4 NETWORK RECOMMENDATIONS AND PROJECT PRIORITIZATION
ϥLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Table of Contents
CHAPTER FOUR 2020 UPDATE 4
Bike and Pedestrian Master Plan Project Map 6
Table 4.1 Completed Projects & Programs Since 2017 7
Table 4.2 Connect Los Gatos Prioritized Projects 8
Table 4.3 Bicycle Improvement Projects 9
Table 4.4 Pedestrian Improvement Projects Part 1 10
Table 4.4 Pedestrian Improvement Projects Part 2 11
Table 4.5 Townwide Improvements 12
Table 4.6 Townwide Programs Part 1 13
Table 4.6 Townwide Programs Part 2 14
ϦLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
CHAPTER FOUR 2020 UPDATE
dŚĞĂĐƟǀĞƚƌĂŶƐƉŽƌƚĂƟŽŶŶĞƚǁŽƌŬƐŚŽǁŶŝŶƚŚŝƐŝŬĞĂŶĚWĞĚĞƐƚƌŝĂŶDĂƐƚĞƌ
WůĂŶ;WDWͿϮϬϮϬhƉĚĂƚĞƐĞĞŬƐƚŽƉƌŽǀŝĚĞƚŚĞdŽǁŶŽĨ>ŽƐ'ĂƚŽƐĐŽŵŵƵ-
ŶŝƚLJǁŝƚŚƚŚĞŵŽƐƚƌĞůĞǀĂŶƚ͕ĂŶĚƌĞƉƌĞƐĞŶƚĂƟǀĞƌŽĂĚŵĂƉĨŽƌĨƵƚƵƌĞďŝĐLJĐůĞ
ĂŶĚƉĞĚĞƐƚƌŝĂŶŵŽďŝůŝƚLJŝŶǀĞƐƚŵĞŶƚƐ͘
ƵŝůƚŽŶƚŚĞĞǀĂůƵĂƟŽŶĚŽŶĞďLJWůĂĐĞtŽƌŬƐŝŶϮϬϭϳ͕ƚŚŝƐĐŚĂƉƚĞƌƵƉĚĂƚĞ
ŝĚĞŶƟĮĞƐƉƌŽũĞĐƚƐƚŚĂƚŚĂǀĞďĞĞŶĐŽŵƉůĞƚĞĚƐŝŶĐĞϮϬϭϳ͕ƌĞǀŝƐĞƐƚŚĞƉƌŽũĞĐƚ
ůŝƐƚƐƚŽƌĞŇĞĐƚĐƵƌƌĞŶƚĐŽŵŵƵŶŝƚLJĂŶĚŽŵƉůĞƚĞ^ƚƌĞĞƚƐĂŶĚdƌĂŶƐƉŽƌƚĂƟŽŶ
ŽŵŵŝƐƐŝŽŶ;^dͿŝŶƉƵƚ͕ĂŶĚŝŶĐŽƌƉŽƌĂƚĞƐĂŶĞǁŽŶůŝŶĞŝŶƚĞƌĂĐƟǀĞŵĂƉ
ĨĞĂƚƵƌĞƚŚĂƚƌĞŇĞĐƚƐƚŚĞWDW͘
dŚŝƐƵƉĚĂƚĞĚƉůĂŶĂůŝŐŶƐĐƵƌƌĞŶƚďŝŬĞĂŶĚƉĞĚĞƐƚƌŝĂŶƉƌŝŽƌŝƟĞƐǁŝƚŚƚŚĞ
dŽǁŶ͛ƐůŽŶŐͲƌĂŶŐĞŐŽĂůƐ͕ĂŶĚĂůůŽǁƐƚŚĞdŽǁŶƚŽƉĂƌƟĐŝƉĂƚĞŝŶĐŽŵƉĞƟƟǀĞ
ůŽĐĂů͕ƌĞŐŝŽŶĂů͕ĂŶĚ^ƚĂƚĞĨƵŶĚƐĨŽƌĂĐƟǀĞƚƌĂŶƐƉŽƌƚĂƟŽŶŝŵƉƌŽǀĞŵĞŶƚƉƌŽũ-
ĞĐƚƐ͘/ƚĂůƐŽĞŶƐƵƌĞƐƚŚĞůŽŶŐͲƚĞƌŵƐƵĐĐĞƐƐŽĨĐƵƌƌĞŶƚĂŶĚƉŽƚĞŶƟĂůďŝĐLJĐůĞ
ĂŶĚƉĞĚĞƐƚƌŝĂŶƉƌŽŐƌĂŵƐ͕ƐƵĐŚĂƐŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐ͘
ŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐŝƐĂƉƌŽŐƌĂŵŽĨďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶƉƌŽũĞĐƚƐƚŚĂƚƉƌŽ-
ŵŽƚĞĐŽŶŶĞĐƟǀŝƚLJĂŶĚŝŵƉƌŽǀĞƚŚĞŵƵůƟŵŽĚĂůŶĞƚǁŽƌŬƚŚƌŽƵŐŚŽƵƚƚŚĞ
dŽǁŶ͘/ƚǁĂƐůƵŶĐŚĞĚŝŶϮϬϭϵǁŝƚŚƚŚĞƐƵƉƉŽƌƚŽĨƚŚĞŝĐLJĐůĞĂŶĚWĞĚĞƐƚƌŝĂŶ
ĚǀŝƐŽƌLJŽŵŵŝƐƐŝŽŶ;WͿ͘
dŚĞWŚĂƐďĞĞŶĂŶŝŵƉŽƌƚĂŶƚƐƚĂŬĞŚŽůĚĞƌŐƌŽƵƉƚŚƌŽƵŐŚŽƵƚƚŚĞĚĞǀĞů-
ŽƉŵĞŶƚŽĨƚŚĞKƌŝŐŝŶĂůWDWŝŶϮϬϭϲ͘/ŶϮϬϭϵ͕WĚŝƐƐŽůǀĞĚŝŶƚŽƚŚĞĐƵƌ-
ƌĞŶƚŽŵƉůĞƚĞ^ƚƌĞĞƚƐĂŶĚdƌĂŶƐƉŽƌƚĂƟŽŶŽŵŵŝƐƐŝŽŶ;^dͿ͘dŚĞ^dŚĂƐ
ƉƌŽǀŝĚĞĚŐƵŝĚĂŶĐĞĂŶĚƐƵƉƉŽƌƚĨŽƌƚŚŝƐWDWƵƉĚĂƚĞ͘
CHAPTER FOUR OVERVIEW
ŚĂƉƚĞƌ&ŽƵƌƌĞĐŽŵŵĞŶĚƐĂůŝƐƚŽĨƉƌŽũĞĐƚƐĂŶĚƉƌŽŐƌĂŵƐƚŚĂƚǁŝůůĞŶŚĂŶĐĞ
ǁĂůŬŝŶŐ ĂŶĚ ďŝĐLJĐůŝŶŐ ĞŶǀŝƌŽŶŵĞŶƚƐ ƚŽ ŝŵƉƌŽǀĞ ƐĂĨĞƚLJ ĂŶĚ ĂĐĐĞƐƐŝďŝůŝƚLJ
ƚŚƌŽƵŐŚŽƵƚ>ŽƐ'ĂƚŽƐĂŶĚDŽŶƚĞ^ĞƌĞŶŽ͘dŚĞƐĞƌĞĐŽŵŵĞŶĚĂƟŽŶƐŚĂǀĞďĞĞŶ
ĐĂƚĞŐŽƌŝnjĞĚŝŶƚŽƐŝdžŐƌŽƵƉƐ͗
• ŽŵƉůĞƚĞĚƉƌŽũĞĐƚƐƐŝŶĐĞϮϬϭϳ;ƚĂďůĞϰ͘ϭͿ͖
• ŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐWƌŝŽƌŝƟnjĞĚWƌŽũĞĐƚƐ;ƚĂďůĞϰ͘ϮͿ͖
• ŝĐLJĐůĞ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚƐ;ƚĂďůĞϰ͘ϯͿ͖
• WĞĚĞƐƚƌŝĂŶ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚƐ;ƚĂďůĞϰ͘ϰͿ͖
• dŽǁŶǁŝĚĞ/ŵƉƌŽǀĞŵĞŶƚƐ;ƚĂďůĞϰ͘ϱͿĂŶĚ
• dŽǁŶǁŝĚĞWƌŽŐƌĂŵƐ;ƚĂďůĞϰ͘ϲͿ͘
ŶŽŶůŝŶĞ͕ŝŶƚĞƌĂĐƟǀĞ^ƚŽƌLJDĂƉŚĂƐďĞĞŶĐƌĞĂƚĞĚƚŽŶŽƚĞƚŚĞůŽĐĂƟŽŶŽĨ
ƉƌŽƉŽƐĞĚďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶƉƌŽũĞĐƚƐ͘/ŶĂĚĚŝƟŽŶ͕ƌĞĐŽŵŵĞŶĚĞĚĞĚƵĐĂ-
ƟŽŶ͕ĞŶĐŽƵƌĂŐĞŵĞŶƚ͕ĞŶĨŽƌĐĞŵĞŶƚĂŶĚŵĂŝŶƚĞŶĂŶĐĞƉƌŽŐƌĂŵƐůŝƐƚĞĚŝŶƚŚŝƐ
ĐŚĂƉƚĞƌĚŝƌĞĐƚůLJƌĞĨĞƌĞŶĐĞƉŽůŝĐŝĞƐĂŶĚĂĐƟŽŶƐĞƐƚĂďůŝƐŚĞĚŝŶŚĂƉƚĞƌϯŽĨƚŚĞ
KƌŝŐŝŶĂůWDW͘
