Loading...
05 Staff Report.Annual Street Repair and Resurfacing - Slurry Seal.Rubber Cape Seal PREPARED BY: Michelle Quinney Interim Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director and Director of Parks and Public Works 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 9/1/2020 ITEM NO: 5 DATE: August 27, 2020 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Work of Pavement Coatings Co. and Authorize Recording by the Town Clerk for PPW Job No. 19-811-9901 Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) Project RECOMMENDATION: Authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion for the work of Pavement Coatings Co. and authorize recording by the Town Clerk for PPW Job No. 19-811-9901 Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) Project. BACKGROUND: The Town’s adopted FY 2019/20-2023/24 Capital Improvement Program (CIP) Budget designated funding for this project. At its January 20, 2020 meeting, Town Council approved the plans and specifications for two annual street repair and resurfacing projects, the Slurry Seal/Rubber Cape Project and the Asphalt Overlay Project. The Council also authorized the Town Manager to advertise both projects for bid and to award the projects for a total amount not to exceed the available construction budget of $4,708,000, including contingencies and any change orders, to the lowest responsible bidder. The projects were advertised and on February 13, 2020, three bids were opened for the Slurry Seal/Rubber Cape Seal Project with the following results for the base bid plus the alternate bid items: PAGE 2 OF 3 SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Work of Pavement Coatings Co. and Authorize Recording by the Town Clerk for PPW No. 19-811-9901 Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) Project DATE: August 27, 2020 BACKGROUND (continued): Pavement Coatings Co. $1,880,514.75 Intermountain Slurry Seal $2,184,184.00 VSS International $2,287,313.00 Subsequently, the Town entered into an agreement with Pavement Coatings Co. for the Slurry Seal/Rubber Cape Seal Project in the low bid amount of $1,880,514.75. DISCUSSION: Pavement Coatings Co. has satisfactorily completed all of the work for the project for a final contract amount of $1,855,714.23, and staff recommends acceptance of the project. Five percent of the faithful performance bonds will remain in effect for a period of two years as a guarantee for any needed repair or replacement caused by defective materials and/or workmanship for the project. The execution and recordation of the Certificate of Acceptance is now required to finalize the Town's acceptance of the project. CONCLUSION: Authorize the Town Manager to execute a Certificate of Acceptance and Notice of Completion for the work of Pavement Coatings Co. and authorize recording by the Town Clerk for PPW Job No. 19-811-9901 Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) Project. FISCAL IMPACT: All remaining savings will be carried forward for next year’s Street Repair and Resurfacing project. Staff costs are tracked for all projects. Tracking of staff costs allows for accountability in the costs of the project, recovery of costs for grant funded projects, and identification of future staffing needs. This project utilized full-time budgeted staff. The costs for full-time staff are accounted for in the Department’s operating budget and will not be charged to this project. PAGE 3 OF 3 SUBJECT: Authorize the Town Manager to Execute a Certificate of Acceptance and Notice of Completion for the Work of Pavement Coatings Co. and Authorize Recording by the Town Clerk for PPW No. 19-811-9901 Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) Project DATE: August 27, 2020 FISCAL IMPACT (continued): Street Repair & Resurfacing Project 811-9901 Budget Costs GFAR $ 3,681,401 Gas Tax $ 1,064,292 Prior Reimbursements $ 64,865 Anticipated Reimbursement - Monte Sereno $ 47,000 Anticipated Reimbursement - WVSD & SJW $ 130,000 Total Budget $ 4,987,558 Overlay (DeSilva Gates) $ 1,340,402 Slurry Seal (Pavement Coatings Co) $ 1,855,714 Consultant Costs $ 88,358 Advertising $ 2,410 Blueprint/Copy/Postage $ 2,074 Total Expenditures $ 3,288,958 Remaining Balance $ 1,698,600 Staff Costs Operating Budget (Full time with benefits) $ 199,293 Total $ 199,293 ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption was previously filed. Attachment: 1. Certificate of Acceptance and Notice of Completion