Loading...
04 Attachment 1Page 1 of 2 Cuschieri Horton Architects – First Amendment to Agreement for Consultant Services FIRST AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES This FIRST AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES is dated for identification this 2nd day of March 2021 and amends that certain AGREEMENT FOR CONSULTANT SERVICES dated October 3, 2018, made by and between the TOWN OF LOS GATOS, ("Town,") and Cuschieri Horton Architects (“Consultant”). RECITALS A.Town and Consultant entered into an Agreement for Consultant Services on October 3, 2018 (“Agreement”), a copy of which is attached hereto and incorporated by reference as Attachment 1 to this Amendment. B.Town desires to amend the Agreement to add to the scope of services and provide additional compensation for Design Services and Fire Water Underground Design Services to support tenant improvements (TI) at the Town’s Engineering Building. AMENDMENT 1.Section 2.1 Scope of Services is amended to read: Consultant shall provide services as described in that certain Cost Proposal sent to the Town on October 10, 2020, which is hereby incorporated by referenced and attached as Exhibit B. 2.Section 2.6 Compensation is amended to read: Additional compensation for Consultant’s professional services shall be $16,350, for a total agreement not to exceed $165,350. 3.All other terms and conditions of the Agreement remain in full force and effect. ATTACHMENT 1 Page 2 of 2 Cuschieri Horton Architects – First Amendment to Agreement for Consultant Services IN WITNESS WHEREOF, the Town and Consultant have executed this Amendment. Town of Los Gatos by: Consultant by: _______________________________ ______________________________ Laurel Prevetti Town Manager ______________________________ Name/Title Recommended by: __________________________________ Matt Morley Director of Parks and Public Works Approved as to Form: __________________________________ Robert Schultz, Town Attorney Attest: __________________________________ Shelley Neis, MMC, CPMC, Town Clerk Cuschieri Horton Architects APC Architecture Planning Interiors 10 October 2020 CHA Add Service 1 - Proposal 1 Cuschieri Horton Architects ● 20 S. Santa Cruz Ave, Suite 108, Los Gatos, CA ● 408.371.8200 10 October 2020 CHA# 1826.01 Matt Morley Director Parks and Public Works Department Town of Los Gatos 41 Miles Avenue, Los Gatos, CA 95030 Project / Location: TLG – Engineering Building TI & Storage Building 41 Miles Avenue, Los Gatos, CA 95030 RE: Additional Services #1 Fee Proposal for Additional Design Services for Fire Water Underground Design Submittal to Connect to the Proposed Storage Building. Dear Matt, Please find enclosed Cuschieri Horton Architects (CHA) request for approval of additional Architectural and Engineering services for the above noted project. This proposal represents an additional scope of work for Fire Water underground work connection to the proposed Storage Building, which was not covered within our original project proposal #201832, dated 06/01/18, nor any prior additional design service proposals, and a result of the Santa Clara County Fire Department Review comments and requirements. SCOPE OF WORK: This added scope of work includes: Provide plans for a new fire water connection to the proposed Storage Building. Provide supplemental topographic survey of the area showing existing water features (hydrants and valves), locations of utility vaults, manholes, catch basins and invert information of storm and sanitary sewers, underground utility lines such as gas, water, electric, and any onsite utilities. Address 2nd review comments relating to the fire water connection to the proposed Storage Building (Civil comments only). This will require modifications and additional drawings to be issued for the Town of Los Gatos Building Dept for review and approval. Therefore, this fully executed agreement will constitute approval for A/E services expended as noted above, as well as incorporation into the overall permitted project set during CA phase of work. ASSUMPTIONS: AOR efforts in the coordination and preparation of the Fire Water underground drawing revisions for the proposed Storage Building to be submitted to the Town of Los Gatos Building Department review and approval. Change in Scope, increase in Schedule, &/or any unforeseen conditions may result in add services. All prior assumptions and scope noted within original and prior approved proposal(s) remain applicable for this additional service proposal unless otherwise updated or noted above. See attached Consulting Engineer’s proposal for their respective Assumptions. EXCLUSIONS (can be provided as an additional service & billed at current SOC, if needed): Preparation of documentation beyond those described above and within this proposal. EXHIBIT B Cuschieri Horton Architects APC Architecture Planning Interiors 10 October 2020 CHA Add Service 1 - Proposal 2 Cuschieri Horton Architects ● 20 S. Santa Cruz Ave, Suite 108, Los Gatos, CA ● 408.371.8200  Additional revisions during CA period.  All prior exclusions and scope noted within original approved proposal remain applicable for this additional service proposal unless otherwise updated or noted above.  