ZĞĐŽŵŵĞŶĚĂƟŽŶƐŚĂǀĞďĞĞŶĂƌƌĂŶŐĞĚďĂƐĞĚŽŶǁŚĞƚŚĞƌƚŚĞLJƐĂƟƐĨLJĐƌŝƚĞƌŝĂ
ƐƵĐŚĂƐ͕ďƵƚŶŽƚůŝŵŝƚĞĚƚŽ͕ŝŵƉƌŽǀŝŶŐƐĂĨĞƚLJ͕ĞdžƉĂŶĚŝŶŐĂĐĐĞƐƐ͕ĐůŽƐŝŶŐŶĞƚ-
ǁŽƌŬŐĂƉƐ͕ĂŶĚĞƐƟŵĂƚĞĚĐŽƐƚƐ͘&ŽůůŽǁŝŶŐƚŚĞĐƌŝƚĞƌŝĂƐƚĂŶĚĂƌĚƐƐĞƚĂƐƉĂƌƚŽĨ
ƚŚŝƐWůĂŶ͕ƚŚĞŝĐLJĐůĞĂŶĚWĞĚĞƐƚƌŝĂŶĚǀŝƐŽƌLJŽŵŵŝƐƐŝŽŶ;WͿŝĚĞŶƟĮĞĚ
ĂƐŚŽƌƚůŝƐƚŽĨƚŽƉͲƉƌŝŽƌŝƚLJƉƌŽũĞĐƚƐĂŶĚƉƌŽŐƌĂŵƐƚŚĂƚĞdžĞŵƉůŝĨLJWůĂŶĐƌŝƚĞƌŝĂ
ĂŶĚĂƌĞŽĨŚŝŐŚĞƐƚǀĂůƵĞƚŽŝŵƉƌŽǀŝŶŐƚŚĞdŽǁŶ͛ƐďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶŶĞƚ-
ǁŽƌŬ͘dŚŝƐůŝƐƚŚĂƐďĞĞŶƵƉĚĂƚĞĚƐŝŶĐĞƚŚĞŽƌŝŐŝŶĂůWDWŝŶϮϬϭϳ͘dŚĞƐĞƌĞĐ-
ŽŵŵĞŶĚĂƟŽŶƐĂƌĞůŝƐƚĞĚĂƐ͞ŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐWƌŽũĞĐƚƐ͟ĂŶĚĂƌĞƉƌĞƐĞŶƚĞĚ
ĂƚƚŚĞďĞŐŝŶŶŝŶŐŽĨƚŚŝƐĐŚĂƉƚĞƌŝŶƚĂďůĞϰ͘Ϯ͘ŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐWƌŽũĞĐƚƐǁĞƌĞ
ŝĚĞŶƟĮĞĚĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞŽŵƉůĞƚĞ^ƚƌĞĞƚƐĂŶĚdƌĂŶƐƉŽƌƚĂƟŽŶŽŵ-
ŵŝƐƐŝŽŶ;^dͿŝŶϮϬϮϬ͘
ESTABLISHING CRITERIA FOR INFRASTUCTURE
IMPROVEMENTS
CRITERIA FOR PROJECT IMPROVEMENTS
ůŝƐƚŽĨĐƌŝƚĞƌŝĂǁĂƐĚĞǀĞůŽƉĞĚďĂƐĞĚŽŶŝŶƉƵƚƌĞĐĞŝǀĞĚŽŶďŝĐLJĐůĞĂŶĚƉĞĚĞƐ-
ƚƌŝĂŶƉƌŝŽƌŝƟĞƐƚŚƌŽƵŐŚŽƵƚƚŚĞĚĞǀĞůŽƉŵĞŶƚŽĨWDW͕ĂƐƐƵŵŵĂƌŝnjĞĚƚŚƌŽƵŐŚ
ƚŚĞWůĂŶ͛ƐsŝƐŝŽŶ^ƚĂƚĞŵĞŶƚŝŶŚĂƉƚĞƌϭ͘dŚŝƐĨĞĞĚďĂĐŬŝŶĐůƵĚĞĚŝŶĐŽƌƉŽƌĂƟŶŐ
ĐŽŵŵĞŶƚƐĨƌŽŵƚŚĞdžŝƐƟŶŐŽŶĚŝƟŽŶƐKŶůŝŶĞ^ƵƌǀĞLJ;ǁŚŝĐŚƌĞĐĞŝǀĞĚĂƉƉƌŽdž-
ŝŵĂƚĞůLJϵϬϬƌĞƐƉŽŶƐĞƐͿ͕ŝĐLJĐůĞWĞĚĞƐƚƌŝĂŶĚǀŝƐŽƌLJŽŵŵŝƐƐŝŽŶŽŵŵƵŶŝƚLJ
DĞĞƟŶŐƐŚĞůĚĂƚƚŚĞdŽǁŶŽƵŶĐŝůŚĂŵďĞƌƐ͕ĂƐǁĞůůĂƐĐŽŵŵĞŶƚƐƐƵďŵŝƩĞĚ
ĨƌŽŵĐŽŶƐƟƚƵĞŶƚƐƚŽdŽǁŶ^ƚĂī͘&ƌŽŵĨĞĞĚďĂĐŬƌĞĐĞŝǀĞĚ͕ƚŚĞĨŽůůŽǁŝŶŐĐĂƚĞ-
ŐŽƌŝĞƐŽĨWƌŽũĞĐƚƌŝƚĞƌŝĂŚĂǀĞďĞĞŶĚĞǀĞůŽƉĞĚďĞůŽǁĨŽƌŝĐLJĐůĞ/ŵƉƌŽǀĞŵĞŶƚ
WƌŽũĞĐƚƐ;dĂďůĞϰ͘ϯͿ͕WĞĚĞƐƚƌŝĂŶ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚƐ;dĂďůĞϰ͘ϰͿĂŶĚdŽǁŶ-
ǁŝĚĞ/ŵƉƌŽǀĞŵĞŶƚWƌŽũĞĐƚƐ;dĂďůĞϰ͘ϳͿ͘/ŶĂĚĚŝƟŽŶ͕ƉƌŽũĞĐƚƐŝŶƚĂďůĞƐϰ͘ϭ͕ϰ͘Ϯ͕
ϰ͘ϯĂŶĚϰ͘ϰŝŶƚŚŝƐĐŚĂƉƚĞƌĂƌĞƌĞĨĞƌĞŶĐĞĚŝŶĂŶŽŶůŝŶĞŝŶƚĞƌĂĐƟǀĞ^ƚŽƌLJDĂƉƚŽ
ƐŚŽǁǁŚĞƌĞĞĂĐŚƉƌŽũĞĐƚŝƐůŽĐĂƚĞĚ͘ďƌŝĞĨĚĞƐĐƌŝƉƟŽŶŽĨǁŚĂƚŝƐŝŶĐůƵĚĞĚŝŶ
ĞĂĐŚĐƌŝƚĞƌŝŽŶŝƐĚĞƐĐƌŝďĞĚďĞůŽǁ͗
• ŶŚĂŶĐĞƐ^ĂĨĞƚLJ͗/ŶĨƌĂƐƚƌƵĐƚƵƌĞŝŵƉƌŽǀĞŵĞŶƚƐŝŵƉƌŽǀŝŶŐƚŚĞƐĂĨĞƚLJŽĨƚŚĞ
ďŝĐLJĐůŝƐƚ͕ƉĞĚĞƐƚƌŝĂŶŽƌŽƚŚĞƌƌŽĂĚǁĂLJƵƐĞƌǀĞƌƐƵƐĞdžŝƐƟŶŐĐŽŶĚŝƟŽŶƐĂƌĞ
ŝĚĞŶƟĮĞĚŝŶƚŚŝƐĐĂƚĞŐŽƌLJ͘
• ŝƌĞĐƚĐĐĞƐƐƚŽ<ĞLJĞƐƟŶĂƟŽŶƐͬdƌĂŝůƐ͗dŚŝƐŝŶĐůƵĚĞƐŬĞLJĐŝǀŝĐ͕ƌĞƚĂŝů͕ƌĞĐƌĞ-
ĂƟŽŶĂů͕ĞĚƵĐĂƟŽŶĂů͕ĂŶĚĞŵƉůŽLJŵĞŶƚĚĞƐƟŶĂƟŽŶƐŝŶ>ŽƐ'ĂƚŽƐĂŶĚDŽŶƚĞ
^ĞƌĞŶŽ͘
• ůŽƐĞƐ džŝƐƟŶŐ EĞƚǁŽƌŬ 'ĂƉƐ ;ŝĐLJĐůĞ WƌŽũĞĐƚ /ŵƉƌŽǀĞŵĞŶƚƐ KŶůLJͿ͗ Ɛ
ĞdžŝƐƟŶŐĞĂƐƚͲǁĞƐƚĂŶĚŶŽƌƚŚͲƐŽƵƚŚŐĂƉƐŝŶƚŚĞďŝĐLJĐůĞŶĞƚǁŽƌŬĂƌĞĂŬĞLJ
ĐŽŶĐĞƌŶƚŚĂƚŚĂƐďĞĞŶƌĂŝƐĞĚďLJƚŚĞĐŽŵŵƵŶŝƚLJ͕ĐƌŽƐƐͲƚŽǁŶƌŽƵƚĞƐƉƌŽ-
ƉŽƐŝŶŐĚĞĚŝĐĂƚĞĚĂŶĚƐĞƉĂƌĂƚĞĚďŝĐLJĐůĞŝŶĨƌĂƐƚƌƵĐƚƵƌĞƚŚĂƚŵĂŬĞƐŝŐŶŝĮĐĂŶƚ
ƉƌŽŐƌĞƐƐŝŶĐůŽƐŝŶŐƚŚĞƐĞŐĂƉƐ;ƐƵĐŚĂƐďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶŝŶĨƌĂƐƚƌƵĐƚƵƌĞ
ĐƌŽƐƐŝŶŐ,ŝŐŚǁĂLJϭϳͿŚĂǀĞďĞĞŶĂĐĐŽƵŶƚĞĚĨŽƌŝŶƚŚŝƐĐĂƚĞŐŽƌLJ͘
• /ŵƉƌŽǀĞƐĐĐĞƐƐĨŽƌƚŚĞDŽďŝůŝƚLJ/ŵƉĂŝƌĞĚ;WĞĚĞƐƚƌŝĂŶĂŶĚdŽǁŶǁŝĚĞWƌŽũ-
ĞĐƚ/ŵƉƌŽǀĞŵĞŶƚƐKŶůLJͿ͗ŶŚĂŶĐĞĚĂĐĐĞƐƐƚŽƌŽĂĚǁĂLJƐĨŽƌƚŚĞŵŽďŝůŝƚLJŝŵ-
ƉĂŝƌĞĚŝƐŝŶĐůƵĚĞĚŝŶƚŚŝƐĐĂƚĞŐŽƌLJ͕ǁŚŝĐŚŵĂŝŶůLJĨŽĐƵƐĞƐŽŶƉŚLJƐŝĐĂůŝŶĨƌĂщ-
ƐƚƌƵĐƚƵƌĞŝŵƉƌŽǀĞŵĞŶƚƐĨŽƌƉĞĚĞƐƚƌŝĂŶƐŽĨĂůůĂďŝůŝƟĞƐ͘
• /ŵƉƌŽǀĞƐdžŝƐƟŶŐ^ĂĨĞZŽƵƚĞƐƚŽ^ĐŚŽŽůĐĐĞƐƐ͗/ŶĨƌĂщƐƚƌƵĐƚƵƌĞŝŵƉƌŽǀĞ-
ŵĞŶƚƐŝĚĞŶƟĮĞĚŝŶƚŚĞ͞>ŽƐ'ĂƚŽƐ^ĂĨĞZŽƵƚĞƐƚŽ^ĐŚŽŽůWŚĂƐĞϭ͟ƌĞƉŽƌƚ
ĂƌĞĚŝƐĐƵƐƐĞĚŝŶƚŚŝƐĐĂƚĞŐŽƌLJ͕ĂƐǁĞůůĂƐďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶŝŵƉƌŽǀĞ-
ŵĞŶƚƐƚŚĂƚĚŝƌĞĐƚůLJĐŽŶŶĞĐƚƚŽĚĞƐŝŐŶĂƚĞĚ^ĐŚŽŽůtĂůŬŝŶŐZŽƵƚĞƐĂƐĚŝƐ-
ĐƵƐƐĞĚŝŶƚŚĂƚƌĞƉŽƌƚ͘
• /ŵƉƌŽǀĞƐ džŝƐƟŶŐ /ŶĨƌĂƐƚƌƵĐƚƵƌĞ͗ ŶŚĂŶĐĞŵĞŶƚƐ ƚŽ ĞdžŝƐƟŶŐ ƐŝĚĞǁĂůŬƐ͕
ĐƌŽƐƐǁĂůŬƐ͕ĂŶĚďŝŬĞǁĂLJƐĂƌĞŝĚĞŶƟĮĞĚ͘
• džŝƐƟŶŐ,ŝŐŚͲĐƟǀŝƚLJƌĞĂ͗dŚŝƐĐĂƚĞŐŽƌLJŐŝǀĞƐƉƌŝŽƌŝƚLJƚŽŝŵƉůĞŵĞŶƚĂƟŽŶ
ŽĨƉƌŽũĞĐƚƐƚŚĂƚĂƌĞǁŝƚŚŝŶĂƌĞĂƐŽĨƚŽǁŶƚŚĂƚĐŽŶƚĂŝŶŚŝŐŚďŝĐLJĐůĞĂŶĚƉĞ-
ĚĞƐƚƌŝĂŶǀŽůƵŵĞƐ͕ŚŝŐŚĂŵŽƵŶƚƐŽĨďŝĐLJĐůĞͲǀĞŚŝĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶͲǀĞŚŝĐůĞ
ĐŽůůŝƐŝŽŶƐ͕ŽƌďŽƚŚ͘
ZĞĐŽŵŵĞŶĚĂƟŽŶƐŽƵƚůŝŶĞĚŝŶƚŚŝƐĐŚĂƉƚĞƌĂƌĞĐŽŶƐŝĚĞƌĞĚƉůĂŶŶŝŶŐͲůĞǀĞůŝŶ-
ĨŽƌŵĂƟŽŶ͘dŚĞLJƐŚŽƵůĚďĞƵƐĞĚĂƐĂŐƵŝĚĞǁŚĞŶŝŵƉůĞŵĞŶƟŶŐƉƌŽũĞĐƚƐ͘Ě-
ĚŝƟŽŶĂůƐŝƚĞͲƐƉĞĐŝĮĐĂŶĂůLJƐŝƐŝƐƌĞƋƵŝƌĞĚƚŽĚĞǀĞůŽƉĚĞƐŝŐŶƐƚŚĂƚƌĞŇĞĐƚĞĂĐŚ
ƉƌŽũĞĐƚƐĐŽŶĚŝƟŽŶĂŶĚĐŽŶƐƚƌĂŝŶƚƐ͘
ϧLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
• /ŶĐƌĞĂƐĞƐŝĐLJĐůĞͬWĞĚĞƐƚƌŝĂŶĐƟǀŝƚLJ͗dŚĞƐĞĐŽŶƐŝƐƚŽĨƉŚLJƐŝĐĂůŝŵƉƌŽǀĞ-
ŵĞŶƚƐƚŚĂƚĞŶĐŽƵƌĂŐĞďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶĂĐƟǀŝƚLJďLJŝŶĐƌĞĂƐŝŶŐĐŽŵ-
ĨŽƌƚĨŽƌĂůůƵƐĞƌƐ͘džĂŵƉůĞƐŽĨŝŵƉƌŽǀĞŵĞŶƚƐŝŶĐůƵĚĞŝŶƐƚĂůůŝŶŐƉƌŽƚĞĐƚĞĚ
ďŝĐLJĐůĞůĂŶĞƐŽŶĂƌŽĂĚǁĂLJƚŚĂƚĚŝĚŶŽƚŚĂǀĞĂĚĞĚŝĐĂƚĞĚďŝŬĞĨĂĐŝůŝƚLJŽƌ
ƉƌŽǀŝĚŝŶŐŚŝŐŚǀŝƐŝďŝůŝƚLJĐƌŽƐƐǁĂůŬƐǁŝƚŚŇĂƐŚŝŶŐďĞĂĐŽŶƐǁŚĞƌĞƚŚĞƌĞ
ǁĂƐƉƌĞǀŝŽƵƐůLJĂŶƵŶŵĂƌŬĞĚĐƌŽƐƐǁĂůŬĂƌĞŝĚĞŶƟĮĞĚŝŶƚŚŝƐĐĂƚĞŐŽƌLJ͘
PREPARATION OF PRELIMINARY COST ESTIMATES
FOR INFRASTRUCTURE PROJECTS
ƐƉĂƌƚŽĨƚŚĞĨŽƌŵĂƟŽŶŽĨƉƌŽũĞĐƚĐƌŝƚĞƌŝĂĂŶĚƚŚĞƉƌŝŽƌŝƟnjĂщƟŽŶŽĨƉŚLJƐŝĐĂů
ƉƌŽũĞĐƚƐ͕ŽƌĚĞƌͲŽĨͲŵĂŐŶŝƚƵĚĞĐŽƐƚĞƐƟŵĂƚĞƐĨŽƌĞĂĐŚƉŚLJƐŝĐĂůƉƌŽũĞĐƚŚĂǀĞ
ďĞĞŶƉƌŽǀŝĚĞĚƚŽĂƐƐŝƐƚŝŶƚŚĞĂůůŽĐĂƟŽŶŽĨĨƵŶĚƐĨŽƌƉƌŽũĞĐƚŝŵƉůĞŵĞŶƚĂ-
ƟŽŶ͘dŚĞƐĞĞƐƟŵĂƚĞƐƐŚŽƵůĚďĞƵƐĞĚĨŽƌƉůĂŶŶŝŶŐƉƵƌƉŽƐĞƐŽŶůLJ͕ĂƐŵŽƌĞ
ĚĞƚĂŝůĞĚƉƌŽũĞĐƚͲůĞǀĞůĐŽƐƚĞƐƟŵĂƚĞƐǁŝůůďĞƉƌĞƉĂƌĞĚŽŶĐĞĨƵŶĚŝŶŐŝƐƐĞ-
ĐƵƌĞĚĨŽƌĂŶŝŶĚŝǀŝĚƵĂůƉƌŽũĞĐƚ͘dŚĞĐŽƐƚĞƐƟŵĂƚĞƐĨŽƌĂĐƟǀĞƉƌŽũĞĐƚƐǁĞƌĞ
ƵƉĚĂƚĞĚďĂƐĞĚŽŶƚŚĞĞŶŐŝŶĞĞƌŝŶŐǁŽƌŬŚĂƐĐŽŵƉůĞƚĞĚ͘
CONSISTENCY WITH SAFE ROUTES TO SCHOOL
RECOMMENDATIONS
/ŶĂĚĚŝƟŽŶƚŽůŝƐƟŶŐƌĞĐŽŵŵĞŶĚĞĚƚŽǁŶͲǁŝĚĞďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶƉƌŽũ-
ĞĐƚƐĂŶĚƉƌŽŐƌĂŵƐ͕ƉƌŽũĞĐƚƌĞĐŽŵŵĞŶĚĂƟŽŶƐĨƌŽŵƚŚĞ͞>ŽƐ'ĂƚŽƐ^ĂĨĞ
ZŽƵƚĞƐƚŽ^ĐŚŽŽůWŚĂƐĞϭ͟ƌĞƉŽƌƚĂĚŽƉƚĞĚďLJdŽǁŶŽƵŶĐŝůŽŶKĐƚŽďĞƌϮϬϭϲ
ŚĂǀĞďĞĞŶŝŶƚĞŐƌĂƚĞĚŝŶƚŽWůĂŶƌĞĐŽŵŵĞŶĚĂƟŽŶƐ͘dŚŝƐŝŶĐůƵĚĞƐŝŶƉƵƚŽŶ
ƉŚĂƐŝŶŐƉƌŽũĞĐƚƐďĂƐĞĚŽŶĐƌŝƚĞƌŝĂƉƌŽǀŝĚĞĚŝŶƚŚŝƐĐŚĂƉƚĞƌ͕ǁŝƚŚ^ĂĨĞZŽƵƚĞƐ
ƚŽ^ĐŚŽŽůƌĞĐŽŵŵĞŶĚĂƟŽŶƐƉƌĞƐĞŶƚĞĚŝŶĚĞƚĂŝůŝŶƉƉĞŶĚŝdž/
PROJECT PRIORITIZATION
WƌŽũĞĐƚƉƌŝŽƌŝƟnjĂƟŽŶĨŽƌƚŚŝƐƵƉĚĂƚĞŚĂƐďĞĞŶďƵŝůƚƵƉŽŶƚŚĞĂƐƐĞƐƐŵĞŶƚ
ĚŽŶĞďLJWůĂĐĞtŽƌŬƐŝŶϮϬϭϲĂŶĚϮϬϭϳ͘dŚĞŝƌĐŽŵƉƌĞŚĞŶƐŝǀĞǁŽƌŬŚĂƐŝĚĞŶ-
ƟĮĞĚŬĞLJŝŵƉƌŽǀĞŵĞŶƚƉƌŽũĞĐƚƐĨŽƌƚŚĞĐŽŵŵƵŶŝƚLJŽĨ>ŽƐ'ĂƚŽƐ͘ƐĂŶĂĚ-
ĚŝƟŽŶƚŽƚŚĞǁŽƌŬĚŽŶĞŝŶƉƌĞǀŝŽƵƐLJĞĂƌƐ͕ĂŶƵƉĚĂƚĞĚĂƐƐĞƐƐŵĞŶƚŽĨƉƌŽũĞĐƚ
ƉƌŝŽƌŝƟnjĂƟŽŶŚĂƐďĞĞŶŝĚĞŶƟĮĞĚƚŚƌŽƵŐŚƌĞĐĞŶƚƉƵďůŝĐŝŶƉƵƚ͕ĂŶĚŽŵƉůĞƚĞ
^ƚƌĞĞƚƐĂŶĚdƌĂŶƐƉŽƌƚĂƟŽŶŽŵŵŝƐƐŝŽŶĨĞĞĚďĂĐŬ͘^ŝŵŝůĂƌƚŽƚŚĞĂŶĂůLJƐŝƐ
ĐŽŶĚƵĐƚĞĚďLJWůĂĐĞtŽƌŬƐ͕ƉĂƌƟĐƵůĂƌƉƌŽũĞĐƚĐƌŝƚĞƌŝĂǁĞƌĞĂůƐŽĐŽŶƐŝĚĞƌĞĚ͘
dŚĞƐĞĐƌŝƚĞƌŝĂŝŶĐůƵĚĞďƵƚĂƌĞŶŽƚůŝŵŝƚĞĚƚŽŝŵƉƌŽǀŝŶŐƐĂĨĞƚLJ͕ĞdžƉĂŶĚŝŶŐ
ĂĐĐĞƐƐ͕ĂŶĚĐůŽƐŝŶŐŶĞƚǁŽƌŬŐĂƉƐ͘WƵďůŝĐŝŶƉƵƚŚĂƐďĞĞŶĂǀĂůƵĂďůĞĂƐƉĞĐƚŽĨ
ƚŚŝƐWDWƵƉĚĂƚĞ͘^ƚĂīĐŽŶĚƵĐƚĞĚĂŶĐƟǀĞdƌĂŶƐƉŽƌƚĂƟŽŶ^ƵƌǀĞLJŝŶ:ƵůLJ
ϮϬϮϬƚŽďĞƩĞƌƵŶĚĞƌƐƚĂŶĚŚŽǁƌĞƐŝĚĞŶƚƐĂƌĞƵƐŝŶŐƚŚĞƐƚƌĞĞƚƐƚŽŵĞĞƚƚŚĞŝƌ
ŶĞĞĚƐ͘dŚĞŝƌƐƵŐŐĞƐƟŽŶƐŽŶŝŵƉƌŽǀĞŵĞŶƚƐŚĂǀĞŚĞůƉĞĚŝŶĨŽƌŵƚŚĞƉƌŽũĞĐƚ
