05 Staff Report.Energy Efficiency Upgrades Town-wide Project Close Out PREPARED BY: Jim Harbin Superintendent Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Director of Parks and Public Works 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 10/06/2020 ITEM NO: 5 DATE: September 30, 2020 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Accept the Completion of Work Performed by Syserco Energy Solutions, Inc. for PPW Job No. 411-821-2008 Energy Efficiency Upgrades RECOMMENDATION: Accept the completion of work performed by Syserco Energy Solutions, Inc. for PPW Job No. 411-821-2008 Energy Efficiency Upgrades. BACKGROUND: At the October 2, 2018 Town Council Meeting, Council authorized the Town Manager to execute an Energy Services Agreement with Syserco Energy Solutions, Inc. for the design, installation, and commissioning of heating, ventilation and air conditioning (HVAC), building envelope, and lighting improvements at various Town facilities for a total project cost not to exceed $1,664,358. The delivery method chosen for the project was taken from a specific section of the California Government Code (4217.10 et seq) that allows for entering into design-build energy services contracts where the Town would work directly with a licensed contractor to develop and complete energy efficiency projects. DISCUSSION: Syserco Energy Solutions, Inc. has satisfactorily completed all of the work for the project for a final contract amount of $1,664,358. PG&E has completed its project verification report and approved the On-Bill Financing zero percent loan in the amount of $1,560,335.60. The check was delivered to the Town on August 9, 2020. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town’s acceptance of the project. PAGE 2 OF 2 SUBJECT: Accept the Completion of Work Performed by Syserco Energy Solutions, Inc. for PPW Job No. 411-821-2008 Energy Efficiency Upgrades DATE: September 30, 2020 CONCLUSION: Staff recommends accepting the completion of work performed by Syserco Energy Solutions, Inc. called for in the agreement with the Town of Los Gatos dated September 19, 2018. The Town will pay back the loan through payments on the PG&E bill for each location where work was done. The energy savings over the loan period are calculated to be less than the cost of the total financed improvements. However, all the improvements will ultimately be financed through anticipated energy savings. FISCAL IMPACT: Staff completed the project within the approved budget as shown below. The savings will go to the GFAR fund balance. Energy Efficiency Upgrades - Town-wide Project 821-2008 Budget Costs GFAR $1,696,687 Total Project Budget $1,696,687 Syserco Energy Solutions $1,664,358 Advertising $139 Total Project Costs $1,664,497 Project Savings $32,190 ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and no further action is required.