Loading...
Attachment 5 - Revised CIP Graphical PresentationData Highlights Number of Projects that Address Some Element of:Project Funding Status # Projects Category Count Red 10 Safety 32 Yellow 2 Equity 31 Green 38 Quality of Life 34 Mandates 9 Capital Improvement 34 Capital Maintenance 19 Graphical Presentation Fiscal Year 2021/22 Capital Improvement Program The following pages provide an alternative look at the Town's Capital Improvement Program.   Some key highlights include: •This document is meant to be used in conjunction with the published budget and may reflect additional information not contained in the budget document, such as future funding needs. •This is an evolving effort and input to make it more useful is always welcome. Navigating the Worksheets: This Project Addresses: •Each project identifies a series of targets and measures the degree to which the project addresses those targets.  This can be found in the upper left box on each page. •The ratings may be subjective and discussion on the ratings may be appropriate. Project Challenges: Many projects have challenges.  These are addressed in this box. Funding Sources: An at a glance funding summary.  Additional information is available in the published CIP. Budget Estimate Summary: High level look at the design, construction, and total cost of a project. Funding Status: Reflection on the funds in place to deliver the project.  Red is low funding, green is high funding. Schedule (chart): Designates the percentage of the project costs for design and construction and a marker for the current  status. Schedule (table): Provides target dates for the project. Comments: Page 1 of 51 ATTACHMENT 5 Project: Annual Street Reconstruction & Resurfacing Budget Bk C‐6 Description: Pavement repair and repaving project townwide. Design 100,000$         Construction 6,070,196$      TOTAL 6,170,196$      Start 9/1/2020 Finish Design 8/1/2021 Finish Construction 11/1/2021 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 2010 Measure B 2016 Measure B RMRA Gas Tax 0% 20% 40% 60% 80% 100% Schedule Design Construction Due to project delivery schedule for previous fiscal year, the funding shows two years of funds. Project Challenges •Demand for pavement contractors affects scheduling/ availability. •Funding makes increasing Pavement Condition Index (PCI) difficult. Page 2 of 51 Project: Traffic Calming Budget Bk C‐12 Description: Work with resident requests for traffic calming solutions. Design 75,000$           Construction 175,000$         TOTAL 250,000$         Start 9/1/2020 Finish Design 8/1/2021 Finish Construction 11/1/2021 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction Funding assumes $50,000 per year in anticipated need for 5 year CIP. Often the construction for this project is completed under the annual pavement maintenance project. Community engagement efforts inherent with the project make this a staff resource intensive project. Project Challenges •Fundingadd of $10,000 per year does not  meet the demand for this program. •Requires significant staff hours. Page 3 of 51 Project: Curb, Gutter, & Sidewalk Budget Bk C‐14 Description: Concrete repair along roadways. Design 100,000$         Construction 608,906$         TOTAL 708,906$         Start 9/1/2020 Finish Design 6/1/2021 Finish Construction 8/30/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Due to project delivery for previous fiscal year, the funding shows two years of funds This project must precede pavement maintenance. In progress ADA Transition Plan will identify significant unfunded needs (est. December 2021). Comments: Project Challenges •ADA requirements for curb ramps at  intersections utilizes almost all of the funds. •Little funding left over for sidewalk repair of  trip hazards. Page 4 of 51 Project: Retaining Wall Repairs Budget Bk C‐16 Description: Repair structurally deficient retaining walls. Design 116,314$         Construction 348,941$         TOTAL 465,254$         Start 12/1/2021 Finish Design 6/1/2022 Finish Construction 12/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Typically funded annually at $100,000.  Funding curtailed in FY 2022/23 and FY 2023/24 to balance annual CIP  funding. Comments: Project Challenges •Comprehensiveassest assessment needed. Page 5 of 51 Project: Annual Street Restriping Budget Bk C‐18 Description: Restripe Town streets Design 48,568$           Construction 145,704$         TOTAL 194,272$         Start 12/1/2021 Finish Design 6/1/2022 Finish Construction 10/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Typically funded annually at $25,000.  