Loading...
10 Addendum - Highway 17 BPOC PREPARED BY: Ying Smith Transportation and Mobility Manager Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 09/01/2020 ITEM NO: 10 ADDENDUM DATE: August 31, 2020 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Highway 17 Bicycle and Pedestrian Overcrossing Recommendations (Project 818-0803): a. Approve the Feasibility Study for the Highway 17 Bicycle and Pedestrian Overcrossing (Project 818-0803); b. Proceed with the final design of a separate bridge structure between 16 and 20 feet wide located immediately south of the Blossom Hill Road Bridge c. Authorize staff to proceed with analyzing three bridge type options: concrete, steel truss, and steel arch, and solicit community input in the final design phase; d. Authorize the Town Manager to submit a grant application to Caltrans in the Active Transportation Program, seeking grant funds for project construction; and e. Commit up to $1 million in future budget (FY 2023/24) as match funding for the ATP grant. REMARKS: This addendum reflects public comment received from 11:01 a.m., Thursday, August 27, 2020 through 11:00 a.m., Monday, August 31, 2020. Attachment received with this Addendum: 1. Public comment received from 11:01 a.m., Thursday, August 27, 2020 through 11:00 a.m., Monday, August 31, 2020.