See attached Consulting Engineer’s proposal for their respective Exclusions. PROFESSIONAL FEES: Town of Los Gatos Engineering Building TI and Storage Building Additional Services #1 Fees Fire Alarm/Fire Sprinkler/Fire Water Underground Submittal CHA – Cuschieri Horton Architects Architectural Design Services $ 8,500 Sandis Fire Water Underground Design Services $ 7,850 (Add Services): $16,350 We propose the following CHA Staff and SOC rates for this project: Project Manager– Dan Cuschieri, Architect, (Hourly rate: $170/hr.) Senior Designer – Ray Bolisay (Hourly rate: $150/hr.) Job Captain – Sanobar Girap (Hourly rate: $135/hr.) CAD drafter (Hourly rate: $115/hr.) Reimbursable Charges: Computed at cost + 10%. AGREEMENT FOR SERVICES: Above noted services will be provided in accordance with the standard AIA agreement, to be provided by CHA. If the TLG has their own agreement, please provide to CHA for review and execution. CHA will proceed with these services following distribution, review and our receipt of TLG signed approval followed by an executed Agreement between CHA and TLG, issued for these services. Services outside this proposed scope of work will be billed hourly per CHA and CHA’s engineering consultant’s current schedule of charges, following Owner approval of such additional work. Thank you for your consideration and approval of this additional work. Please call with any questions. Sincerely Dan Cuschieri, AIA, Principal By signing below, you have acknowledged acceptance of the terms, fees, & conditions of this proposal letter, and authorize Cuschieri Horton Architects to proceed with the proposed services, included with any amendment to the fully executed prime agreement. (Please email signed/executed color copy to CHA) ________________________________________________________________ ______________________ Signature of Owner representative (s) Date ________________________________________________________________ __________________________________________________________ Full Name of Owner representative(s) Cc: Tony Cuschieri (CHA), Kristi Pearce-Percy (CHA), Jeannette Keplinger (CHA) 1700 S. Winchester Boulevard | Campbell, CA 95008 | T: 408.636.0900 | www.sandis.net SILICON VALLEY TRI-VALLEY CENTRAL VALLEY SACRAMENTO EAST BAY/SF August 12, 2020 Project No. 218290 Dan Cuschieri Cuschieri Horton Architects 1475 S. Bascom Avenue, Suite 204 Campbell, CA 95008 T: 408.371.8200 E: dan@charch.com RE: LOS GATOS ENGINEERING BUILDING TI ASR #1 – SURVEYING & ENGINEERING SERVICES LOS GATOS, CA Dear Dan, This letter is our amendment to the original proposal dated May 23, 2018, for the above referenced project. The following scope of work is included in this amendment: SUPPLEMENTAL TOPOGRAPHIC SURVEY $3,600 Perform a supplemental topographic survey of the area per the attached Exhibit A. Provide field and office work to produce a supplemental topographic survey at a scale of 1" = 20'. This survey will show the location of the underground utility locating paint marks. The location of utility vaults, manholes, catch basins and invert information of storm and sanitary sewers will be shown based upon a field survey. The location of underground utility lines such as gas, water, electric, and any onsite utilities will be shown based upon available agency records and mechanical detection of existing utilities. Existing water features (hydrants and valves) in the area of the proposed POC will also be documented. Mechanical locating services will be provided for detectable utilities using standard locating methods as listed in the California Government Code section 4216 through 4216.9. Depths and sizes of conduits will not be provided unless specifically requested in advance. Empty conduits, irrigation lines, hose bibs and abandoned utilities will also not be located unless specifically requested in advance. A reasonable effort will be made to locate existing subsurface utilities but individual field conditions will dictate the thoroughness of our survey. Only actual excavation will reveal the locations of such utilities. We reserve the right to utilize aerial survey techniques if deemed appropriate for scope and site features. Aerial survey will be supplemented with conventional survey for utility information and survey under trees or areas not visible from above. Aerial spot elevations for aerial survey will be shown to an accuracy of ±0.1 (one tenth) of a foot. ENGINEERING SERVICES $4,250 Provide a utility plan for a new fire water connection to the proposed structure. Submit to San Jose Water for review and approval. Coordinate with the subconsultants. Respond to two (2) rounds of review comments. August 12, 2020 Project No. 218290 Dan Cuschieri Cuschieri Horton Architects Page 2 1700 S. Winchester Boulevard | Campbell, CA 95008 | T: 408.636.0900 | www.sandis.net SILICON VALLEY TRI-VALLEY CENTRAL VALLEY SACRAMENTO EAST BAY/SF These services will be provided for the amounts listed above and will be performed under the terms and conditions of our original contract. Please return one signed copy of this letter to our Campbell office as your authorization to proceed. proceed. Regards Approved CUSCHIERI HORTON ARCHITECTS Stephen Yazalina By: Project Manager Title: Date: Chad Browning, PE, LEED AP, QSD/P Associate Principal Attachments: Exhibit A Exhibit A ATTACHMENT 1