08 Exhibit A FY 2020-21 Comprehensive Fee Schedule with Proposed Library Fees (Redline)C A L I F O R N I A
Town of Los Gatos
Comprehensive Fee Schedule
Fiscal Year 2020/21 EXHIBIT A
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule
TABLE OF CONTENTS
Administrative Fees ............................................................................................................... 1
Attorney Fees ........................................................................................................................ 3
Development Services
General Development Fees ............................................................................................................ 4
Building Division Fees ..................................................................................................................... 6
Building Permit Fees ....................................................................................................................... 6
Electrical Permit Fees ...................................................................................................................... 9
Mechanical Permit Fees ................................................................................................................ 11
Plumbing Permit Fees ................................................................................................................... 11
Other Fees ..................................................................................................................................... 13
Planning Division Fees...................................................................................................... ……………13
Zoning Approvals .......................................................................................................................... 14
Subdivisions .................................................................................................................................. 18
Miscellaneous Application Fees .................................................................................................... 19
Environmental Assessment Fees .................................................................................................. 19
Other Fees ..................................................................................................................................... 21
Engineering Division Fees ............................................................................................................. 22
Library Fees and Fines ......................................................................................................... 26
Parks and Public Works
Parks Division Fees ........................................................................................................................ 27
Oak Meadow Park Fees ................................................................................................................ 27
Creekside Sports Park Fees ........................................................................................................... 28
Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor Park Fees ......................................... 28
Town Plaza Use Permit ................................................................................................................. 29
Turf Maintenance Fee ................................................................................................................... 29
Tree Related Fees .......................................................................................................................... 30
Equipment Hourly Rates ............................................................................................................... 30
Street Division Fees ....................................................................................................................... 31
Police Fees .......................................................................................................................... 32
Parking Permit Fees ...................................................................................................................... 33
Cover Photo Credits: Ken Benjamin and Liv Ames
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule
TOWN OF LOS GATOS FEE SCHEDULE
The following Fee Schedule is effective July 1, 2019 through June 30, 2020, unless updated by
the Town Council. The Fee Schedule will be adjusted annually by the average Consumer Price
Index (Bureau of Labor Statistics, U.S. Department of Labor for the San Francisco/Oakland/San
Jose Metropolitan Statistical Area) for the calendar year and/or by the percentage increase in
actual operating costs for the current year – whichever is greater. This Fee Schedule also
provides for minimum annual adjustments for those fees that are directly related to personnel
costs. Other adjustments may be made to maintain consistency with the surrounding
municipalities within the Town of Los Gatos region but in no case are fees charged in excess of
service delivery costs.
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 1
ADMINISTRATIVE SERVICES
Town Facilities Use
Town approved non-profit fundraising activities are allowed in/on Town facilities with an
appropriate permit, or license issued by the Town, or provided in an agreement or Conditional
Use Permit with the Town. Private events are not allowed in the Council Chambers with the
exception of approved events hosted by the tenants of 106 and 108 East Main Street as stated
in tenant lease agreements. The available Town facilities are listed below:
• Civic Center Lawn, Deck and Stairs
• Civic Center West Patio
• Council Chambers
• Council Chambers Lobby (as a stand-alone facility)
• Civic Facilities Conference and Meeting Rooms
Copy and Printing Charges
Special Events
1 Fee for Town Hall Facilities Use Non Profit: $0.00 per hour
2 Building Attendant $20.00 per hour
3 Copy of Town Code Actual Cost
4 8 1/2 x 11 and 8 1/2 x 14 $.25 per page
5 11 x 17 $.35 per page
6 Oversized or Large Productions Actual Cost
7 Annual Subscription for Town Code Supplements Actual Cost
8 Copying of Zoning Ordinance Actual Cost
9 Annual Subscription for Zoning Ordinance
Supplements Actual Cost
10 Certification of Town Records $2.00
11 Annual Financial Report Actual Cost
12 Annual Budget Actual Cost
13 Capital Improvement Plan Actual Cost
14 Special Event Application Fee, For-Profit New Event $910.00
Repeat Event $680.00
15 Special Event Application Fee, Not-For Profit New Event $227.00
Repeat Event $170.00
16 Special Event Road Closure Review Fee $225.00
17 Block Party Permit $55.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 2
ADMINISTRATIVE SERVICES
Business License
Other Services
18 Business License Processing Fee - New Out of Town $20.00
In Town $40.00
19 Business License Processing Fee - Renewal Out of Town and In Town $30.00
20 Compact Disk or Tape of Council and Planning
Commission Meetings (plus actual mailing costs, if
applicable)
$20.00 per DVD for meetings under 2
hours
$30.00 per DVD for meetings over 3
hours
21 Copy - Digital $10 per device
22 Initial Returned Check Fee $25.00
23 Subsequent Return Check Fees [CA Civil Code Section
1719(a) (1)]$35.00
24 Election Filing Fee $25.00
25 Credit Card Processing Fee for all transactions above
$30.00 2.40%
26
Request for Service Not Covered by any Other Fee
Fully allocated hourly rates for all
personnel
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 3
ATTORNEY SERVICES
1 Conditions, Covenants & Restrictions (CC&R) Review
and Approval
Fully allocated hourly rates for all
personnel
2 Simple Covenant/Deed Restriction Fully allocated hourly rates for all
personnel
3 Subdivision Improvement Agreements Fully allocated hourly rates for all
personnel
4 Encroachment Agreements Fully allocated hourly rates for all
personnel
5 Miscellaneous (Legal Agreements, Real Property, etc.)Fully allocated hourly rates for all
personnel
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 4
DEVELOPMENT SERVICES
General Development Fees
Reports, Agendas, and Minutes
1 Reproduction (sent out) plus actual mailing costs, as
applicable. Maps, plans, etc. (larger than 11" x 17")
Actual Cost - sent to San Jose
Blueprint
2 Data Duplication service and fee for partial or full
copies of each digital standard Town data file on one-
time request basis. 8 1/2" x 11" copy, standard
i
$.25 per page
3 Document Storage Fee - Laserfiche Actual Cost
4 Duplicate Plans Set $154.00/hr. (1/2 hr. minimum)
5 Research Records Charge for Staff Research beyond
30 minutes
Fully allocated hourly rate for all
personnel
6 Address Processing Fee - per address $160.00
7 Computer Surcharge on all
Building/Plumbing/Mechanical/Electrical/Grading/En
croachment/Planning Permits/Applications and any
other Permits/ Applications except Park
Permit/Applications
4% of development application fee
8 Engineering Development Review Service Fee -
Building Permit and Building Plan Check*
5% of permit or plan check
9 Request for Service Not Covered by Any Other Fee Actual Cost
10 Pre-application Conference Fee Courtesy meeting
11 Applications for Work Unlawfully Completed Double current application fee
12 BMP Document Processing Fee $575.00
13 Community Benefit No standard schedule, as offered and
applied per project
*These fees are applied to permits or plan checks that require engineering services.