Project often combined with annual pavement maintenance project.Comments: Project Challenges Page 6 of 51 Project: Guardrail Replacement Budget Bk C‐20 Description: Replace guardrails throughout Town Design 262,534$         Construction 787,603$         TOTAL 1,050,137$      Start 9/1/2020 Finish Design 3/1/2021 Finish Construction 9/15/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants & Awards 0% 20% 40% 60% 80% 100% Schedule Design Construction HSIP grant funded most of the project. New guardrail current to new Caltrans standards.Comments: Project Challenges Page 7 of 51 Project: Massol Intersection Improvements Budget Bk C‐22 Description: Safety improvements to Massol intersection at Highway 9 Design 126,787$         Construction 380,361$         TOTAL 507,148$         Start 6/1/2020 Finish Design 12/1/2020 Finish Construction 9/15/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Punchlist items remain.Comments: Project Challenges Page 8 of 51 Project: Shannon Road Repair Budget Bk C‐24 Description: Repair failing roadway between Santa Rosa and Sky Ln. Design 1,500,000$      Construction 3,500,000$      TOTAL 5,000,000$      Start 6/1/2020 Finish Design 3/1/2022 Finish Construction 12/30/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction Potential future adjacent development project.Comments: Project Challenges •  Funding deficient. •  Existingroadway may be on private property. Page 9 of 51 Project: Roadside Fire Fuel Reduction Budget Bk C‐26 Description: Reduce fire risk through enhanced roadside maintenance. Design 220,000$         Construction 2,400,000$      TOTAL 2,620,000$      Start 1/1/2020 Finish Design 10/1/2020 Finish Construction 12/30/2023 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction Phase one project completed in December 2020 utilizing GFAR funds.  Vegetation management plan submitted to  FEMA for potential future funding. Comments: Project Challenges •  Funding ask from FEMA needed to continue  project. Page 10 of 51 Project: Parking Lot 4 Repair & Waterproofing Budget Bk C‐28 Description: Concrete repair and waterproofing. Design 220,000$         Construction 30,000$           TOTAL 250,000$         Start 1/1/2021 Finish Design 10/1/2021 Finish Construction 5/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •  Difficulting finding contractors interestedin the  work. Page 11 of 51 Project: Downtown Parking Lot Sealcoat & Restripe Budget Bk C‐34 Description: Seal coat of parking lots Design 5,259$              Construction 47,327$           TOTAL 52,585$           Start 11/1/2021 Finish Design 5/1/2022 Finish Construction 9/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction ADA Transition plan will identify striping needs.Comments: Project Challenges •  Difficulting finding contractors interestedin the  work. Page 12 of 51 Project: Hernandez Ave Storm Drain Improvements Budget Bk C‐36 Description: Underground storm drain. Design 13,000$           Construction 52,000$           TOTAL 65,000$           Start 10/1/2024 Finish Design 10/1/2025 Finish Construction 6/1/2026 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Storm Basin Funds 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 13 of 51 Project: Shannon Road Ped and Bike Improvements Budget Bk C‐38 Description: Improvements on Shannon between Los Gatos Boulevard and Cherry Blossom Design 356,791$         Construction 832,513$         TOTAL 1,189,304$      Start 3/1/2021 Finish Design 9/1/2022 Finish Construction 9/1/2023 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants Utility Underground 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •  Constrained right of way. Page 14 of 51 Project: Sidewalk Improvements ‐ Multiple Locations Budget Bk C‐40 Description: Focus on infill sidewalk needs. Design 6,000$              Construction 54,000$           TOTAL 60,000$           Start 9/1/2021 Finish Design 4/1/2022 Finish Construction 9/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 15 of 51 Project: Utility Undergrounding Budget Bk C‐42 Description: Underground utilities along Los Gatos Boulevard south of Lark to Chirco. Design 990,000$         Construction 2,310,000$      TOTAL 3,300,000$      Start 10/1/2020 Finish Design 1/1/2021 Finish Construction 12/30/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources PGE Rule 20 Funds Utility Underground 0% 20% 40% 60% 80% 100% Schedule Design Construction A change in the Rule 20 program means this is the last undergrounding opportunity with that program.Comments: Project Challenges •  PG&E run and managed. Page 16 of 51 Project: Traffic Signal Modernization Budget Bk C‐44 Description: Upgrade traffic signal controls. Design 786,885$         Construction 1,836,066$      TOTAL 2,622,951$      Start 6/1/2018 Finish Design 3/1/2021 Finish Construction 12/30/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Grants Traffic Mitigation 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 17 of 51 Project: Bicknell Road Storm Drain Improvements Budget Bk C‐46 Description: Replace and upgrade storm drain. Design 73,857$           Construction 172,333$         TOTAL 246,190$         Start 9/1/2019 Finish Design 3/1/2021 Finish Construction 11/1/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Storm Basin Funds 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 18 of 51 Project: Bike and Ped improvements Budget Bk C‐48 Description: Enhance bike and ped safety throughout Town. Design 220,178$         Construction 513,749$         TOTAL 733,927$         Start 6/1/2021 Finish Design 9/1/2021 Finish Construction 5/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants Traffic Mitigation 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 19 of 51 Project: Stormwater‐ Pollution Prevention Compliance Budget Bk C‐50 Description: Install projects that support compliance with the State issued regional stormwater permit. Design 86,400$           Construction 201,600$         TOTAL 288,000$         Start 10/1/2021 Finish Design 4/1/2022 Finish Construction 9/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 20 of 51 Project: Parking Program Implementation Budget Bk C‐52 Description: Phased implemenation of the Downtown Parking Roadmap. Design 99,250$           Construction 99,250$           TOTAL 198,500$         Start 3/1/2021 Finish Design 9/1/2021 Finish Construction 6/30/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •  Funding insufficient for necessary scope.  Phasing  project will allow for continued progress. Page 21 of 51 Project: Annual Storm Drain Improvement Budget Bk C‐54 Description: Install infill storm systems. Design 189,000$         Construction 441,000$         TOTAL 630,000$         Start 1/1/2022 Finish Design 6/1/2022 Finish Construction 10/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Storm Basin 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •  Funding allows for incrememntal projects to address  some of the need. Page 22 of 51 Project: ADA Transition Plan Budget Bk C‐56 Description: Update ADA Transition Plan Design 145,000$         Construction ‐$                  TOTAL 145,000$         Start 3/1/2021 Finish Design 10/1/2021 Finish Construction 3/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction This project will identify significant deficiencies Townwide.  Future funding will be required for capital projects to  address the deficiencies. Comments: Project Challenges Page 23 of 51 Project: Highway 17/9 Interchange Design Budget Bk C‐58 Description: Interchange modernization and mainline improvements. Design 4,000,000$         Construction ‐$                      TOTAL 4,000,000$         Start 3/1/2020 Finish Design 6/1/2025 Finish Construction 12/1/2027 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Grants Traffic Mitigation 0% 20% 40% 60% 80% 100% Schedule Design Construction The Town has committed to $600,000 for project design as a 10% match as required by 2016 Measure B.  VTA is the  lead for the project and all project funds will be held by VTA.  The Town will need to work with VTA to source  additional funds for future project phases. Construction in excess of $90M. Comments: Project Challenges •  Funding for construction not yet identified. •  Assumes 2016 Measure B for PS&E phase of design. •  Project led by VTA and Caltrans. Page 24 of 51 Project: Downtown Streetscape & Econ Recovery Budget Bk C‐60 Description: Economic recovery from COVID‐19 as a repurpose of funds for Downtown streetscape. Design 3,900,000$      Construction 9,100,000$      TOTAL 13,000,000$   Start 3/1/2021 Finish Design 9/1/2021 Finish Construction 12/31/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction Current project schedule reflects economic reocvery project. Estimated cost for downtown streetscape project at $11M.  Original $2M set aside repurposed for economic  recovery.  Consider seven plus years for streetscape project to allow for additional project funding, design,  stakeholder engagement, etc. With funding available, would start streetscape discussion in 2023, allowing for  temp parklets to cosntruct and economic recovery to occur.   Comments: Project Challenges •  No funding source for future project phases. Page 25 of 51 Project: East Main Street Speed Table Budget Bk C‐62 Description: Create speed tables at crosswalks for traffic calming. Design 45,000$           Construction 105,000$         TOTAL 150,000$         Start 4/1/2022 Finish Design 10/1/2022 Finish Construction 12/31/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction This project is a good candidate for grant funding due to its proximity to the High School.  Comments: Project Challenges •  Need grant funding for most of the project. Page 26 of 51 Project: Local Roadway Safety Plan Budget Bk C‐64 Description: Develop a plan for safety improvements on local roads. Design 100,000$         Construction ‐$                  TOTAL 100,000$         Start 1/1/2021 Finish Design 11/30/2021 Finish Construction n/a Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction This project will identify and prioritize a list of roadway safety projects.Comments: Project Challenges Page 27 of 51 Project: Blossom Hill Road Traffic Safety Budget Bk C‐66 Description: Implement traffic safety measures on Blossom Hill Road between Camelia Terrace and Hillbrook. Design 308,750$         Construction 926,250$         TOTAL 1,235,000$      Start 1/1/2020 Finish Design TBD Finish Construction TBD Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction This project is a good candidate for grant funding due to its proximity to Blossom Hill SchoolComments: Project Challenges •  Need funding for design and construction. Page 28 of 51 Project: Winchester Class IV Bikeway