Element Goals and Policies: •Annual Street Repair and Resurfacing •Winchester Boulevard Complete Streets •Bicycle and Pedestrian Improvements •Highway 17 Bicycle and Pedestrian Bridge Open Space, Parks, & Recreation Element Goals and Policies: •Los Gatos Creek Trail to Highway 9 Trailhead Connector •Open Space Trail Upgrades •Pinehurst Community Garden •Oak Meadow Bandstand Area Improvements 8 9General Plan Compliance Environmental and Sustainability Element Goals and Policies: •Annual Storm Drain Improvements •Stormwater System –Pollution Prevention Compliance •Battery Power Supply –Library •Vehicle Miles Traveled (VMT) Mitigation Program •Other Street Program contributing to GHG reduction Safety Element Goals and Policies: •Vegetation Management •Roadside Fire Fuel Reduction •Blossom Hill Road Traffic Safety •Traffic Calming Projects 9 10General Plan Compliance Human Services Element Goals and Policies: •ADA Transition Plan •Local Road Safety Plan •Parks Playground Fibar •Other Park Program projects 10 11Recommendation 1.Find that the project is Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, Section 15061(b)(3); 2.Find that the potential projects in the Proposed FY 2022/23 -2026/27 CIP are consistent with the General Plan, North 40 Specific Plan, Albright Specific Plan, and Hillside Specific Plan; and 3.Forward a recommendation of approval of the Proposed FY 2022/23 - 2026/27 CIP to the Town Council. 11 12Questions Questions and Discussions 12