ůŝƐƚƐ͘
ESTABLISHING CRITERIA AND PRIORITIZATION
FOR TOWNWIDE PROGRAMS
/ŶĂĚĚŝƟŽŶƚŽĚĞǀĞůŽƉŝŶŐĐƌŝƚĞƌŝĂĂŶĚĐƌĞĂƟŶŐůŝƐƚŽĨďŝĐLJĐůĞĂŶĚƉĞĚĞƐƚƌŝĂŶ
ƉƌŽũĞĐƚƐ͕ƚŚĞŝĐLJĐůĞĂŶĚWĞĚĞƐƚƌŝĂŶDĂƐƚĞƌWůĂŶĂůƐŽĐŽŶƚĂŝŶƐĂůŝƐƚŽĨƉƌŽ-
ŐƌĂŵƐ͕ǁŚŝĐŚĂƌĞĚĞƐĐƌŝďĞĚŝŶŐƌĞĂƚĞƌĚĞƚĂŝůŝŶdĂďůĞϰ͘ϱ͘
ƌŝƚĞƌŝĂĚĞǀĞůŽƉĞĚĨŽƌƚŚĞWDWƉƌŽŐƌĂŵƐĂƌĞďĂƐĞĚŽŶĨŽƵƌŽƌŐĂŶŝnjŝŶŐ
ƉƌŝŶĐŝƉůĞƐĚĞǀĞůŽƉĞĚďLJƚŚĞWŝŶĞĐĞŵďĞƌϮϬϭϲ͕ǁŚŝĐŚĚŝƌĞĐƚůLJƌĞŇĞĐƚ
ĂŶĚŝŵƉůĞŵĞŶƚĐŽŵƉŽŶĞŶƚƐŽĨƚŚĞ͞ƐƐĞŶƟĂůůĞŵĞŶƚƐŽĨĂŝĐLJĐůĞ&ƌŝĞŶĚůLJ
ŵĞƌŝĐĂ͟ĂƐƐƵƉƉŽƌƚĞĚďLJƚŚĞ>ĞĂŐƵĞŽĨŵĞƌŝĐĂŶŝĐLJĐůŝƐƚƐĂŶĚƚŚĞĂůŝĨŽƌ-
ŶŝĂdƌĂŶƐƉŽƌƚĂщƟŽŶŽŵŵŝƐƐŝŽŶ͘dŚĞƐĞĐƌŝƚĞƌŝĂŝŶĐůƵĚĞ͗
• ^ƵƉƉŽƌƟŶŐƚŚĞZĞĚƵĐƟŽŶͬůŝŵŝŶĂƟŽŶŽĨ&ĂƚĂůŝƟĞƐ
• ŶĐŽƵƌĂŐŝŶŐ^ƚƵĚĞŶƚƐƚŽtĂůŬĂŶĚŝŬĞ
• /ŶĐƌĞĂƐŝŶŐŽŶŶĞĐƟǀŝƚLJŽĨƚŚĞŝŬĞͬWĞĚEĞƚǁŽƌŬ
• ^ƵƉƉŽƌƟŶŐ^ŚŽǀĞůͲZĞĂĚLJWƌŽũĞĐƚƐ
/ƚŝƐǁŽƌƚŚŶŽƟŶŐƚŚĂƚƚŚĞƉƌŽŐƌĂŵůŝƐƚĚĞǀĞůŽƉĞĚŝŶdĂďůĞϰ͘ϲĚŝƌĞĐƚůLJĐŽƌ-
ƌĞůĂƚĞƐǁŝƚŚƚŚĞƉŽůŝĐŝĞƐĂŶĚĂĐƟŽŶƐĚĞƐĐƌŝďĞĚŝŶŚĂƉƚĞƌϯŽĨƚŚĞŽƌŝŐŝŶĂů
WDW͘ĐƟŽŶƐůŝƐƚĞĚŝŶdĂďůĞϰ͘ϲĂƌĞƚŚŽƐĞƚŚĂƚƐƉĞĐŝĮĐĂůůLJĨŽĐƵƐŽŶƉƌŽŐƌĂŵƐ
ƚŚĂƚĐĂŶďĞŝŶĚŝǀŝĚƵĂůůLJŝŵƉůĞŵĞŶƚĞĚ͕ǁŚŝůĞWŽůŝĐŝĞƐůŝƐƚĞĚŝŶdĂďůĞϰ͘ϱĂƌĞ
ƚŚŽƐĞƚŚĂƚĂƌĞďĞƐƚĞdžĞĐƵƚĞĚƚŚƌŽƵŐŚƚŚĞĐŽŶĐƵƌƌĞŶƚŝŵƉůĞŵĞŶƚĂƟŽŶŽĨĂůů
ŝŶĚŝǀŝĚƵĂůĂĐƟŽŶƐůŝƐƚĞĚƵŶĚĞƌƚŚĂƚƉŽůŝĐLJ͘WŽůŝĐŝĞƐĂŶĚĐƟŽŶƐƚŚĂƚĂƌĞĐŽǀ-
ĞƌĞĚŝŶŚĂƉƚĞƌϯďƵƚŶŽƚŝŶdĂďůĞϰ͘ϲĂƌĞƉƌŽũĞĐƚͲďĂƐĞĚ͕ĂŶĚĂƌĞĚĞƐĐƌŝďĞĚŝŶ
ŐƌĞĂƚĞƌĚĞƚĂŝůŝŶƚŚĞďŝĐLJĐůĞ͕ƉĞĚĞƐƚƌŝĂŶ͕ĂŶĚƚŽǁŶǁŝĚĞƉƌŽũĞĐƚƚĂďůĞƐ;dĂďůĞƐ
ϰ͘ϯͲϰ͘ϲͿŝŶƚŚŝƐĐŚĂƉƚĞƌ͘
2017 BICYCLE AND PEDESTRIAN ADVISORY COM-
MISSION (BPAC) & 2019 COMPLETE STREETS AND
TRANSPORTATION COMMISSION (CSTC) PRIORITY
PROJECTS AND PROGRAMS
&ƌŽŵƚŚĞůŝƐƚŽĨƌĞĐŽŵŵĞŶĚĞĚƉƌŽũĞĐƚƐĂŶĚƉƌŽŐƌĂŵƐ͕ƚŚĞWŚĂƐŝĚĞŶƟ-
ĮĞĚĂƐŚŽƌƚůŝƐƚŽĨƚŽƉͲƌĂŶŬŝŶŐƉƌŽũĞĐƚƐ͕ǁŚŝĐŚŵŝƌƌŽƌĂŶĚĞdžĞŵƉůŝĨLJƚŚĞĐĂƚĞ-
ŐŽƌŝĞƐŽĨĐƌŝƚĞƌŝĂƐĞůĞĐƚĞĚĨŽƌWůĂŶƉƌŝŽƌŝƟnjĂƟŽŶ͘&ƌŽŵƚŚŝƐŽƌŝŐŝŶĂůƉƌŽũĞĐƚůŝƐƚ͕
ƚŚĞ^dŚĂƐĂƉƉƌŽǀĞĚĂŶƵƉĚĂƚĞĚůŝƐƚƚŚĂƚŝŶĐůƵĚĞƐďŽƚŚƚŚĞƉƌŽũĞĐƚƐŽƌŝŐŝ-
ŶĂůůLJŝĚĞŶƟĮĞĚďLJƚŚĞW͕ĂƐǁĞůůĂƐƐŽŵĞƉƌŽũĞĐƚƐƚŚĂƚŚĂǀĞďĞĞŶŝĚĞŶƟ-
ĮĞĚƚŚƌŽƵŐŚƌĞĐĞŶƚĐŽŵŵƵŶŝƚLJŽƵƚƌĞĂĐŚĞīŽƌƚƐ͘ŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐWƌŝŽƌŝƚLJ
WƌŽũĞĐƚƐĂƌĞůŝƐƚĞĚŝŶdĂďůĞϰ͘Ϯ͕ǁŝƚŚdŽǁŶǁŝĚĞWƌŽũĞĐƚƐůŝƐƚĞĚŝŶdĂďůĞϰ͘ϱĂŶĚ
dŽǁŶǁŝĚĞWƌŽŐƌĂŵƐůŝƐƚĞĚŝŶdĂďůĞϰ͘ϲ͘ZĞĐŽŵŵĞŶĚĂƟŽŶƐƚŚĂƚĨŽĐƵƐĞĚŽŶ
ƉƌŝŽƌŝƟnjĞĚ^ĂĨĞZŽƵƚĞƐƚŽ^ĐŚŽŽůWƌŽũĞĐƚƐĂƌĞƉƌŽǀŝĚĞĚŝŶƉƉĞŶĚŝdž:͘
ϨLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
&RQQHFW/RV*DWRV,QWHUVHFWLRQ3URMHFWV
3HGHVWULDQ,PSURYHPHQW3URMHFWV
&RQQHFW/RV*DWRV%LNH 3HG3URMHFWV
%LNH,PSURYHPHQW3URMHFWV
([LVWLQJ%LNHZD\V
6FKRROV
0RQWH6HUHQR&LW\/LPLWV
/RV*DWRV7RZQ/LPLWV
%LNHDQG3HGHVWULDQ0DVWHU
3ODQ3URMHFW0DS
Bike and Pedestrian Master Plan Project Map
ϩLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Original Project
Number Project Location From To Project Type Construction Cost Project
Completed
33 Blossom Hill Road Blossom Hill Road at Roberts Road East High Visibility Crosswalks Part of 37 2019
35 Blossom Hill Road Blossom Hill Road at Cherry Blossom Lane High Visibility Crosswalks & Remove Right on
Red $500,000 2019
NA Blossom Hill Road Blossom Hill Road Hillbrook Drive Rectangular Rapid Flash Beacon $22,000 2020