14 Development Review Committee Agendas $37.00
15 Planning Commission Agendas $25.00
16 Planning Commission Minutes Actual Cost
17 Plan Copies - microfiche or other reprints sent to an
outside firm
$31.00 plus costs
18 Plan Copies - blueprint reproduction in house $3.00 per page
19 Copy of Subdivision Ordinance $26.00
20 General Plan (including maps)$26.00
21 Hillside Specific Plan $5.80
22 Hillside Development Standards and Design
Guidelines
$19.45
23 Commercial Design Guidelines $20.50
24 Subdivision Ordinance $26.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 5
DEVELOPMENT SERVICES
Reports, Agendas, and Minutes (continued)
Landscape
Final occupancy clearance (new construction or remodel)
Basis:
Development Review Committee Meetings – 1.5 hrs. (estimate)
Site Visits – 4.0 hrs. (estimate)
Review Plan – 4.0 hrs. (estimate)
*Note: Time spent over and above the initial application fee will be billed at the current
employee billing rate plus equipment hourly rate.
Annexation Fees
Any remaining deposit will be refunded to the applicant and amounts exceeding the deposit
amount will be paid by applicant.
25 General Plan/Zoning Maps (24" x 36") - Black & White $9.00
26 General Plan/Zoning Maps (24" x 36") - Color $42.00
27 Blossom Hill Open Space Study $14.00
28 Commercial Specific Plan Report $12.00
29 Residential Design Guidelines $21.50
30 Housing Element Technical Appendix $24.75
31 2015-2023 Housing Element $39.00
32 Los Gatos Boulevard Plan $9.50
33 North Forty Specific Plan (adopted June 2015)$45.25
34 Park Staff Time Spent for Major Development
Applications
$543.00*
35 1 Lot $3,010.00*
36 2 Lots $1,505.00*
37 3 Lots $1,005.00*
38 4 Lots $755.00*
39 5 Lot or more $600.00*
*Annexation Advertising Deposit (varies as to size of map) - $1,000.00 to $2,200.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 6
DEVELOPMENT SERVICES
Seismic Hazards Mapping Program Fee (SMIP)
For residential construction of three stories and less (Category 1), the permit fee is $13.00 per
$100,000. For all other construction (Category 2), the permit fee is $28.00 per $100,000. This
fee is required by the State of California to identify and map zones of particular seismic hazards.
Five percent of the fee is retained by the Town to be used solely for earthquake preparedness.
Capital Improvement Tax (Construction)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area
of an existing building.
Underground Utility Tax (Utilities)
Based on $0.18 for each square foot of building addition or alteration, which increases floor area
of existing building.
Park Fund Tax (Parks)
Based on $0.04 for each square foot of building addition or alteration, which increases floor
area of an existing building.
Building Division
Building Permit Fees
Building Permit Fees for New Construction and Addition
The fee for each building permit shall be based upon the 1997 Uniform Building Code as
amended by the 2010 California Building Code.
A building valuation regional modifier of 2.32 shall be used in conjunction with the Building
Valuation Data provided in the publication, Building Valuation Data, published by the
International Code Council – February 2012. Hillside Homes shall use a modifier of 3.246 and
Commercial Office Tenant Improvements shall use a modifier of 1.16. The Building Valuation
Data will be increased by the February Engineering News Record (ENR) Annual Building Cost
Index (BCI) for every year thereafter.
40 Fee for issuing/reinstating a Building Permit $55.00
41 Additional Building Permit Fee $30.00
42 Demolition Permit Residential: $265.00
Commercial: $465.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 7
DEVELOPMENT SERVICES
Building Permit Fees for New Construction and Addition
Building Permit Fees for Remodels, Alterations, and Repairs
The Building Official shall establish the valuation of said improvements, and fees will be
assessed as per Valuation Schedule above.
Total Valuation Fee
43 $1.00 to $500.00 $32.99
44 $501.00 to $2,000.00 $32.99 for the first $500.00 plus $4.28
for each additional $100.00 or
fraction thereof, to and including
$2,000.00
45 $2,001.00 to $25,000.00 $97.23 for the first $2,000.00 plus
$19.66 for each additional $1,000.00
or fraction thereof, to and including
$25,000.00
46 $25,001.00 to $50,000.00 $549.32 for the first $25,000.00 plus
$14.18 for each additional $1,000.00
or fraction thereof, to and including
$50,000.00
47 $50,001.00 to $100,000.00 $903.83 for the first $50,000.00 plus
$9.83 for each additional $1,000.00
or fraction thereof, to and including
$100,000.00
48 $100,001.00 to $500,000.00 $1,395.23 for the first $100,000.00
plus $7.86 for each additional
$1,000.00 or fraction thereof, to and
including $500,000.00
49 $500,001.00 to $1,000,000.00 $4,540.19 for the first $500,000.00
plus $6.67 for each additional
$1,000.00 or fraction thereof, to and
including $1,000,000.00
50 $1,000,001.00 and over $7,874.69 for the first $1,000,000.00
plus $4.42 for each additional
$1,000.00 or fraction thereof
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 8
DEVELOPMENT SERVICES
Special Services & Inspections
Special Services & Inspections (continued)
Plan Review Fee
A plan review fee shall be charged at the time of filing application. This fee is separate from
and shall be in addition to the building permit fee. This fee is calculated at sixty-five percent
(65%) of the building permit fee as per the valuation schedule starting on page 6.