Budget Bk C‐68 Description: Install Class IV Bikeway on Winchester between Blossom Hill and Lark Ave. Design 196,491$         Construction 785,964$         TOTAL 982,455$         Start 9/1/2020 Finish Design 4/1/2021 Finish Construction 11/1/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 29 of 51 Project: VMT Mitigation Program Budget Bk C‐70 Description: Nexus study to establish a Vehicle Miles Travelled fee program. Design 250,000$         Construction ‐$                  TOTAL 250,000$         Start 9/1/2021 Finish Design 2/1/2022 Finish Construction n/a Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Timing to overlap General Plan update with conclusion following adoption of GP.Comments: Project Challenges Page 30 of 51 Project: Kennedy Sidewalk ‐ LGB to Englewood Budget Bk C‐72 Description: Install sidewalk and Class II bike lane on Kennedy. Design 237,800$         Construction 951,200$         TOTAL 1,189,000$      Start 9/1/2022 Finish Design TBD Finish Construction TBD Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •  This project has 2016 Measure B funds with scheduled  availability of funds in 2023. Page 31 of 51 Project: Winchester Boulevard Complete Streets Budget Bk C‐74 Description: Conceptual enginnering and final design for a complete streets project on Winchester. Design 2,477,500$      Construction ‐$                  TOTAL 2,477,500$      Start 4/1/2020 Finish Design 10/1/2022 Finish Construction n/a Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction The Winchester Class IV Project (budgeted separately) will provide insight into this project development.Comments: Project Challenges •  Construction costs not included in this project  summary. Page 32 of 51 Project: Quito Road Bridge Replacement Budget Bk C‐80 Description: Replace the bridge on Quito Road near Moore Ave Design 69,936$           Construction 279,745$         TOTAL 349,681$         Start 5/1/2002 Finish Design 6/1/2022 Finish Construction 9/1/2023 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Budget reflects the Town contribution to the project.  Other contributions from City of Saratoga and Valley Water  in addition to grant funding from Federal Highway Bridge Replacement and Rehabilitiation funds. Comments: Project Challenges •  Shared ownership with City of Saratoga  •  Saratoga as lead means little Town control of project Page 33 of 51 Project: Highway 17 Bicycle & Ped Overcrossing Budget Bk C‐82 Description:  Design and construct an overcrossing at Blossom Hill Road Design 3,700,000$      Construction 10,300,000$   TOTAL 14,000,000$   Start 1/1/2020 Finish Design 8/1/2022 Finish Construction 12/1/2024 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Traffic Mitigation 2016 Measure B Unfunded 0% 20% 40% 60% 80% 100% Schedule Design Construction Project is currently in final design stage. Project Challenges •Construction Funding not yet identified. Page 34 of 51 Project: Plaground Fibar Project Budget Bk D‐6 Description: Replace fibar in park playgrounds. Design ‐$                  Construction 175,000$         TOTAL 175,000$         Start 9/1/2021 Finish Design 11/1/2021 Finish Construction 12/1/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges Page 35 of 51 Project: Town Plaza Turf Repair Budget Bk D‐8 Description: Replace the turf due to heavy foot traffic. Design ‐$                  Construction 28,000$           TOTAL 28,000$           Start 9/1/2021 Finish Design 11/1/2021 Finish Construction 4/1/2022 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges • Scheduling availability for the Plaza. Page 36 of 51 Project: Outdoor Fitness Equipment Budget Bk D‐10 Description: Install outdoor fitness equipment Design ‐$                  Construction 60,000$           TOTAL 60,000$           Start 6/1/2019 Finish Design 4/1/2021 Finish Construction 11/1/2021 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Comments: Project Challenges •Work is pending staff availability for installing ramp to  Los Gatos Creek Trail. Page 37 of 51 Project: Vegetation Management Townwide Budget Bk D‐12 Description: Vegetation management in open space areas Design 220,000$         Construction 1,330,000$      TOTAL 1,550,000$      Start 1/1/2020 Finish Design 6/1/2022 Finish Construction 12/1/2023 Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction This project has been a two phased project developing a project that can receive FEMA funding.  The first phase  of completing a Vegetation Managemetn Plan is complete.  FEMA has an extensive review period prior to  authorizing future phases. Comments: Project Challenges • FEMA process for grant funding has uncertain timeline. Page 38 of 51 Project: Oak Meadow Park Bandstand Improvements Budget Bk D‐14 Description:  Renovate the area around the Lyndon Bandstand. Design 89,181$           Construction 356,723$         TOTAL 445,904$         Start 9/1/2021 Finish Design 3/1/2022 Finish Construction 9/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grant 0% 20% 40% 60% 80% 100% Schedule Design Construction Concept design complete.   