37 Blossom Hill Road Roberts Road West Los Gatos Boulevard Enhanced Class II Bike Lanes to IV Cycle
Tracks $500,000 2019
2
Daves Avenue at Daves Elementary
School Entrance (just west of Poppy
Lane)
Daves Avenue
Daves Elementary School
Entrance (just West of
Poppy Lane)
High Visibility Crosswalks $50,000
7 Highway 9 Highway 9 at Massol Avenue High Visibility Crosswalks & Flashing Beacons
& Remove Right on Red $400,000 2020
11 Knowles Drive Pollard Road Dell Avenue Class II Bike Lanes $520,000 2020
36 Los Gatos Boulevard Lark Avenue Highway 9 Class II Bike Lanes $225,000 2017
34 Los Gatos Boulevard Los Gatos Boulevard at Blossom Hill Road High Visibility Crosswalks & Remove Right on
Red $311,550 2017
31 Los Gatos Boulevard Shannon Road Roberts Road East High Visibility Crosswalks & Remove Right on
Red $15,000 2017
36 Los Gatos Boulevard at Los Gatos
Almaden Road Los Gatos Boulevard Los Gatos Almaden Road High Visibility Crosswalks $120,000 2018
23 National Avenue Samaritan Drive Los Gatos-Almaden Road Class III Bike Routes: Sharrows $909,000 2019
30 Nino Avenue at Fisher Avenue Nino Avenue Fisher Avenue High Visibility Crosswalks $77,500
32 Roberts Road East Roberts Road East at Fisher Avenue Remove Right on Red Part of 37 2019
22 University Avenue Main Street Highway 9 Class III Bike Routes: Sharrows $13,800 2020
4 University Avenue at Blossom Hill
Road University Avenue Blossom Hill Road High Visibility Crosswalks & Remove Right on
Red 2019
Table 4.1 Completed Projects & Programs Since 2017
ϪLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
4.2a BIKE AND PEDESTRIAN PROJECTS
Project Number Project Name Location From To Enhances safety Direct Access to Key Destinations / Trails Closes Existing Network Gaps Improves Safe Routes to School Improves Existing Infrastructure Existing High Activity Area Increases Bike Activity Length (Miles) Cost Estimate Ease of Implementation Phase
1 Bicycle and Pedestrian Overcrossing over Highway 17 South of Blossom Hill Road over Highway 17 Roberts Road East Roberts Road West x x x x x x x 0.3 $25,000,000*Complex Long-Term
2 BPOC connecting Los Gatos Creek Trail to Farley Road
____________
Los Gatos Creek Trail Farley Road x x x x 0.1 $6,000,000*Complex Long-Term
3 Class I Multi Use Connection from Creek Trail to Los
Gatos Saratoga Road In the back of LGHS Along East side of Highway
17 (just north of Main Street)
Via north side of Helm Field Los Gatos Saratoga Road x x x x x x 0.5 $380,000*Moderate Long-Term
4 Kennedy Sidewalk and Class II Bike Lane Kennedy Road Los Gatos Boulevard Englewood Avenue x x x x x x 0.2 $1,189,000*Moderate Mid-Term
5 Los Gatos Creek Trail Connector to Highway 9 Los Gatos Creek Trail / Highway
9
________________________x x x x x x 0.4 $4,281,700*Moderate Mid-Term
6 Pollard Road Complete Streets Pollard Road Knowles Drive Quito Road x x x x x 1.4 $84,000*Easy Short-Term