Other Miscellaneous Factors to Determine Construction Valuation
51 Inspection outside normal business hours (4 hr.
minimum)
$192.00/hr.
52 Re-inspection fees $160.00/hr.
53 Inspections for which no fee is specifically indicated
(2 hr. minimum)
$160.00/hr.
54 Additional plan review required by changes,
additions or revisions to plans (1 hr. minimum)
$152.50/hr.
55 For use of outside consultants for plan checking
and/or inspections Actual Cost
56 Services for which no fee is specifically indicated (1/2
hr. minimum)
$160.00/hr.
57 Permit/Plan check time extension (per permit)
(applies to permits that have not expired)
$78.00
58 Express plan review or initial review (1 hr. minimum)$160.00/hr.
59 Application for the Appeals Building Board Review $273.00
60 Temporary Certificate of Occupancy $1,095.00
61 Convert Garage to habitable space $117.00/sq. ft.
62 Convert unfinished basement or attic to habitable $127.00/sq. ft.
63 Pools/Spas (gunite)$76.00/sq. ft.
64 Siding - aluminum/vinyl/wood $32.00/sq. ft.
65 Antennas & Towers Const.Value As Applied under
valuation schedule on page 6
66 Commercial Awning or Canopy Aluminum $32.00/sq. ft.
Canvas $24.00/sq. ft.
67 Fence or Freestanding Wall (over 6" high)Wood or metal $49.00/lf.
Masonry $85.00/lf.
68 Decks/Balcony $47.00/sq. ft.
69 Wood Deck $20.00/sq. ft
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 9
DEVELOPMENT SERVICES
Other Miscellaneous Factors to Determine Construction Valuation (continued)
Special Systems Fees
Electrical Permit Fees
Plan Review & Re-inspection Fees
System Fee Schedule
For alterations to existing pools, use Unit Fee Schedule fees listed on page 10.
70 Re-roofs $3.00/sq. ft.
71 Retaining Walls $107.00/lf.
72 Emergency generation, wind power, special HVAC
systems, etc.
Plan Review (1 hr. minimum)
$152.50/hr.
Field Inspection (2 hr. minimum)
$160.00/hr.
73 Photovoltaic - Roof & Ground Mounted - Residential Plan Review (1/4 hr. minimum)
$152.50/hr.
Field Inspection (1 hr. minimum)
$160.00/hr.
74 Photovoltaic - Roof & Ground Mounted - Commercial Plan Review (1 hr. minimum)
$152.50/hr.
Field Inspection (2 hr. minimum)
$160.00/hr.
75 Fee for issuing/reinstating an Electrical Permit $55.00
76 Additional Electrical Permit Fee $25.00
77 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
78 Commercial Construction $.08 sq. ft
79 Plan review fee 25% of Electrical Permit Fee
80 Additional plan review $152.50/hr.
81 Re-inspection fee $160.00/hr.
82 Private swimming pools $63.00
83 Public swimming pools $114.00
84 Temporary power poles $78.00
85 Temporary distribution system & temporary lighting $38.00
86 Installation of illuminated signs (each)$101.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 10
DEVELOPMENT SERVICES
Unit Fee Schedule
Other Electrical Fees
87 Receptacle, switch and lights $2.00
88 Residential appliances/new circuits (cook top, oven,
range, disposals, clothes dryers, or other motor
operated appliances not exceeding one horsepower)
$6.00
89 Nonresidential appliances/new circuits (medical &
dental devices, food, beverage, drinking fountains,
laundry machines, or other similar equipment) NOTE:
for other types of air conditioners and other motor-
driven appliances having larger electrical ratings, see
Generators/Motors
$8.00
90 Photovoltaic system (residential)$90.00
91 Solar systems (including controls)$90.00
92 Power apparatus (generators, transformers, A/C, heat
pumps, baking equipment)
Up to 10 KV, each $16.00
Over 10 KV not over 50 KV, each
$32.00
Over 50 KV and not over 100 KV, each
$63.00
Over 100 KV, each $84.00
93 Motors Up to 10 hp $16.00
Up to 25 hp $32.00
Up to 55 hp $63.00
Over 55 hp $92.00
94 Transformers Up to 5 KVA $16.00
Up to 10 KVA $32.00
Up to 50 KVA $53.00
Over 50 KVA $77.00
95 Busways/conduits (per 100 ft)$8.00
96 Service equipment 200 amps or less $78.00
201 to 999 amps $108.00
Sub-panels $38.00
97 Installation of spas or saunas $38.00
98 Duplicate job card $25.00
99 Permit extension (applies to permits that have not
expired)
$78.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 11
DEVELOPMENT SERVICES
Mechanical Permit Fees
Plan Review & Re-inspection Fees
Unit Fee Schedule
Other Mechanical Fees
Plumbing Permit Fees
100 Fee for issuing/reinstating a Mechanical Permit $55.00
101 Additional Mechanical Permit Fee $25.00
102 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
103 Commercial Construction $.08 sq. ft
104 Plan review fee 25% of Mechanical Permit Fee
105 Additional plan review $152.50/hr.
106 Re-inspection fee $160.00/hr.
107 Installation, of each heating system, A/C, boiler,
compressor or air handler
$38.00
108 Each duct repair or alteration $11.00
109 Each fireplace appliance $32.00
110 Each ventilating fan $11.00
111 Installation of separate flue or vents not included
with the installation of an appliance
$11.00
112 Installation of each hood with mechanical exhaust Residential $32.00
Commercial $114.00
113 Each new or repair of gas piping system $70.00
114 Each additional gas outlet $23.00
115 Installation of evaporative cooler $32.00
116 Duplicate job card $25.00
117 Permit extension (applies to permits that have not
expired)
$78.00
118 Fee for issuing/reinstating a Plumbing Permit $55.00
119 Additional Plumbing Permit Fee $25.00
120 New Residential Construction (new buildings only,
including garages)