Funing through State Prop 68. Project Challenges Page 39 of 51 Project: Open Space Trail Upgrades Budget Bk D‐20 Description:  Upgrade trails in open space to remove tripping hazards, ruts, and old header board. Design ‐$                  Construction 152,000$         TOTAL 152,000$         Start 9/1/2021 Finish Design 3/1/2022 Finish Construction 9/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources OS Reserve 0% 20% 40% 60% 80% 100% Schedule Design Construction This project delayed due to SJ Water work at upper part of Belgatos Park. Project Challenges Page 40 of 51 Project: Charter Oaks Trail Repair Budget Bk D‐22 Description:  Modify the trail along Charter Oaks to reduce flooding during heavy rain events. Design 70,000$           Construction 280,000$         TOTAL 350,000$         Start 9/1/2021 Finish Design 9/1/2022 Finish Construction 3/1/2023 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Funding from Albright project committed to use in the area to benefit neighbors. Project Challenges Page 41 of 51 Project: Trailhead Connector Project Budget Bk D‐24 Description: Design and construct a connector from Highway 9 to the Los Gatos Creek Trail Design 713,280$         Construction ‐$                  TOTAL 713,280$         Start 3/1/2020 Finish Design TBD Finish Construction TBD Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges •Caltrans owns the creek and adjacent parcel  and would like to relinquish that to the Town.   •Construction funding not yet identified. Page 42 of 51 Project: Building Replacement Corp Yard Budget Bk E‐6 Description: Replace office building. Design 383,160$         Construction 1,532,640$      TOTAL 1,915,800$      Start 6/1/2020 Finish Design 3/1/2021 Finish Construction 4/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Project phased.  Phase 1tenant improvement to storage space and existing office.  Phase 2 demolish old office  and reconstruct storage building. Project Challenges •  Asbestos and old infrastructure. Page 43 of 51 Project: Town Beautification Budget Bk E‐8 Description: Various beutification projects, focusing on utility boxes. Design ‐$                  Construction 169,625$         TOTAL 169,625$         Start 12/1/2020 Finish Design 4/1/2021 Finish Construction 6/1/2021 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Utility box program includes work with the Arts Commission to select designs. Ongoing project funded at $10,000 per year. Project Challenges Page 44 of 51 Project: ADA Upgrade to Restroom at Adult Rec Building Budget Bk E‐10 Description: Restroom upgrade Design 78,594$           Construction 183,385$         TOTAL 261,979$         Start 6/1/2021 Finish Design 4/1/2022 Finish Construction 9/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges •  Building space is constrained. Page 45 of 51 Project: ADA Restrooms & HR Offices Budget Bk E‐12 Description: Tenant Improvement Design 180,000$         Construction 420,000$         TOTAL 600,000$         Start 6/1/2021 Finish Design 6/1/2022 Finish Construction 11/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges •  Building space is constrained. Page 46 of 51 Project: Waterproofing Budget Bk E‐14 Description: Roofing and siding replacement and rehab. Design ‐$                  Construction 75,000$           TOTAL 75,000$           Start 2/1/2021 Finish Design 6/1/2022 Finish Construction 11/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges Page 47 of 51 Project: Sound Mitigation In Library Lobby Budget Bk E‐16 Description: Install baffling in lobby. Design ‐$                  Construction 22,000$           TOTAL 22,000$           Start 10/1/2021 Finish Design 1/1/2022 Finish Construction 6/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources Library Trust 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges Page 48 of 51 Project: Fire Suppression for Server Rooms Budget Bk E‐18 Description: Install specialized fire suppression system. Design ‐$                  Construction 144,396$         TOTAL 144,396$         Start 3/1/2020 Finish Design 6/1/2020 Finish Construction 11/1/2021 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges Page 49 of 51 Project: Adult Recreation Center Floor Replacement Budget Bk E‐20 Description: Replace flooring and upgrade flooring in multi purpose room. Design ‐$                  Construction 200,000$         TOTAL 200,000$         Start 6/1/2021 Finish Design 8/1/2021 Finish Construction 12/1/2021 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges •  Building space is constrained. Page 50 of 51 Project: Battery Power Supply ‐ Library Budget Bk E‐22 Description: Add backup battery system to Libarary Design 108,600$         Construction 434,400$         TOTAL 543,000$         Start 3/1/2021 Finish Design 10/1/2021 Finish Construction 6/1/2022 Comments:   Budget Estimate Summary Schedule 012345 Capital Maintenance Capital Improvement Mandates Quality of Life Equity Safety This Project Addresses: 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Funding Status Funding Sources GFAR Grants 0% 20% 40% 60% 80% 100% Schedule Design Construction Project Challenges Page 51 of 51