7 Shannon Road Multi Use Path Shannon Road Los Gatos Boulevard Cherry Blossom Lane x x x x x x 0.3 $1,190,000*Moderate Mid-Term
8 Winchester Blvd Complete Streets Winchester Boulevard Knowles Drive Blossom Hill Road x x x x x x 1.9 $15,000,000*Moderate Short-Term
4.2b BIKE PROJECTS
Project
Number Project Name Location From To Enhances safety Direct Access to Key
Destinations / Trails
Closes Existing
Network Gaps
Improves Safe
Routes to School
Improves Existing
Infrastructure
Existing High
Activity Area
Increases Bike
Activity
Length
(Miles)
Cost
Estimate
Ease of
Implementation Phase
9 Knowles Drive Class II Bike Lanes Knowles Drive Pollard Road Los Gatos Creek Trail x x x x x 0.7 $42,000 Easy Short-Term
10 Class IV bike path on Lark Avenue Lark Avenue Winchester Boulevard Los Gatos Boulevard x x 0.7 $140,000 Moderate Long-Term
11 Class IV bike path RQLos Gatos Boulevard Los Gatos Boulevard Northern Town Limits
(Highway 85) Shannon Road x x x x x x x 1 $2,000,000*Moderate Mid-Term
12 Enhance existing Class II bike lanes on Los Gatos Boulevard Los Gatos Boulevard Shannon Road Pleasant Street/Jackson Street x x x x x x 0.4 $250,000 Moderate Short-Term
13 Improve existing Class I bike path on Los Gatos Creek Trail with an enhanced unpaved surface Los Gatos Creek Trail Main Street Lexington Reservoir x x x x x x 1.8 $216,000 Moderate Short-Term
14 Class I or IV bike path on Los Gatos Saratoga Road (Highway 9) from University Avenue to Los Gatos Boulevard
Los Gatos Saratoga Road (Highway 9) University Avenue Los Gatos Boulevard x x x x x 0.6 $5,000,000*Complex Long-Term
15 Sharrows and Class III bike lane on University Avenue University Avenue Highway 9 Lark Avenue x x x x x x 2.4 $67,200 Moderate Mid-Term
4.2c PEDESTRIAN PROJECTS
Project
Number Project Name High Visibility Crosswalks Pedestrian Flashing
Beacons
Remove Free Right
Turns Enhances Safety Direct Access to Key
Destinations /Trails
Improves Access for
Mobility Impaired
Improves Safe
Routes to school
Improves Existing
Infrastructure
Existing High
Activity Area
Increases Pedestrian
Activity _____Cost
Estimate
Ease of
Implementation Phase
16 E.Main Street at Villa Avenue, High School Court &
Chicago Avenue X X x x x x x x x _____$169,200*Easy Short-Term
17 Santa Cruz Avenue at Blossom Hill Road X X x x x x x x _____$31,000 Moderate Short-Term
18 Santa Cruz Avenue at Broadway X X x x x x x x _____$21,000 Easy Short-Term
19 Santa Cruz Avenue at Los Gatos Saratoga Road (Highway 9) X X x x x x x x x _____$120,000 Moderate Short-Term
20 Santa Cruz Avenue at Main Street X X x x x x x x _____$68,500 Moderate Short-Term
21 Santa Cruz Avenue at Roberts Road X X x x x x x x _____$15,000 Easy Mid-Term
22 University Avenue at Los Gatos Saratoga Road
(Highway 9) X x x x x x _____$18,000 Easy Mid-Term
23 University Avenue at Main Street X x x x x x _____$59,000 Moderate Short-Term
*Projects with updated cost estimates based on 2020 analysis and engineering work.