$.11 sq. ft
121 Commercial Construction $.08 sq. ft
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 12
DEVELOPMENT SERVICES
Plan Review & Re-inspection Fees
System Fee Schedule
Unit Fee Schedule
Other Plumbing Fees
122 Plan review fee 25% of Plumbing Permit Fee
123 Additional plan review $152.50/hr.
124 Re-inspection fee $160.00/hr.
125 Private swimming pools (including heater, water
piping, gas piping)
$92.00
126 Public swimming pools (including heater, water
piping, gas piping)
$138.00
127 Lawn sprinkler system on one meter $38.00
128 Each new or repair of gas piping system $70.00
129 Each drainage, sewer system $38.00
130 Radiant floor heating system $114.00
131 Each plumbing fixture or trap or set of fixtures on
one trap
$11.00
132 Each sewer cleanout, backflow device $11.00
133 Each septic system abatement $114.00
134 Rainwater systems - per drain (inside building)$11.00
135 Each water heater, water softener $32.00
136 Each grease interceptor (750 gallon capacity)$78.00
137 Each grease trap (1-4 fixtures)$44.00
138 Residential water re-piping $114.00
139 Each ejector/sump pump $38.00
140 Each vacuum breaker/hose bib $11.00
141 Each water piping system repair or replacement $24.00
142 Each additional gas outlet $24.00
143 Duplicate job card $25.00
144 Permit extension (applies to permits that have not
expired)
$78.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 13
DEVELOPMENT SERVICES
Other Building Fees
State of California Title 24 Part 2 Energy and Accessibility Code and Regulation Plan Review and
Inspection Fees
A surcharge shall be added to the building permit fee for the cost to plan review and inspect for
compliance with State of California Title 24 Regulations. This fee is calculated at fifteen percent
(15%) of the building permit fee. This fee is applied whenever a plan review is assessed.
State of California Mandated Building Standards Fee – SB 1473
A surcharge shall be added to all building permits at the rate of four dollars ($4) per one
hundred thousand dollars ($100,000) in valuation, with appropriate fractions thereof, but not
less than one dollar ($1). These funds will be available to the California Building Standards
Commission, the Department of Housing and Community Development, and the Office of the
State Fire Marshall for expenditure in carrying out the provisions of the State Building
Standards Law and provisions of State Housing Law that relate to building standards. Up to ten
percent (10%) shall be retained for related administrative costs and for code enforcement
education.
Planning Division
The fees listed below constitute all fees imposed by the Planning Division. Certain types of
applications must be reviewed / processed by other departments/agencies, which may impose
separate fees. Applicants are advised that the fees for those services are not included in the
Planning Department's fees. Where the term "actual cost" is used here, it shall mean:
materials, supplies (including any costs of noticing or publication), outside consultants,
employee cost will be billed at the top step, plus benefits, plus overhead. The following fee
schedule is established for applications filed pursuant to the Town Code. The fees are collected
by the Community Development Department at the time the application is filed unless
otherwise noted.
•Fees for Additional Processing - In the event additional processing services by the Town
are required due to changes, modifications, additions, errors, omissions, or
discrepancies caused by the applicant or his/her agents or representatives, the applicant
shall pay an additional fee as determined by the Director of Community Development to
cover the actual cost.
145 Duplicate Inspection Card $30.00
146 NPDES Inspection Fee (Charged on all building
permits with the potential to generate non-point
source storm water runoff during construction)
$70.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 14
DEVELOPMENT SERVICES
•Fees for Lack of Progress - If additional information is required by the Town for an
application and the requested information is not submitted within 180 days, the
applicant will be required to pay a fee of 10 percent of the current application fee at the
time the requested information is submitted. Any re-submittal after one year will be
processed as a new application, subject to new fees.
•Fees for Major Projects - If it is anticipated that the application processing costs of
selected major projects will significantly exceed the following fees, the Director of
Community Development may collect a deposit and charge actual time spent to process
the applications based upon current hourly rates.
•Surcharges - All of the following applications are subject to the surcharge fees as set
forth in General Development Services and in the Zoning Research section of Planning
Division.
Zoning Approvals - Architecture and Site Applications – Development Review Committee (DRC)
Approval
147 New single family detached (HR and RC zones)$8,978.00
Engineering Development Review Service Fee $4,151.00
148 New non-custom single family detached (HR and RC
zones) per unit/model, as part of a Planned
Development**
$6,235.00
Engineering Development Review Service Fee $4,148.00
149 New single family or two family units $6,187.00
Engineering Development Review Service Fee $4,149.00
150 New single family or two family (any other zone) per
unit/model new nonresidential or multiple family per
building as part of a Planned Development**
$4,421.00
Engineering Development Review Service Fee $4,153.00
151 Minor projects (a development proposal that does
not significantly change the size, mass, appearance or
neighborhood impact of a structure, property or
parking lot
$2,243.00
Engineering Development Review Service Fee $3,186.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 15
DEVELOPMENT SERVICES
Zoning Approvals – Architecture and Site Applications – Planning Commission Approval
152 Supplemental fee DRC applications as determined
with fee #146 or minor residential development
applications or applications that are part of a
Planned Development that require Planning
Commission approval
$3,168.00
Engineering Development Review Service Fee $1,157.00
153 New two family unit $9,437.00
Engineering Development Review Service Fee $4,151.00
154 New nonresidential (includes conceptual Planned
Development elevations)
$10,832.00
Engineering Development Review Service Fee $4,151.00
155 New multiple family (includes conceptual Planned
Development elevations)
$9,847.00
Engineering Development Review Service Fee $4,149.00
156 All other (i.e. exceed FAR, major grading, etc.)$5,491.00
Engineering Development Review Service Fee $4,151.00
**Any changes proposed to model homes, nonresidential, or multiple family buildings, a
supplemental fee shall be based on a time and materials basis to review the changes.
*Aside from the fees noted above, no additional Architecture and Site application fees will be
assessed for projects that involve a historic structure or site.
