Exhibit B - ScopeProject:Project No.: 60857Project Manager:Mark BrandiNo. Date Description of Change Reason for Change Time Impact Cost of Change1 Summer 2020Digitized Roadways of ConcernNo data available from Town8 hrs1,326.00$ 2 Summer 2020Digitized Evacuation RoutesNo data available from Town8 hrs1,326.00$ 3 Summer 2020Evaluated Evacuation RoutesExpanded extent of evaluation18 hrs2,594.00$ 4 Summer 2020Digitized Wildland Urban InterfaceNo data available from Town10 hrs1,746.00$ 5 Summer 2020Project Cost Estimate and Phasing Schedule for RoadwaysClient Request - Separate deliverables 31 hrs6,620.00$ 6 Fall 2020Add Belgatos Park to VMPClient Request7.5 hrs908.50$ 7 Winter 2020Incorporate Ad-Hoc Wildfire Committee Report into VMPClient Request (after draft VMP completed) 9 hrs1,495.00$ 8Winter 2020-Spring 2021Additional meetings due to extended project scheduleCheck-in meetings with client17.5 hrs3,762.50$ 9 Spring 2021Revise Santa Rosa / Hientz parcel boundaries (base maps/calculations)Client Request (Town GIS incorrect)14.5 hrs1,665.50$ 11 Spring 2021Additional Tables/Contractor guidance packets for each Open Space Area Client Request for contractors32.5 hrs3,651.50$ 10 Spring 2021Sensitive Habitat MappingClient Request for contractors7.25 hrs822.75$ Total25,917.75$ Los Gatos Vegetation Management PlanADDITIONAL SERVICES SUMMARY Note: This Additional Services Summary does not include time associated with coordinating and incorporating additional rounds of revisions into the VMP document, which would increase the total cost of the additional services that have been provided to-date.EXHIBIT B