Loading...
Exhibit A - ProposalDate: 9/8/2021 Proposal To (Contact):Daniel Keller Contact Email: Dkeller@losgatosca.gov Contract # 080819-SII Company: Town of Los Gatos Address: 41 Miles Ave City, ST, Zip:Los Gatos, CA 95030 Phone Number: 408-395-5310 Fax Number: Project Name: Los Gatos Community Center Sourcewell Member# Jobsite Address Company: Address:700 W Parr Ave City, ST, Zip:Los Gatos, CA 95032 Phone Number: Fax Number: Installation Company: Company Name Harry L. Murphy Inc. Contact: Jose Rojo Address: 42 Bonaventura Dr City, ST, Zip San Jose, CA 95134 Email: jose@harrylmurphy.com Phone Number: 408-807-9023 Fax Number: 408-955-1111 Local Contact (Sales Rep):Chelasea Schultz Shaw Project Manager:Melanie Taylor Email: Melanie.Taylor@shawinc.com Phone: 770-276-7502 Fax: 706-423-3293 Region 1 (WEST) : AK, CA, HI, ID, MT, NV, OR, WA Product Type Style Color Backing Units Unit of Measure Member Price Extended Carpet Tile Memory Tile Eco 310 SY 18.63$ 5,775.30$ Rexcourt Multi Purpouse Sports Flooring SY -$ -$ LVT Terrain 2 TBD 3850 SF 2.58$ 9,933.00$ Rubber Base 4" Topset TBD 17 Rolls 97.97$ 1,665.49$ Rubber Treads Round Raised Stair Treads TBD 6 Box 476.72$ 2,860.32$ Weld Rod -$ Open Market (If Applies)-$ 20,234.11$ Adhesives & Flooring Accessories Units Unit of Measure Member Price Extended 5000 Shaw Pressure Sensitive Adhesive 6 PAIL 81.54 489.24$ 1000 Shaw Multi Purpose Adhesive PAIL -$ 1200 Shaw Multi Purpose Adhesive PAIL -$ 4100 Resilient Adhesive 14 PAIL 147.83 2,069.62$ Tread and Landing Adhesive 3 PAIL 50.76 152.28$ 4151 Universal Adhesive PAIL -$ Shaw Cove Base Adhesive 7 PAIL 35.59 249.13$ 2,960.27$ Service Description Unit of Measure Quantity Installation Vendor Price (Can be less, but not to Exceed) Extended Price Installation Vendor will be paid Carpet Demolition (standard)SY 350 5.72$ 2,002.00$ Carpet Disposal SY 350 2.55$ 892.50$ Broadloom Carpet Installation (no pattern)SY 11.13$ -$ Carpet Tile Installation SY 250 11.26$ 2,815.00$ Carpet Border Work LF 3.87$ -$ 4" Vinyl Base Installation (excludes materials)LF 3,000 2.88$ 8,640.00$ VCT Installation (no pattern; excludes materials)SF 2.53$ -$ Transition Installation (excludes materials)LF 300 3.61$ 1,083.00$ Minor Floor Preparation (excludes materials)HR 300 86.90$ 26,070.00$ Furniture Removal and Replacement HR 76.47$ -$ Furniture Lift and Carpet Removal SY 27.68$ -$ LVT/VCT Demolition (standard)SF 3,746 1.74$ 6,518.04$ LVT/VCT Disposal SF 3,746 1.77$ 6,630.42$ **Rubber Stair Tread, 1 Piece Unit PC 36.00$ 70.81$ 2,549.16$ 18"X18" Rubber Landing Tile Install SF 100.00$ 7.83$ 783.00$ Sheet Vinyl Demolition (standard)SY 8.18$ -$ Sheet Vinyl Disposal SY 2.60$ -$ Skimcoat - Labor & Material (LVT requires two skimcoats)SF 8,388.00$ 2.36$ 19,795.68$ LVT Installation (no pattern; excludes materials)SF 3,850.00$ 4.35$ 16,747.50$ Sheet Vinyl Installation (no weld; cove; pattern; excludes materials)SF 4.35$ -$ Moisture Testing (quantity varies based on job size)EA 5.00$ 176.00$ 880.00$ Weld Rod Installation LF 2.88$ -$ Food (Per Diem)PP 73.28$ -$ Hotel / Motel Night 203.57$ -$ Mileage Reimbursement Mile 0.92$ -$ Project Management Fee (up to 18% of material cost) EA 27,492.70$ < 18%4,948.58$ Supplemental Benefits HR 22.00$ -$ TOTAL OF LABOR ON CONTRACT 100,354.88$ Open Market Unit of Measure Quantity Unit Installation Price Price Installation Vendor will be paid -$ -$ -$ -$ -$ -$ -$ -$ -$ TOTAL OF LABOR - OPEN MARKET -$ TOTAL OF LABOR ON CONTRACT & OPEN MARKET 100,354.88$ **Standard job size is a minimum of 200 SY for carpet tile & broadloom and 500 SF for resilient products. Additional charges may apply for smaller projects. **Supplemental Benefits to be utilized if prevailing wage rates exceed the labor rates listed above. Shaw Industries, Inc Sourcewell Labor Region 1 WEST - UNION LABOR **All labor pricing listed for regular time rates are "Not to Exceed." Overtime rates will apply for night/Saturday work at 1.5x regular time rates & Sunday/holiday at 2.0x regular time rates ** Stair tread pricing based on average - size of tread to be determined before pricing can be finalized. EXHIBIT A