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 16
DEVELOPMENT SERVICES
Conditional Use Permits
Rezoning (other than Planned Development)
157 Conditional Use Permit $6,351.00
Engineering Development Review Service Fee $1,351.00
158 Conditional Use Permit (when consolidated with
another application for new development)
$1,056.00
Engineering Development Review Service Fee $774.00
159 Conditional Use Permit for Minor Restaurant (DRC
Approval)
$3,865.00
Engineering Development Review Service Fee $1,160.00
160 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 1
$6,351.00
Engineering Development Review Service Fee $1,736.00
161 Conditional Use Permit for Major Restaurant (PC
Approval) Tier 2 includes alcohol and/or
entertainment (must pay #159 below with this
application)
$7,506.00
Engineering Development Review Service Fee $1,735.00
162 Applications that require Town Council Approval
(these fees supplement the above established fees)
$3,012.00
Engineering Development Review Service Fee $1,158.00
Transcription of Planning
Commission minutes - Actual cost
and minimum $500.00 deposit
163 Without General Plan or Specific Plan Amendment Actual Cost ($5,000.00 minimum)
164 With General Plan or Specific Plan Amendment Actual Cost ($7,000.00 minimum)
165 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00
deposit
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 17
DEVELOPMENT SERVICES
Planned Development
Planning Division Certificates of Use and Occupancy
Sign Application
Administrative Land Use Permit
166 Without General Plan or Specific Plan Amendment Actual Cost
167 Without General Plan or Specific Plan Amendment
(HR or RC Underlying Zone)
Actual Cost
168 With General Plan or Specific Plan Amendment Actual Cost
169 With General Plan or Specific Plan Amendment (HR or
RC Underlying Zone)
Actual Cost
170 Town Council Modification to a Planned
Development
Actual Cost ($5,000.00 minimum)
171 DRC Modification to a Planned Development Actual Cost ($3,000.00 minimum)
172
173 Transcription fee of Planning Commission minutes Actual Cost and minimum $500.00
deposit
Publication costs for the planned development ordinance shall be paid by the applicant
174 Change of use $230.00
175 Change of occupancy (excluding change of proprietor
of a continuing business enterprise)
$155.00
176 Use/occupancy clearance if Conditional Use Permit is
required or occupancy of a new accessory dwelling
unit
No fee
177 New permanent sign $310.00
178 Temporary nonresidential sign $99.00
179 Change of face only $155.00
180 Sign program $2,075.00
181 Minor telecommunications facility (i.e. microcell,
8,021 lb. or equivalent)
$1,535.00
182 Major telecommunications facility which do not
require a Conditional Use Permit
$3,681.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 18
DEVELOPMENT SERVICES
Other Zoning Approvals Fees
Subdivisions
183 Variance $4,671.00
Engineering Development Review Service Fee $1,351.00
184 Minor Residential Development (see #151)$2,243.00
185 Agricultural Preserve Withdrawal $3,810.00
186 Hazardous Materials Storage Facility Application Fully allocated rate of all personnel,
plus noticing fees
187 Home Occupation Permit $155.00
188 Accessory Dwelling Unit $1,340.00
189 Mobile Home Park Conversion Permit Fully allocated rate of all personnel
with initial deposit of $5,000.00
190 General Plan/Town Code Amendments Fully allocated rate of all personnel
with initial deposit of $5,000.00 plus
additional fees
191 Lot Line Adjustment (DRC Approval)$2,128.00
Engineering Development Review Service Fee $3,571.00
192 4 Lots or Less (DRC Approval)$8,575.00
Engineering Development Review Service Fee $3,960.00
193 4 Lots or Less (as part of a Planned Development)
(DRC Approval)
$3,541.00
Engineering Development Review Service Fee $4,153.00
194 5 Lots or More $9,660.00
Engineering Development Review Service Fee $5,115.00
195 5 Lots or More (as part of a Planned Development)
(DRC Approval)
$4,152.00
Engineering Development Review Service Fee $5,118.00
196 Vesting Tentative Map (VTM)Actual Cost plus $500.00 deposit and
additional fees
197 Lot Merger and Reversion to Acreage (DRC Approval)$1,055.00
Engineering Development Review Service Fee $3,570.00
198 Condominium $7,445.00
199 Condominium (as part of a Planned Development)$3,541.00
200 Certificate of Compliance (DRC Approval)$3,076.00
Engineering Development Review Service Fee $2,219.00
201 VTM applications that require Town Council
approval, Subdivision and/or DRC applications that
require Planning Commission approval. This fee
supplements the above-established fees.
$2,824.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 19
DEVELOPMENT SERVICES
Miscellaneous Application Fees
Environmental Assessment Fees
202 Time Extensions to Approved Application 50% of current fee (excluding fees
based on actual cost)
203 Modification to Approved Application 75% of current fee (excluding fees
based on actual cost)
204 Conceptual Development Advisory Committee
Review
$2,966.00
Special Noticing - Actual Cost
(minimum $500.00 deposit)
205 Push Cart Permit $492.00
206 Auto Dealer Events Smaller Promotional Events $82.00
Large Promotional Events $401.00
207 News rack Permit Fee $390.00
208 Firearms Dealer Permit (Town Ordinance 2217 dated
6/17/2013)
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
209 Categorical Exemption No fee
210 Initial Study Deposit***Fully allocated hourly rate of all
personnel with initial $5,000.00
deposit
211 Draft Initial Study Review Fee (or actual cost if part of
a Planned Development, General Plan and/or Town
Code Amendment
$2,786.00
Engineering Development Review Service Fee $1,931.00
212 Environmental Impact Report Consultant's fee
213 Draft EIR Review Fee Fully allocated hourly rate of all
personnel plus any necessary outside
costs
214 Impact Monitoring Program (AB3180)Fully allocated hourly rate of all
personnel plus any necessary outside
costs
***The $5,000 fee is a deposit only. The specific cost of the Initial Study and any required special
studies shall be borne by the applicant. The deposit shall be increased before the Town will
authorize work exceeding the amount on deposit. Any deposit balance will be refunded.