dĂďůĞϰ͘ϮŽŶŶĞĐƚ>ŽƐ'ĂƚŽƐWƌŝŽƌŝƟnjĞĚWƌŽũĞĐƚƐ
ϫLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Project number Project Name Project Location From To Enhances
Safety
Direct Access to Key
Destinations / Trails
Closes Existing
Network Gaps
Improves Safe Routes to School
Improves Existing
Infrastructure
Existing High
Activity Area
Increases Bike
Activity Miles Cost Estimate Ease of
Implementation Phase
B1 Class II Bike Lane on Bicknell Road from Quito Road to More Avenue Bicknell Road Quito Road More Avenue x x x x 0.4 $24,000 Easy Short-Term
B2 Class II Bike Lane on Blossom Hill Road from Camino Del Cerro to the Eastern Town Limits Blossom Hill Road Camino Del Cerro Eastern Town Limits x x x 1.8 $500,000 Moderate Mid-Term
B3 Class III Bike Routes Sharrows on Camino Del Cerro between
Los Gatos Almaden Road and Blossom Hill Road Camino Del Cerro Los Gatos Almaden Road Blossom Hill Road x x x x 0.5 $14,000 Easy Short-Term
B4 Enhance existing Class II bike lanes on Cherry Blossom Lane
between Blossom Hill Road and Shannon Road Cherry Blossom Lane Blossom Hill Road Shannon Road x x x x x 0.2 $25,000 Easy Short-Term
B5 Sharrows on Cherry Blossom Lane between Los Gatos Almaden
Road and Blossom Hill Road Cherry Blossom Lane Los Gatos Almaden Road Blossom Hill Road x x x x x 0.5 $15,000 Moderate Short-Term
B6 Enhance existing Class II bike lanes on Daves Avenu between Winchester Blvd and Poppy Lane Daves Avenue Winchester Blvd Poppy Lane x x x x x 0.3 $7,500 Easy Short-Term
B7 Class III Bike Routes & Install “Share the Road” signs on Kennedy Road between Los Gatos Boulevard Shannon Road Kennedy Road Los Gatos Boulevard Shannon Road x x x x x 3.3 $10,450 Easy Short-Term
B8 Enhance existing Class II bike lanes on Los Gatos Saratoga Road (Highway 9) from Western city limits of Monte Sereno to
University Avenue
Los Gatos Saratoga Road
(Highway 9)
Western city limits of
Monte Sereno University Avenue x x x x x 1.6 $148,000 Moderate Short-Term
B9
Class III Bike Routes & Sharrows on Miles Avenue between
University Avenue and Balzer Field entrance to Los Gatos
Creek Trail
Miles Avenue University Avenue Balzer Field entrance to
Los Gatos Creek Trail x x x x x 0.2 $5,600 Easy Short-Term
B10 Class III Bike Routes & Sharrows on Marchmont Drive and
Hilow Road between Englewood Avenue and Shannon Road
Marchmont Drive and
Hilow Road Englewood Avenue Shannon Road x x x 0.6 $16,800 Easy Short-Term
B11 Class II Bike Lane on More Avenue from Pollard Road to Bicknell Road More Avenue Pollard Road Bicknell Road x x x x x 1.1 $66,000 Easy Short-Term
B12 Enhance existing route to incorporate sharrows on Pleasant Street, New York Avenue, and Bella Vista Avenue
Pleasant Street, New York Avenue, and Bella Vista
Avenue
________________________
x x x x x 0.4 $11,200 Easy Short-Term
B13 Class I Bike Path on PG&E Corridor from Los Gatos Almaden
Road and Camino Del Cerro to Eastern Town Limits PG&E Corridor Los Gatos Almaden Road
and Camino Del Cerro Eastern Town Limits x x x x 1.5 $1,700,000 Complex Mid-Term
B14 Class III Bike Routes “Share the Road” signs on Quito Road
between Pollard Road and Highway 9 Quito Road Pollard Road Highway 9 x x x 1.7 $5,390 Easy Short-Term
B15 Class IV Cycle Tracks on Roberts Road East from Blossom Hill
Road to Los Gatos Boulevard Roberts Road East Blossom Hill Road Los Gatos Boulevard x x x x x 0.3 $60,000 Moderate Short Term
B16 Class III Bike Routes & Sharrows on Santa Cruz Avenue
between Main Street and Shelburne Way Santa Cruz Avenue Main Street Blossom Hill Road x x x x x 1.2 $36,600 Moderate Short-Term
B17 Install “Share the Road” signs & Class III Bike Routes on
Shannon Road between Los Gatos Boulevard and Hicks Road Shannon Road Los Gatos Boulevard Hicks Road x x x x x 3.3 $10,450 Easy Short-Term
B18 Class II Bike Lane on Union Avenue from Thomas Drive to Los
Gatos Almaden Road Union Avenue Thomas Drive Los Gatos Almaden
Road x x 0.7 $42,000 Easy Mid-Term
B19
Class I Bike Path on Union Pacific Railroad right of way from
Winchester Blvd (just South of 85 Freeway) to Western town limits
Union Pacific Railroad right
of way Winchester Boulevard Western town limits x x x 0.8 $900,000 Complex Mid-Term
B20 Class I Bike Path on Northern trail and Western edge enhancements along Vasona Reservoir Vasona Reservoir Northern trail Western edge x x x x x 1 $1,500,000 Moderate Mid-Term
B21 Enhance existing route to incorporate sharrows on Westchester Drive between Camino Del Cerro and Blossom
Valley Drive
Westchester Drive Camino Del Cerro Blossom Valley Drive x x x x x 0.2 $5,600 Easy Short-Term
Table 4.3 Bicycle Improvement Projects
ϣϢLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Project Number Project Description Location At High Visibility Crosswalks Pedestrian Flashing Beacons Remove Free Right Turns Enhances Safety Improves Safe Routes to school Direct Access to Key Destinations / Trails Improves Access for Mobility Impaired Improves Existing Infrastructure Existing High Activity Area Increases Pedestrian Activity Cost Estimate Ease of Implementation Phase
P1
Blossom Hill Road sidewalk gap
between Regent Drive and
Union Ave
Blossom Hill Road Between Regent Drive
and Union Avenue x x x x $200,000 Moderate Mid-Term
P2 Daves Avenue at Kavin Lane Daves Avenue Kavin Lane x x x x x x x x $10,000 Easy Short-Term
P3 Fisher Avenue northside
sidewalk gap Fisher Avenue
Between Mitchell
Avenue and Roberts
Road
x x x x x x $200,000 Moderate Mid-Term
P4 Los Gatos Boulevard at Highway 9 Los Gatos Boulevard Highway 9 x x x x x x x x x $500,000 Complex Mid-Term
P5 Los Gatos Boulevard at Los
Gatos Almaden Road Los Gatos Boulevard Los Gatos Almaden
Road x x x x x x x $120,000 Moderate Mid-Term
P6 Main Street at College Avenue Main Street College Avenue x x x x x x x x x $21,000 Easy Short-Term
P7 Main Street at Pageant Way/Church Street Main Street Pageant Way /
Church Street x x x x x x x x x $24,000 Easy Short-
Term
P8 Pollard Road and Avenida Del Sol Crosswalk improvements Pollard Road Avenida Del Sol x x x x x x x x $10,000 Easy Short-Term
P9 Pollard Road and Wedgewood Avenue New Crosswalk Pollard Road Wedgewood Avenue x x x x x x $30,000 Moderate Mid-Term
P10 Roberts Road sidewalk gap Robert Road Between Oak Meadow Dr.and University
Avenue
x x x x x x $200,000 Moderate Mid-Term
P11 Santa Cruz Avenue at Andrews Street Santa Cruz Avenue Andrews Street x x x x x $12,000 Easy Mid-Term
P12
Santa Cruz Avenue at
Almendra Avenue/Petticoat
Lane
Santa Cruz Avenue Almendra Ave /
Petticoat Lane x x x x x x $12,000 Easy Mid-Term
P13 Santa Cruz Avenue at Bachman Avenue Santa Cruz Avenue Bachman Avenue x x x x x x $12,000 Easy Mid-Term
P14 Santa Cruz Avenue at Royce
Street/Nicholson Avenue Santa Cruz Avenue
Royce
Street/Nicholson
Avenue
x x x x x x $12,000 Easy Mid-Term
P15 Santa Cruz Avenue at Grays Lane Santa Cruz Avenue Grays Lane x x x x x $6,000 Easy Mid-Term
P16 Santa Cruz Avenue at Bean
Avenue Santa Cruz Avenue Bean Avenue x x x x x $6,000 Easy Short-
Term
Table 4.4 Pedestrian Improvement Projects Part 1
ϣϣLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Project Number Project Description Location At High Visibility Crosswalks Pedestrian Flashing Beacons Remove Free Right Turns Enhances Safety Improves Safe Routes to school Direct Access to Key Destinations / Trails Improves Access for Mobility Impaired Improves Existing Infrastructure Existing High Activity Area Increases Pedestrian Activity Cost Estimate Ease of Implementation Phase
P17 Santa Cruz Avenue at Elm Street Santa Cruz Avenue Elm Street x x x x x x x x $21,000 Easy Short-Term
P18 Santa Cruz Avenue just South of Elm Street (Midblock)Santa Cruz Avenue Just South of Elm Street (Midblock)x x x x x x x x $6,000 Easy Short-Term
P19 Santa Cruz Avenue just north of Main Street (Midblock)Santa Cruz Avenue Just North of Main Street (Midblock)x x x x x $3,000 Easy Short-Term
P20 University Avenue at Mullen Avenue University Avenue Mullen Avenue x x x x x x $6,000 Easy Mid-Term
P21 University Avenue at Elm Street University Avenue Elm Street x x x x x x $6,000 Easy Mid-Term
P22 University Avenue between Main Street and Elm Street
(midblock)
University Avenue Between Main Street and Elm Street
(Midblock)
x x x x x x x x x $18,000 Easy Short-
Term
P23 Westchester Drive and Blossom Valley Drive (near Alta Vista
Elementary School)
Westchester Drive at Blossom Valley Drive (Near Alta Vista
Elementary School)
x x x x x x x x $112,500 Easy Short-
Term
P24 Winchester/Bruce new crosswalk with RRFB Winchester Boulevard Bruce Avenue x x x x x x x $30,000 Easy Short-Term
P25 Winchester/Vineland Avenue new crosswalk with RRFB Winchester Boulevard Vineland Avenue x x x x x x x $30,000 Easy Short-Term
P26 Winchester/Millrich-Milani new crosswalk with RRFB Winchester Boulevard Millrich Drive - Milani Court x x x x x $30,000 Easy Short-Term