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 20
DEVELOPMENT SERVICES
Surcharges
Appeals
Zoning Research
215 General Plan update surcharge .5% of building valuation for new
construction and additions/10% of
zone change and subdivision fee
216 Advanced Planning projects 10% of application fee
217 Fee to appeal Planning Commission decision to Town
Council
Per Residential $438.00
Per Commercial, multi-family or
tentative map $1,763.00
218 Fee to remand applications from Town Council to
Planning Commission
Fully allocated hourly rate for all
personnel plus additional fees
219 Fee to appeal Director of Community Development or
Development Review Committee decision to Planning
Commission
Per Residential $221.00
Per Commercial $882.00
220 Tree appeals $90.00
221 Appeal transcription fee of Planning Commission
minutes (only applies to appeals from Planning
Commission to Town Council)
Actual Cost - minimum $500.00
deposit
222 Basic Zoning Letter $155.00
223 Legal non-conforming verification $650.00
224 Reconstruction of legal non-conforming structures
(Burndown Letter)
$276.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 21
DEVELOPMENT SERVICES
Other Planning Division Fees
Payment of Application Fees
All application fees are to be paid at the time the applications are submitted to the Community
Development Department. If the applicant withdraws an application, which requires a hearing
by the Planning Commission, prior to processing the application for the hearing, 40% of the
paid application fee shall be refunded to the applicant at the discretion of the Director of
Community Development. All other fees are non-refundable.
225 Fence Height Exceptions $276.00
226 Peer/Technical Review - any remaining deposit will be
refunded to the applicant and amounts exceeding
the deposit amount will be paid by applicant
Fully allocated hourly rate of all
personnel plus any necessary outside
costs and initial $2,000.00 deposit
227 Fees For Additional Tech Review and/or DRC Review -
DRC beyond three meetings, Planning Commission
hearing beyond two meetings, Town Council hearing
beyond one meeting
Fully allocated hourly rate of all
personnel involved plus additional
fees
228 Consultation Actual cost on an hourly basis
229 Research Services Minimum Charge Fully allocated hourly rate for all
personnel with initial $200.00
deposit
230 Building Permit Plan Check Fee 20% of building fee
231 Below Market Price Housing Program In-Lieu Fee 6% of the building permit valuation
for the entire project
232 Outdoor Seating Permit Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
233 Valet Parking Permit Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
234 Parklet Program Fully allocated hourly rate for all
personnel with initial $1,000.00
deposit
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 22
DEVELOPMENT SERVICES
Engineering Division
The following fees constitute a comprehensive listing of the various fees charged by the
Engineering Program. Certain types of application/permits must be reviewed and/or processed
by other Town departments or public agencies, which may charge separate fees. Applicants are
advised that the fees for those services are not included in the Engineering Program's fees.
Where the term "actual cost (s)" is used here it shall mean: materials, supplies (including any
costs of noticing or publication), outside consultants and employee cost, (including salary,
benefits and overhead).
Engineering Plan Check Fee (Public Improvements & Grading Permits) *
Inspection Fee (Public Improvements & Grading Permits)
Work In or Use of Public Right-of-Way *
235 Application Fee $490.00
236 Under $20,000.00 15.5% of valuation
237 $20,000.00 to $80,000.00 $3,100.00 plus 9% of valuation
238 Greater than $80,000 $8,500.00 plus 8.5% valuation
239 Each additional plan check beyond three reviews Fully allocated hourly rate for all
personnel
240 Under $20,000.00 7.5% of valuation
241 $20,000.00 to $80,000.00 $1,500 plus 6.5% of valuation
242 Greater than $80,000.00 $5,400 plus 4.0% of valuation
243 Encroachment Permit - Residential Work up to $4,000.00 - $305.00
Each additional $2,000.00 - $160.00
244 Encroachment Permit - Collector/Arterial Streets**Work up to $4,000.00 - $1,580.00
Each additional $2,000.00 - $345.00
245 Outside contractor underground utility locating
surcharge (actual cost for outside contractor
inspection fee may change)
$95.00
246 Temporary Encroachment Permit $150.00
247 Dumpster Permit $150.00
248 Storage Permit $150.00***
*Work done at night or on weekends shall be charged the actual costs of staff
** Single-family residences located along collector and arterial streets to be charged the
residential fees above
*** $500.00 refundable Storage Unit Removal Deposit, to cover cost of removal, if abandoned
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 23
DEVELOPMENT SERVICES
NPDES
Engineering Subdivision Map Checking
Traffic Impact Analysis or Parking Study
249 Inspection Fee - Grading Permits Single Family Residential $730.00
Commercial or Multi Family
Residential $1,135.00
250 Inspection Fee - Encroachment Permits and Some
Storage Permits
Single Family Residential $200.00
Commercial or Multi Family
Residential $325.00
Plus $485.00 per LID facility
251 Inspection of Storm Water Treatment Measures $500.00 per facility
252 Annual Stormwater/Limited Impact Development
(LID) Permit
Per Visit and 1st facility inspection
$485.00
Every additional facility inspection
$160.00
253 C-3 Permit Hydrologic Calculation Fully allocated hourly rate for all
personnel plus any outside cost and
initial deposit of $3,750.00
254 1-4 lots $2,855.00*
255 5 or more lots $3,995.00*
*Plus, initial $3,000 surveyor deposit. Additional deposit(s) of actual surveyor costs may be
required for larger projects than 5 or more lots, additional map check review(s), or overall
complexity of the map.
256 Development Review (staff traffic impact analysis or
Parking Study)
Actual Cost
Consultant Report - Consultant Fee
257 Staff Review Fee $664.00 plus 10% of the traffic
consultant report cost
258 Site Distance Analysis $178.00 per review not to exceed two
hours. Actual cost for staff time when
analysis exceeds two hours.
259 Traffic Impact Mitigation Fee $958.00 per new average daily trip
generated
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 24
DEVELOPMENT SERVICES
Storm Drainage Fees
Street Improvement In-Lieu Fee
Other In-Lieu Fee
Hauling Permits
Construction Activities Mitigation Fee (Ordinance 2189)
260 Development Projects Single family lots Section 24.60.035(b)
(3): For subdivision whose lots
exceed one acre, the fee shall not
exceed that of one acre per lot
$4,228.00/ac.
Multiple family dwelling units - initial
unit $4,228.00/ac.
Multiple family dwelling units - each
unit after initial (not to exceed
$4,622.00/ac.) $159.00
Commercial, industrial, hospitals,
churches, schools, and others
$5,286.00/ac.