P27 Winchester/La Rinconada Drive new crosswalk with RRFB Winchester Boulevard La Rinconada Drive x x x x x $30,000 Easy Short-Term
P28 Winchester/Wimbledon Drive
High Visibility Crosswalk
Winchester
Boulevard Wimbledon Drive x x x x x x $10,000 Easy Short-
Term
P29 Winchester/Lark Avenue High
Visibility Crosswalk
Winchester
Boulevard Lark Avenue x x x x x x x $25,000 Moderate Mid-Term
P30 Winchester/Albright Way High
Visibility Crosswalk
Winchester
Boulevard Albright Way x x x x x x $10,000 Easy Mid-Term
P31 Winchester/Knowles Drive High Visibility Crosswalk Winchester Boulevard Knowles Drive x x x x x x $10,000 Easy Mid-Term
P32 Winchester Boulevard sidewalk gap Winchester Boulevard Between Creekside Cir. Newell Avenue x x x x x x $400,000 Moderate Mid-Term
Table 4.4 Pedestrian Improvement Projects Part 2
ϣϤLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Number Improvement Description Preliminary Cost
Estimate
Implementation
PhaseCROSSINGS
1 Install high-visibility crosswalks at all signalized intersections within Los Gatos and Monte Sereno, where feasible. (III) $3,000 per Crossing Mid-Term
SIDEWALKS AND CURB RAMPS
2 Complete a Town wide Sidewalk Inventory Depends Short-Term
3 Add missing sidewalks along arterial roadways in Town (III) Depends Mid-Term
4 Add missing sidewalks along identified school walking routes, with routes identified in the adopted “Los Gatos Safe Routes to School Phase 1” report. * (III) Depends Mid-Term
5 Add missing sidewalks along all arterials, collectors, and community collector roads within Downtown Los Gatos. (III) Depends Mid-Term
LIGHTING
6 Develop a Town wide Lighting Plan. This Plan would inventory existing lighting, identify specific locations for additional vehicular street lighting, as well as identify specific
locations to install pedestrian-scaled lighting.Depends Short-Term
7 Add lighting along arterial, collector, and community collector roadways in Downtown Los Gatos.* (II) (III) $5,000-$10,000 per
streetlight Mid-Term
WAYFINDING
8 Develop a Town wide Wayfinding Plan. This Plan would inventory existing signs, identify specific locations for new or additional signs, as well as recommend consistent
sign design standards and potential replacement of existing signs. (I) $75,000 Short-Term
9
Install information signs and kiosks at key destinations in Los Gatos. This includes identifying entrances to the Los Gatos Creek Trail, significant trailheads at Open Space Preserves, parks,
schools, hospitals, Downtown Los Gatos and other significant retail corridors, Town Hall and other civic facilities (post offices, libraries, etc.). The information signs and kiosks would provide a map
of the city and directions on how to get to other key locations.
Depends Mid-Term
BICYCLE AMENITIES
10 Install short-term bicycle parking in front of businesses or activity centers in Downtown Los Gatos or along Los Gatos Boulevard, at every park and school, and adjacent to
trailheads along Los Gatos Creek Trail and at entrances to Open Space Preserves.
$600 per rack
$2100 per locker Depends
11 Consider expanding the network of portable “fix-it” bicycle stations, including throughout the Los Gatos Creek Trail and at trailheads to major Open Space Preserves within the Town limits,
including but not limited to Belgatos Park, St. Joseph’s Open Space Preserve, and Santa Rosa Open Space Preserve $1,100 per station Short-Term
12 Install bicycle detection at all signalized intersections on designated bikeways.$2,000 per loop
detector Mid-Term
13 Install bicycle crossing warning signs at all unsignalized intersections on Class I designated bikeways.$100 per sign Mid-Term
14 Where feasible, widen existing Los Gatos Creek Trail and improve existing entrances to the trail. (II) (III) Depends Depends
15 Enhance existing Class II bike lanes by providing standard Caltrans “Bike Lane” signage as well as striping on both sides of bike lanes where there is on-street parking.$30,000 per mile Mid-Term
16 Designate recommended routes in the general plan, providing standard Caltrans “Bike Route” signage on all Class III routes shown on the Existing and Proposed Bikeways
Network Map.$300 per sign Depends
17 Enhance existing Class III routes, providing standard Caltrans “Bike Route" signage on all Class III routes shown on the Existing and Proposed Bikeways Network Map.$300 per sign Mid-Term
Prioritized projects are in Bold
All projects enhance safety
All projects increase bike/ pedestrian activity
Most Projects Improve existing infrastructure unless noted (I)
Projects identified along school walking route *
Projects with direct access to key destinations / trails (II)
Improves access for mobility impaired (III)
Table 4.5 Townwide Improvements
ϣϥLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Policy
Number Program Description Supports the Reduction of Fatalities Encourages Students to Walk/Bike Improves Connectivity of Bike/Ped Network Supports Shovel Ready Projects
EDUCATION AND ENCOURAGEMENT
A1a Develop pedestrian and bicycle safety education programs. X X
A1b Develop a road safety campaign. X
A1c Support existing and future Safe Routes to School efforts. X X
A1d Develop a “rules of the road” education program. X X
A1e Create and update Walk and Roll to School Suggested Routes for all public schools. X X
A2a Support educational efforts to discuss bicycling and walking benefits. X X
A2b Promote non-motorized modes of transportation. X X
A2c Encourage open streets events. X X
A2d Develop a Bike-Friendly Business program. X
A2e Create a bike and pedestrian friendly public realm. X X X
A2f Encourage events that promote walking and bicycling, including
“Walking School Buses” and “Bicycle Trains”. X X
A3 Encourage local employers to provide amenities and incentives,
encouraging their employees to bike and walk to work. X
A4a Create employee bicycling/walking programs for Town employees. X
A4b Create end-of-trip amenities at Town offices. X X
A4c Provide a bike share program for Town employees. X
ENFORCEMENT
B1a Support targeted enforcement of vehicle code violations that
inhibit walking/bicycling. X X
B1b Encourage alternatives to curbside placement of waste and
recycling containers. X X
B1c Continue to prioritize enforcement of traffic laws around schools. X X
B1d Consider expanding existing juvenile ticket diversion program. X X
ACCESSIBILITY / CONNECTIVITY
C4b Consider bicycle parking requirements and guidelines for incoming non-
residential development and redevelopment projects. X X
C4c Consider amending the Town code to require end-of-trip amenities at employment centers. X
ENGINEERING / DEVELOPMENT STANDARDS
D1c Complete a Local Roadway Safety Plan X X
Prioritized projects are in Bold
Table 4.6 Townwide Programs Part 1
ϣϦLOS GATOES BIKE AND PEDESTRIAN MASTER PLAN - CHAPTER FOUR 2020 UPDATE
Policy
Number Program Description Supports the Reduction of Fatalities Encourages Students to Walk/Bike Improves Connectivity of Bike/Ped Network Supports Shovel Ready Projects
ENGINEERING / DEVELOPMENT STANDARDS
D1d Consider removal of on-street vehicular parking. X
D1e Consolidate loading and waiting zones. X X
D1f Minimize driveway cuts. X X
D1g Limit roadway widening. X X
D1h Identify locations for new mid-block crossings. X X
D2a Incorporate best practices into facility design. X X
D2c Update “Right on Red” policies. X X X
D2d Install diagonal crossings at key intersections. X X
D2e Upgrade pedestrian signalization at key intersections. X X X
D2f Upgrade bicycle facilities at intersections with designated bikeways. X X X
D2g Consider bicycle signalization at key intersections. X X X
D2h Consider consolidating existing crossings. X X
D3a Continue to incorporate best practices in traffic calming. X X X
D3b Consider school zone speed limit reduction. X X X
D3c Consider the reduction, modification, or elimination of free-right turns. X X
EVALUATION / IMPLEMENTATION STRATEGIES
E1a Conduct annual progress assessments for implementation of the
BPMP. X X X
E1b Assess collision data concurrently with implementation of the BPMP. X X X
E1c Regularly update the BPMP. X X X
E2 Ensure regular inspection, maintenance and repair of bicycle and
pedestrian facilities. X X
E3 Evaluate current demands/needs for bicycle and pedestrian facilities,
including conducting numerical counts and use of parking facilities. X X X
E4 Develop a phased implementation strategy for the Bicycle and Pedestrian Master Plan.X X X
E5 Regularly seek funding to design and implement active transportation
projects. X X X X
E6
Collaborate with adjacent jurisdictions and regional/ state agencies to
pool resources and tie local bicycle and pedestrian projects into regional networks. X X X X
E7 Incorporate bicycling and walking into Town/City Transportation Demand Management (TDM) policies and strategies. X X
Prioritized projects are in Bold
Table 4.6 Townwide Programs Part 2