261 Building/Grading Permits (Building, Structures, &
impervious areas)
New impervious surface area, per sq.
ft. $1.00/sq. ft.
262 Sidewalks $16.00/sq. ft.
263 Curb and Gutter $68.00/lf.
264 Trail Improvements $16.00/per sq. ft. or determined by
Director
265 House Moving Fee $3,490.00*
266 Hauling (Overweight Vehicle) Permit Daily $16.00**
Annual $90.00
**The current State mandated fee is $16.00 for Hauling Permit. If the State fee changes, the
Hauling Permit fee will change to reflect the same.
*Plus initial deposit of $5,000 for facilities damage
267 New Buildings and Additions Residential (per square foot added)
$1.17/sq.ft.*
Non-residential (per square foot
added) $1.17/sq.ft.*
*These two fees are adjusted based on the Building Cost Index
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 25
DEVELOPMENT SERVICES
Other Engineering Fees
268 Engineering Reversion to Acreage $2,395.00 plus initial deposit of
$2,500 for surveyor
269 Engineering Lot Merger $3,480.00 plus surveyor deposit
270 Engineering Lot Line Adjustments $3,480.00 plus surveyor deposit
271 Certificate of Compliance $3,480.00 plus surveyor deposit
272 Abandon Excess Public Right-of-Way & Public
Easement
$4,345.00 plus surveyor and
valuation consultant and planning
services
273 Geotechnical Peer Review Fees Fully allocated hourly rate of all
personnel plus any outside costs and
initial $2,500 deposit. Larger projects
require an initial deposit of $4,500 to
allow for a site visit by the
geotechnical peer review consultant.
274 Separate Instrument Dedication Fee (for dedication
via grant deeds and not maps)
$720.00 plus initial deposit of $2,500
for surveyor
275 Slurry Seal Fee $2.50 per sq.ft.
276 Flood Review Fee Consultant Cost plus 25% Admin Fee
277 Miscellaneous Review Fee*Actual Cost
*This fee will be implemented for services including, but not limited to, wet weather inspections,
annual inspections, review of operations and maintenance reports, coordination with property
owner(s) and/or homeowner associations, etc.
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 26
LIBRARY SERVICES
Lost or Damaged Items
In lieu of above, account holder may replace lost/damage item with new identical copy plus
$2.00 processing fee.
Internet printing and copies
History Project Digital Image
Overdue Fees
Senior citizens may request an exemption from overdue fees.
1 Replacement of Adult book/AV item Cost of item plus $10.00 processing
fee
2 Replacement of Teen/Children’s book/AV item Cost of item plus $5.00 processing
fee
3 Replacement of Adult paperback Cost of item plus $5.00 processing
fee
4 Replacement of magazine Cost of item plus $5.00 processing
fee
5 Printing per page - Black and White Copies $0.15
6 Printing per page - Color Copies $0.25
7 Fair Use Fees (for personal use only)Free – Downloaded via History
Website
8 Commercial Use Fees $25.00 per high resolution image
9 Adult Library materials $.30/day $10.00 max/per item
10 Children’s/Teen materials $5.00 per item after six weeks
overdue
11 Periodicals $.30/day $5.00 max/per item
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 27
PARKS AND PUBLIC WORKS SERVICES
Parks Division
Oak Meadow Park
Picnic Areas (1 through 9)
Bandstand/Gazebo
Minimum two-hour reservation required.
Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only.
1 Facility Fee Resident $95.00 per site
Non-Resident $150.00 per site
2 Facility fee w/Jump House Permit Resident $190.00 per site
Non-Resident $300.00 per site
3 Non-Profit Event Resident $65.00 per hour
Non-Resident $120.00 per hour
4 Public Event Resident $95.00 per hour
Non-Resident $150.00 per hour
5 Deposit (refundable)$500.00
6 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
7 Deposit (refundable)$100.00
8 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
9 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
10 Deposit (refundable)$100.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 28
PARKS AND PUBLIC WORKS SERVICES
Other Oak Meadow Park Fees
Creekside Sports Park
Special Use Permit – Single Use
Special Use Permit – Multi-Use
Multi-Use Permit for recreational/educational purposes only.
Belgatos, Blossom Hill, La Rinconada, and Live Oak Manor (Groups of 25+ and/or Jump House)
Single Use Permit
11 Bocce Ball Court Fee Resident $95.00 per day
Non-Resident $150.00 per day
12 Parking Fee Resident No Charge
Non-Resident $6.00 per vehicle
13 Vehicle Escort Fee Resident $75.00
Non-Resident $100.00
14 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
15 Deposit (refundable)$500.00
16 Non Profit Resident $95.00 per day
Non-Resident $150.00 per day
17 Additional Day Resident $55.00 per additional day
Non-Resident $75.00 per additional
day
18 Deposit (refundable)$500.00
19 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
20 Deposit (refundable)$100.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 29
PARKS AND PUBLIC WORKS SERVICES
Multi-Use Permit
Multi-Use Permit for recreational/educational purposes only.
Town Plaza Use Permit
A permit fee is $55.00 per hour for events that close the Town Plaza entirely to the public. This
fee will be charged for the number of hours the Town Plaza cannot be used safely by the public
due to the event. Additional fees or deposits may be charged for lawn repair, street closures,
and/or additional maintenance, as determined by the Parks and Public Works Director and/or
Maintenance Superintendent.
Civic Center Lawn Use Permit
A permit fee is $55.00 per hour for events that restrict the use of the Civic Center Lawn.
Additional fees or deposits may be charged for lawn repair, street closures, and/or additional
maintenance, as determined by the Parks and Public Works Director and/or Maintenance
Superintendent.
Turf Maintenance Fee
Additional fee added to any Park Use or Special Event Permit, when a permit's scheduled
activity or event will negatively impact the park turf, (locations including but not limited to Oak
Meadow, Town Plaza, and Civic Center lawn areas). The fee amount is to be based upon best
estimate of turf repair cost, as determined by the Director of Parks and Public Works and/or
Maintenance Superintendent.
21 Permit Fee Resident $95.00 per day
Non-Resident $150.00 per day
22 Additional Day Resident $25.00 per additional day
Non-Resident $40.00 per additional
day
23 Deposit (refundable)$100.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 30
PARKS AND PUBLIC WORKS SERVICES
Tree Related Fees
Equipment Hourly Rates as Follows
24 Tree Removal Permit Application One Tree $250.00
Additional Tree $125.00/each
If application is denied 50% refund
25 Illegal Tree Removal Administrative Fee $330.00
26 Replacement Trees - Town Forestry Fund Per Tree
Ordinance Section 29.10.0985
Tree cost for each 24”,36", and/or
48" box size will be the Market Price
plus the installation cost,
determined by the Director
27 Pick-up Truck $32.00
28 1 Ton Flatbed Truck $42.00
29 Utility Truck $57.00
30 Dump Truck (10 Wheel)$85.00
31 Dump Truck (Bobtail)$63.00
32 Paint Truck $85.00
33 Line Remover $26.00
34 Tractor Loader $63.00
35 Backhoe $85.00
36 Rubber-tired Loader $85.00
37 Roller $63.00
38 Van $37.00
39 Concrete Saw $32.00
40 Air Compressor $32.00
41 Arrowboard $32.00
42 Generator $26.00
43 Chainsaw $20.00
44 Blower $10.00
45 Paving Box $63.00
46 Rodder $63.00
47 High Pressure Sewer Cleaner $117.00
48 Brush Chipper $42.00
49 Chipper Truck $63.00
50 Aerial Unit $92.00
51 Street Sweeper $92.00
52 Forklift $42.00
53 Trailer $42.00
54 Message Board $10.81
55 Barricades $0.23
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 31
PARKS AND PUBLIC WORKS SERVICES
Equipment Hourly Rates as Follows (continued)
Streets Division
Hazard and/or Debris Removal
Special Events Fees
Electric Vehicle Charging Fee
56 Cones $0.15
57 Portable Generators $28.04
58 Staff time spent to conduct hazard and or debris
removal caused by citizen negligence
Fully allocated hourly rate of all
personnel plus any outside costs
59 Staff and equipment for special event requests Fully allocated hourly rate of all
personnel
60 System Connection Fee $1.00
61 Hourly Charge - 1- 4 hours $1.00/hour
62 Hourly Charge - after 4 hours $5.00/hour
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 32
POLICE SERVICES
Printing and Copying Charges
Photographs
Concealed Weapons
Tow Trucks
Massage Permit Fees
Fee covers staff time to process application, review pertinent documents, arrange for
fingerprints and photographs to be taken and obtain all necessary approvals.
Special Events
Other Special Police Services – Pursuant to Agreement between Police Chief and Requestor.
1 8 1/2" x 11 and 8 1/2" x 14 $.25 per page
2 Copy - Digital $10.00 per device
3 For the first 3 $42.00
4 Each Additional $13.00
5 Permit Fee, DOJ Fee, and Admin Fee $100.00
6 Renewal Permit $25.00
7 Amended Permit $10.00
8 Tow Permit $95.00
9 Driver Permit $370.00
10 Initial Application for each Therapist $213.00
11 Annual Renewal for each Therapist $107.00
12 Massage Establishment Permit (initial and
subsequent renewals) (Ord 14.110.075)
$415.00
13 ABC Application No charge
14 No Parking Signs $0.46/each
15 Officer Staffing Fully allocated hourly rate of all
personnel
16 Bingo Permit $170.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 33
POLICE SERVICES
Motion Picture/Television/Commerical Still Photo
Emergency Response Caused By
Alarm Fees
Citation issued for failure to display appropriate Permit or placard. Dismissal fee in lieu of full
Bail Amount
Parking Permit Fees
Residential Parking Permit
17 For-Profit Groups (each)$1,609.00
18 Non-For-profit Groups (each)$579.00
19 DUI Emergency Accident Response (Government
Code Section 53155)
Actual costs incurred up to
$12,000.00
20 Second Response due to Disturbances At current billing rate
21 Commercial Alarm Registration Fee $95.00
22 Second False Alarm*$170.00
23 Third False Alarm*$170.00
24 Fourth False Alarm*$170.00
25 Fifth False Alarm*No response, no charge, at the
Chief’s discretion
*Within a six-month period within a calendar year
26 Handicap CVC22507.8/22500(1)$37.00
27 Parking Permits $10.00
28 Annual residential parking permit/per vehicle (Limit
4 per residence)
$42.00
29 Visitor guest passes Two (2) complimentary with the
purchase of the primary permit
30 Special Event Permit -First permit (one day)$10.00
31 Special Event Permit -Each Additional (one day)$2.00
32 Replacement permit for vehicle change (within
calendar year)
$10.00
33 Lost permit replacement $37.00
34 Damaged permit replacement (with return of permit)$18.00
Town of Los Gatos FY 2019-2020 Comprehensive Fee Schedule 34
POLICE SERVICES
Parking Permit Fees (continued)
Business Parking Permit
Construction Parking Permit
Other Police Fees
35 Standard Employee annual $248.00
36 Lost permit replacement $37.00
37 Damaged permit replacement (with return of permit) $18.00
38 One day parking permit per construction vehicle $32.00
39 Each additional day per vehicle $5.00
40 Fingerprinting - per each Livescan application (Plus
additional DOJ or FBI fees which are based on the
level of service for the application) Fingerprint fees
are subject to increase based on DOJ or FBI fees
$80.00
41 Subpoena Duces Tecum Per California Evidence Code Section
1563
42 Solicitor/Peddler's Permit $55.00 plus fingerprinting
43 Bicycle Licenses (each)$3.00
44 Taxicabs Permit $185.00 per business
45 Clearance Letter $25.00
46 Horse Drawn Vehicle Permit $270.00
47 Firearms Storage Fee $245.00 Admin Fee plus $1.00 per
firearm per day for storage
48 Vehicle Release $235.00
49 Vehicle Repossession Release Fee (Government Code
Section 41612)
$15.00
50 Non-Los Gatos Cite Sign Off $27.00
51 Feral Cat Feeder/Trap Permit $42.00